Loading…
Loading…
10,901 results • Best match
P/L Tarring in Km 0/225 to 0/760, C/O R/wall at Rd 0/00 to 0/015, Cement concrete pavement at Rd 0//00 to 0/100
C/o R/wall at RD 0/300 to 0/316)
Construction of retaining wall at Km. 0/050 to 0/060 and Providing and laying WBM G-II and cement concrete pavement at Km. 0/0 to 0/068
SH CO R wall at RD 2 045 to 2 062
SH Widening of narrow roaches 2.105 to 2.450
C/O R/Wall in km. 3/750 to 3/770) Near Land of Sh. Preetam Chand) (Under RRD Head
ROFD Km 6/810 to 10/600
P/L GSB, WMM and M/T in Km. 0/060 to 0/400)
Construction of Retaining walls, Breast walls, Cement concrete pavement, Wire Crate works, U-shape Drains and Cross drainage work at different RDs
Construction of 5/7 Metre wide formation cutting including retaining walls, providing and laying 90mm to 45mm size broken/ crushed soling stone aggregate and 63mm to 45mm size wearing stone aggregate at RD. 0/0 to 0/025 and 0/100 to 2/295
Providing and laying built-up spray grout, bituminous concrete in Km.0/0 to 1/0
SH P L WBM G II G III and Tarring in K M 0 0 to 0 500
Formation Cutting Providing and laying G.S.B WMM 20mm thick premix carpet and mix seal in Km 0/00 to 2/500)(Deposit Work)(Under BASP)
C/O Approach wall on both side at RD 0/250 to 0/270 and Bed cutting in hard rock at RD 0/270 to 0/315 and C/O Cement concrete pavement at RD 0/270 to 0/470
SH P L GSB WBM Grade II, I and premix carpet with seal coat in K M 2 0 to 3 500
SH Const of Gabion Wall between km 1815 to 1830 ic PCC Pushta and drain between km 1845 to 1860 and PL GSB WMM and Tarring between 00 to 0495 in extra width Against telecom deposit
SH. Formation cutting 5/7 mtrs wide road km 0/0 to 0/460. DC Deposit
C/O roller compacted concrete pavement at RD. 0/300 to 0/450).
Construction of 6.00 mtr span RCC slab Culvert at RD 0/310)
C/O R/wall at RD 0/030 to 0/036.50)
SH ROFD and C/o 900mm dia Hume Pipe Culvert at various RDs from km 0/0 to 0/660
SH Providing Cross drainage works at RD 0/720,1/035,1/210,1/450 and 1/715 and Providing and laying Kharanja stone Soling on various RDs
C/O Formation cutting at RD 0/200 to 0/380 600mm dia HP culvert at RD 0/0, 0/200, 0/300 and GSB, G-II and Cement concrete pavement at RD 0/0 to 0/170) under SCSP
SH- C/o RCCP from RD 0/150 to 0/165, 0/635 to 0/650, C/o Retaining wall at RD 0/444.50 to 0/480 and grade improvement at RD 0/500 to 0/555) under OTMNP Head
C/o, R/Wall in wire crate at R.D. 0/395 to 0/408
Providing and laying WBM G-I G-II and Bituminous Concrete
5/7 meter Wide Formation Cutting at RD 5/005 to 7/120
P/L 25mm thick bituminous concrete in kms 0/0 to 1/025 and G-III with 20mm thick premix carpet in patches and interlocking paver block at 1/440 to 1/500 and ordinary kms stone
C/O approaches of 3.00 mtr. span RCC slab culvert at RD 1/125 along with 900mm dia Hume pipe culvert at RD 1/160.
SH Providing wearing Coat G II and Tarring works in km 0/0 to 0/640
SH ROFD Soling and 900 mm dia HPC Pipe in k m 0 0 to 1 500
Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of pot holes in km 10/00 to 11/00
Construction of RWall at RD 0/075 to 0/095 and CC Pavement in Km 0/0 to 0/175
Providing and laying built-up spray grout, bituminous concrete in Km.0/0 to 1/0)
Formation Cutting, P/L GSB and C/o 3.00mtr Span RCC Slab culvert alongwith wing wall at RD 0/045
P/L 30mm thick Bituminious Concrete including profile correction in Km 2/000 to 3/230
Construction of crate wall at Km. 3/140 and 3/770 and 3/200 (Under PDNA)
SH Providing and laying Pot Hole , Bitumen Concrete and 2.5 mm thick road marking strips in Km 0/00 to 5/665
C/o 5/7mtr wide formation cutting from RD 2/525 to 2/555 (Under OTMNP
SH C/O B/Wall at RD 0/435 to 0/450 and R/Wall at RD 0/655 to 0/667.50,0/682 to 0/694.50
C/O bridge including both side approaches) Under SCSP Head
Formation cutting at RD-0-240 to 0-345 and 0-354 to 0-45 under State head
Construction of Cement concrete pavement from RD 0/607 to 0/840 and 1/300 to 1/365
C/o R/wall at various Rds. in between km. 0/0 to 0/735, P/L 900mm dia RCC hume pipe culvert at RD. 0/150,0/420, 0/600 P/L GSB, WMM Tarring in km. 0/0 to 0/750) ( D.C. Deposit)
Providing and laying Open-Graded Premix Carpet of 20 mm thickness at km 0.00 to 0.400
SH- P/L GSB,WMM and 2 cm thick premix carpet with seal coat in km. 0/0 to 0/500) (Under OTMNP)
SH C/O R/Wall at RD 0/960 to 0/980
SH Formation cutting 5/7 mtrs wide road in Km 1/300 to 2/500
Providing and laying built-up spray grout, bituminous concrete in Km.0/0 to 1/0)
Providing and laying 80mm thick paver block from RD 0/405 to 0/610 and Construction of Cement concrete pavement from RD from RD 1/040 to 1/245