SH C/o cement concrete pavement and retaining wall at various RDs
Earth work in kms 0/0 to 0/280, C/O RCC slab culvert at RD 1/385 , 900mm dia hume pipe culvert at RD 0/002, C/O U/V shape drain in various RDs and parapets between kms 0/0 to 0/285 and 1/0 to 1/665.
(SH F/C 5/7 Mtr. Wide road km 0/135 to 0/900)
P/L wet mix Macadam Tarring in km. 1/0 to 1/850)
SH C/o R/wall at RD 0/060 to 0/090, B/wall at RD 0/045 to 0/090 and Removal of Slips at Various RD
C/o R/Wall at RD 0/350 to 0/380, C/o Wire crate at RD 0/300 to 0/410 and CC pavement at RD 0/410 to 0/520)
C/O jeepable 5/7 mtrs wide road including essential CD work, Soling in km 0/0 to 1/500 (SW P/L premix carpet with primer coat and tack coat in Km.0/00 to 0/900)
Providing and laying 30mm thick Bituminous Concrete with Paver Finisher on Km 0/00 to 1/680
Formation Cutting for 5/7 mtrs. Wide, R/Walls, B/Walls, CD, M/T, Cement concrete Pavement, Drain , Parapets and road furniture rtc. In km. 0/00 to 1/500) Under NABAD RIDF-XXX including routine maintenance for five years.
SH C/O Wing Wall Both Side) (Under RRD Head)
C/O R/wall and B/wall at various RDs in km. 0/00 to 0/515
Construction of PCC and crate work Retaining walls at R.D. 3/790 to 3/815 (Between R.D. 3/735 to 3/835)
Formation cutting R wall and B wall HPC Essential soling road side katcha drain essential parapetrs F Singh bord Km. stone and dumping structure etc in Km. 0.0 to 8/00 under NABARD RIDF XXIV
P/L GSB,WMM and tarring in km. 0/0 to 0/555) Under OTMNP Head
Formation cutting, passing place, retaining walls, cross drainage work, GSB,WBM-II,III, tarring work, side drain, parapets and road furniture etc. Including routing maintenance for five year
P/L GSB, WMM in km. 2/300 to 2/915 and 2.5cm thick premix carpet with seal coat in km. 1/600 to 2/915
Providing and laying 30mm thick Bitumenous Concrete at RD. 2/0 to 2/650 kms
SH Providing wearing coat GIII and Tarring works in km 1/150 to 2/00
C/o 4.00 meter span RCC Slab Culver at RD 6/920
Construction of Retaining wall at R.D. 2/010 to 2/020, 2/680 to 2/690 and 2/765 to 2/790
Construction of PCC Retaining walls at R.D. 0/885 to 0/985, (Between R.D. 0/885 to 0/985), 1/040 to 1/050 (Between R.D. 1/015 to 1/050), 1/230 to 1/240 (Between R.D. 1/220 to 1/260), 1/800 to 1/830.20, 2/055 to 2/065 (Between R.D. 1/800 to 2/065)
Construction of PCC and crate work Retaining walls at R.D. 3/735 to 3/765 (Between R.D. 3/735 to 3/835)
C/o 5/7mtr. Formation cutting at RD 2/475 to 2/527 and 2/615 to 2/945, CC pavement at RD 2/527 to 2/537 and R/wall at RD 2/315 to 2/325, 2/610 to 2/615 and 2/740 to 2/755) Under OTMNP
(C/o 5/7 mtr wide Formation Cuttig in km 0/00 to 1/00) MNP
Providing and Laying WBM Grading-I, Grading-II, Grading-III, M/T, C/o Road side Katcha Drain in Km 0/0 to 2/0
C/O R/wall at Rd 1/660 to 1/720
C/O 900mm dia HPC at RD 0/060, 0/2530 and P/L CCP at RD 0/0 to 0/025, 0/270 to 0/330 and 0/700 to 1/0) OTMNP
Providing and laying wearing grade-II and tarring at Km. 1/0 to 1/800
Providing and Laying Tarring in Km. 0/0 to 1/0) (Under SCSP).
SH C/O HP Culvert at RD 0/040 CC drain providing and laying metalling and tarring in km 0/0 to 0/570
(Sub Head - Providing and laying stone soling and cement concrete pavement at Rd. 0/0 to 0/045 BSP SID BSP/2021/438 under Deposit)
P/L CC Pavement in km 0/00 to 0/200
SH C O Balance work of 5 mtrs span culvert
SH 30 mm Bituminous concerete Thermoplastic paint strip in K m 0 0 to 1 0
Providing and laying concrete work on footpath Both side.
SH- Providing and laying soling G-I, G-II and G-III, Metalling and Tarring, PCC V-Shape drain etc. and PCC Parapets in Km. 0/00 to 1/00
P/L soling grade 1 and wearing grade ii in kms 1/070 to 1/320 and const of 3 mtr span RCC SLAB CULVERT at RD 1/125
( SH C/O Extension home pipe culvert in km. 1/600) Under SCDP
P/L Cement Concrete pavement at Rd. 0/150 to 0/192 and R/wall at Rd. 0/165.50 to 0/170) ( G.P Lodhar) ( D.C. Deposit)
C/o R/wall at Rd 0/225 to 0/237 and U-shape Drain km 0/190 to 0/250
SH Providing and laying Roller Compacted Concrete Pavement at RD 1/500 to 1/650
C/o wire crate R/wall at RD. 0/120 to 0/147)( G.P) Tipper ) ( Under OTMNP Head)
Construction of PCC Retaining wall at various RDs
Formation cutting in Km. 0.0 to 0.303 (Deposit Work VKVNY .2024.1294
C/o R/wall in km. 5/060 to 5/075)
P/L CC work in Km 0/210 to 0/360.
Cutting 5/7 meter wide at R.D. 0/220 to 0/345
C/o R/wall at Rd 1/656 to 1/671.80)
(SH- Providing and laying soling wearing Cement concrete pavement in Km. 0/950 to 1/200) SCSP
(SH- P/L 25 MM thick B.C laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) between Km 0/00 to 1/00)