Loading…
Loading…
10,901 results • Best match
Construction of road from NH to Govt. High School Tanda via Saheed Capt. Vikram Batra College to connect SC Basti road Km 0/00 to 3/500. (SW- Metalling Tarring at various RD 1/290 to 1/900 and 2/045 to 2/220 (SCSP).
Construction of road from Plakh to Charuri and Malhari to Duhag km. 0/0 to 3/555 including bridge over Duhag khad SH Formation cutting, Retaining walls, Cross Drainage Works, GSB, WBM II, WBM III, Tarring, Drain, Parapet and Const. of 43.20 mtr. spa
Construction of road leading from Junga road Chauhan Niwas Via Chandel Niwas at Roop Colony in ward No.26 Phanthaghti RD 0 0 to 0 198 Phase I (SH Construction of Retaining wall Cutting B wall etc in RD 0 118 to 0 198)
Construction of road from Aghar Mandi to Thuian via Baniyana Village and G.P. Rey Km. 0.0 to 2.600 SH Formation cutting from RD. 0.00 to 0.350 Construction of retaining wall at RD 0.070 to 0.090 0.120 to 0.125 0.150 to 0.160 and providing and layi
Construction of road and road side drain and dressing of berms road leading from Main road to M/S Surya Textube at I.A. Kala Amb Distt. Sirmour (HP). (SH- Balance work, providing and laying interlocking pavers from main road to M/S Pidilite Indust
Tender for Shifting of 22 KV HT line of Nihri Feeder and LT line from various existing DTRS come across widening and improvement of Slapper to Tattapani road construction under ESD , HPSEB,Ltd. Nihri
C/O Causeway over Juh Nallah on Pantehar School to Kunjeswar Mahadev Temple road. (Under SCSP)
Please refer uploaded documents
Construction of 2.00 mtr span RCC slab culvert at RD 0/080 and P/L Kharnja stone soling and C.C. Pavement at RD 0/00 to 0/081) (Deposit work) MMRSY
Please refer uploaded document
C/O Sub-structure super structure of 33.50 metrs ,span bridge , C/O approach road G.I. wire mesh fencing, M/T , C.D. work, PCC parapets , V-shape drain km. 0/00 to 2/240)(Balance work thereof
(Part-1) C/O Building Portion, WS SI, Septic Tank, Rain Water Harvesting Tank, Site Development and approach road). (Part-II (Electrical Works) (SITC Electrical Installation, lifts, Addressable Fire Alarm, fire fighting system, MGPS system, Solar P
(SH - P/l 30mm thick bituminous concrete in Km 3/00 To 3/640)
(SH - P/L 30mm thick bituminous concrete in km.3/0 to 4/0
(SH - P/L 30mm thick bituminous concrete in km.4/0 to 5/0
Providing and laying Tack coat and 25mm thick Bituminous Concrete in Km 3/0 to 5/0.
(Sh - P/L 30mm thick Bituminous concrete in KM 0/00 to 0/400)
(Sh - P/L 30mm thick Bituminous concrete in KM 0/00 to 0/450)
(SH - P/L 30mm thick bituminous concrete in km.5/0 to 5/600
( Sh - P/l 30mm thick bituminous concrete in Km 2/00 TO 3/00
Providing and Laying 25mm thick Bituminous concrete laying with paver finisher and hot applied thermoplastic compound in km 0/00 to 1/00 ,3/00 to 4/00
(SH - P/l 30mm. thick bituminous concrete in Km1/00 to 1/500)
(Sh - P/l 30mm thick bituminous concrete in Km 0/00 to 1/00)
Construction of road path towards colony at Anu under ED Hamirpur
Providing and Laying Built up spray Grout Single layer, Tack Coat and 30 mm thick Bituminous concrete at Km 0/0 to 1/0)
C/O 900mm dia HPC at RD 0/0, 0/210, 0/530 and 0/800 and P/L CCP at RD 0/0 to 0/200) OTMNP
P/L G-II and Tarring in Km 0/400 to 1/300
P/L 30mm thick bituminous concrete in kms 0/0 to 0/960 I/c paver block, G-III in pot holes and C/O drain at RD 0/300 to 0/345 and 0/695 to 0/750.
C/O B/wall at RD 0/960 to 0/975, V-shape drain at RD 0/450 to 0/750 P/L 20mm thick premix carpet at RD 0/450 to 0/600). (under MMGSY)
(Providing and renewal coat at Rd 0/0 to 4/0 0/0 to 2/0)
C/o R/wall at RD 1/263 to 1/300 in Both side
SH M T in K M 0 0 600 to 1 00 UNDER SCSP
C/o 1.00m Span RCC Slab Culvert at RD1/615
Providing and laying 30mm thick Bituminous Concrete with Paver Finisher on Km 1/00 to 2/00 and 2/00 to 3/00).
SH Construction of Retaining wall at RD 2/300 to 2/310 LHS and Breat wall at RD 2/750 to 2/760 RHS
Formation Cutting at Km. 1/495 to 1/900, P/L 900mm dia RCC hume pipe culvert at Rd. 0/765 and P/L M/T in km. 0/600 to 0/975) Under SCSP Head
ROFD in RD. 0/150 to 0/345).(Under OTMNP).
Formation cutting, C/o R/wall, B/wall ,CD work,U and V-Shape Drain, Parapets and P/L GSB, WMM and Premix carpet with seal coat in Km 1/045 to 1/500 ) UNDER NABARD RIDF- XXVI
5/7 meter wide Formation Cutting in km 0/0 to 1/330
Formation cutting 5/7 mtr. Wide road km. 0/0 to 0/700) Under D.C. Deposit
SH 30 mm Bituminous concerete Thermoplastic paint strip in K m 0 0 to 1 0
Providing and Laying interlocking concrete block pavement in Km 0/00 to 0/240
SH ROFD at RD 0/300 to 0/500, Breast wall at RD 0/330 to 0/360 and Metalling and tarring in km 0/300 to 0/500
P/L stone aggregate grade-III and 20mm thick premix carpet with seal coat in kms 1/410 to 2/0.
Providing and laying Interlocking concrete block pavement at Rds 1/775 to 1/825 and CO V-shape drain at RD 0/500 to 0/810 )( both side ) Under SCSP Head
SH P L 25mm thick BC
F/C work, 5/7 meter wide providing X-drainage work, soling M/T road side drain, parapets and providing and fixing Km. Stone, direction and place sign board and painting line etc
P/L cement concrete pavement in km 1/030 to 1/125, 1/425 to 1/460 with U-Shape drain grating work)
SH Construction of V-Shape drain and berms with PCC 1 3 6 on various RDs under OTMNP Head
(Sub Head - Providing and laying Kharanja soling and Cement Concrete Pavement in Km. 2/0 to 2/048)