Loading…
Loading…
10,901 results • Best match
(SH- P/L 25 MM thick B.C laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) between Km 0/00 to 1/00)
P/L 25mm thick bituminous concrete in kms 0/0 to 2/200 and G-III with 20mm thick premix carpet in patches and U-shape drain in kms 0/0 to 0/100 R/S, RD 1/350 to 1/450 R/S and interlocking paver blocks in kms 0/600 to 0/700.
FORMATION CUTTING IN KM. 0/00 TO 1/00, C/O R/WALL / B/WALL AT VARIOUS RDS IN BETWEEN KM. 0/00 TO 0/700 AND P/L 900MM DIA R.C.C. HUME PIPE CULVERT AT RD. 0/010, 0/525, 0/660) (UNDER O.T.M.N.P. HEAD).
Construction of Breast wall at RD 2/075 to 2/089
SH C-O Single cell RCC box type culvert 3m x 3m on road km. at RD 1-432
M/T work in extended portion providing protection work and C/o PCC drain between 0/08 to 1/650
Providing and laying GSB, G-II, G-III at RD. 03/525 to 03/780 and premix carpet in km. 03/300 to 03/780 and cement concrete pavement at RD 03/780 to 03/800
C/o PCC R/wall and CC pavement at damaged stretches at Km. 0/315 to 0/450) Under PDNA
Construction of Embankment and providing and laying 90mm to 45mm size hard broken/crushed soling stone aggregate from km. 0/0 to 1/500
SH Removal of formation defficiency and Cross drainage in Km 0/0 to 1/500
Cutting in earth work in RD 0/0 to 1/210
Construction of PCC Retaining wall with wire crate at R.D. 3/820 to 3/835 (Between R.D. 3/735 to 3/835), Construction of Retaining wall, crate work at R.D. 0/690 to 0/705 (Between R.D. 0/500 to 0/765), Construction of Breast wall at R.D. 0/600 to 0/6
Construction of R.wall and P.L Cement concrete pavement at various RDs BSP.2024.478 under Deposit
Providing and laying Cement Concrete Pavement from Km 0/0 to 0/075, 0/641 to 0/711, V-shape Drain at Km 0/665 to 0/715,Wire Crate from Km 0/670 to 0/720 (Breast Wall) and 0/680 to 0/695 (Retaining wall)
Formation cutting 5/7 meter wide in km 01/570 to 02/060
SH Construction of B/wall in wire Crate at Rd 0/410 to 0/490
SH Construction of R/wall at Rd 0/645 to 0/650 , 0/765 to 0/800
P/L CC Work at RD 0/070 to 0/085, C/O R/Wall at 0/070 to 0/075 and U-shape drain at RD 0/055 to 0/070, U-shape drain with E/Wall at RD 0/070 to 0/085, U-shape at RD. 0/085 to 0/095
Formation Cutting passing places Retaining walls , Breast walls , Breast walls ,C.D. works wire crate dumping site at various Rds
Construction of R/wall at RDs 2/881.80 to 2/886.10, 2/886.10 to 2/890.60 and 2/923.80 to 2/929.20
Construction of R.wall at D 0.450 to 0.464.30) Under Deposit BSP.2024.571
Construction of wire crate walls at Km 0/320 to 0/395) Under MMSY
SH- Providing and laying 80mm thick Cement Concrete Interlocking Paver Block
(SH- P/L bituminous concrete pavement) (Under Global Investor Meet)
Providing and laying Tack coat and Mix seal surfacing (25mm thick) in Km. 4/00 to 5/00
Providing and laying Tack coat and Bituminous Concrete
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 0/000 to 2/000
(SH- Providing and laying 20mm thick PC with seal coat Km. 1/0 to 3/0)
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 2/500 to 3/000
Providing and laying 30mm thick Bitumenous concrete in km. 2/0 to 2/600 and construction of Side drain in 100 Metre length
Providing and laying 30mm thick Bitumenous concrete in km. 4/0 to 4/590 and construction of Side drain in 100 Metre length
Providing and laying built-up spray grout, bituminous concrete in Km. 3/500 to 6/0
SH Providing and laying renewal coat by providing 30mm thick BC in Km7/0 to 8/0 and 12/0 to 13/0 including road marking
Providing and laying 30 mm thick bituminous concrete in km. 1/0 to 2/0
Providing AND Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 1/000 to 2/000
Providing and laying wearing grade-II for profile correction, built-up spray grout and bituminous concrete in Km.1/0 to 2/0).
SH-Providing and Laying 30mm thick Bituminous concrete laying with paver finisher in km 1/000 to 3/000
Providing and laying 30mm thick Bitumenous concrete in km. 0/0 to 1/0 and construction of Side drain in 100 Metre length
Providing and laying 30mm thick Bitumenous concrete in km. 1/0 to 2/0 and construction of Side drain in 100 Metre length
I Providing and laying 25mm thick Mix seal surfacing with Paver Finisher in Km 1/000 to 3/000
Providing and laying 30mm thick Bitumenous concrete in km. 3/0 to 4/0 and construction of Side drain in 100 Metre length
(Sub Head- Providing and laying built-up spray grout, Take Coat, Bituminous Concrete 30mm thick and Thermoplastic Strip in Km. 1/000 to 2/180)
P/L Tack coat 25mm thick bituminous concrete , Hot applied thermoplastic and routine maintenance for five year.
Providing and laying 30mm thick bituminous concrete and hot applied thermoplastic reflective paint strip in K.M. 4/0 to 4/600
Providing and laying 30mm thick Bitumenous concrete in km. 0/0 to 1/0 and construction of Side drain in 100 Metre length
Providing and laying 30mm single layer bituminous concrete (HP0404VR008815302) km. 1/200 to 4/350
Providing and laying 30 mm thick bituminous concrete in km. 0/0 to 1/0
Providing and laying 30mm thick Bitumenous concrete in km. 3/0 to 4/0 and construction of Side drain in 100 Metre length
SH providing and laying renewal coat by providing 30mm thick bituminous concrete and road marking in km 4/0 to 4/650
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 1/000 to 2/000)