Loading…
Loading…
10,903 results • Best match
(SH- F/C, Missing cross drainage works. Metalling Tarring, side drain, Parapets and road sign boards including five years maintenance).
P/L 30mm thick bituminous concrete in kms 1/0 to 1/150, 1/170 to 1/370, 1/390 to 1/675, 1/690 to 2/750, 2/800 to 2/900 and 80mm thick (ISI) marked paver block in kms 1/150 to 1/170, 1/370 to 1/390, 1/675 to 1/690 and 2/750 to 2/800
SH ROFD at RD 0/550 to 0/800 C/O Hume pipe culvert at RD 0/630 Providing and laying Paver block at RD 0/650 to 0/670 C/O V-Shape drain at RD 0/550 to 0/800 and Metalling/Tarring at RD 0/550 to 0/800
SH Formation Cutting including retaining wall in between RD. 0/0 to 1/0 and Cross drainages work at RD. 0/285 0/438 0/585 alongwith wing walls
Construction of 3.00mtr Span RCC Slab Culvert at RD 0/945, V-Shape drain from RD 0/630 to 0/750 Hume pipe culverts at RD 0/060 and 0/615) SCSP
P/L 20 mm thick Premix carpet with seal coat Km 1/00 to 2/00) (portion Sari to Halon Khurd road) (SCDP)
Construction of Breast wall at RD. 0/730 to 0/870 (Left side) and 0/710 to 0/870) (Right Side)
Formation cutting at R.D. 0/0 to 1/730
SH Removal of formation deficiency CD works Retaining wall CC Pavement GSB WMM MT works PCC drain and Parapets and minor bridge Const of 20 meter RCC Girder Bridge at RD 2920 Under Nabard RIDF XXIX
Removal of formation deficiency at RD 0/000 to 0/360, RCC Hume pipe 900mm dia culvert at RD 0/165, C/O edge wall at RD 0/000 to 0/060 and P/L Interlocking concrete paver block pavement at various RDs
P/L 30mm thick bituminous concrete in kms 0/050 to 1/0 including 80mm thick ISI marked paver block in kms 0/0 to0/050
SH Co PCC VShape drain in km 0 0048 to 0 188 and RD 0 242 to 0 375 and U Shape drain in km 0 195 to 0 238 Co PCC Breast wall at RD 0 048 to 0 070 0 090 to 0 165 and R wall at RD 0 150 to 0 155 0 232 to 0 238 and 0 250 to 0 265 0 365 to 0 375 and MT
Providing and laying cement concrete paver block in Km. 0/0 to 0/065, BUSG, bituminous concrete and drain in Km. 0/065 to 0/635
P/L WBM-II and 20 mm thick Premix carpet with seal coat Km 0/0 to 1/00) (portion Sari to Halon Khurd road) (SCDP)
C/o R/wall at RD 1/210 to 1/263 (both sides), B/wall at RD 0/560 to 0/620 and 0/635 to 0/680, C/o 1.00 mtr. Span Kuhal crossing at RD 1/295, 1.00 mtr. Span RCC culvert at RD 1/209 and U-shape drain at RD 0/710 to 0/910
Restoration of rain damages on Anti Subhar Road Km 0.0 to 12.300 SH CO Breast wall at RD 7.900 to 7.937 and 8.765 to 8.801
SH Providing and laying GSB WMM and 25mm bituminous concrete in km 0/0 to 0/500 under MMGSY
Construction of Cement concrete pavement at various RD,s). Deposite.
P/L Cement concrete pavement at Rd. 0/270 to 0/435, C/o R/wall at Rd. 0/705 to 0/715) ( ( D.C. Deposit)
C/O CCP at RD 0/445 to 0/571
C/o 900mm dia Hume Pipe Culvert at RD 0/780) DC Deposit
SH Renewal Coat in Km 0/00 to 0/960
C/O approaches of culvert i.e. R/wall, Breast wall and Const.of soling causeway at RD 1/670 to 1/680.
ROFD, Protection work, Cross Drainage work, MT road side drain, Road Safety work and dumping Site) km 0/0 to 2/570 under NABARD RIDF-XXX
(SH- Providing and laying 25 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 1/00 to 2/00)
C/O CCP at RD 0/571 to 0/720
(SH- C/O R/Wall, Providing and erecting crash barrier).(Under NABARD)
SH Construction of 5/7 mtrs. Wide road formation cutting C.D. work construction of retaining walls at RD 0/0 to 0/500
P/L cement concrete Pavement at km 0/00 to 0/075
5/7 meter Wide Formation Cutting, CD Works, Retaining Structure and Providing and Laying Soling Parapets and Sign Boards etc. in Km 0/0 to 7/120
Providing and laying C.C.Pavement at RD RD 0/050 to 0/231 ) (OTMNP)
Cutting work for removal of formation deficiency, construction of PCC retaining wall, breast wall, cross drainage work, RCC slab culvert, providing and laying WBM-I,II and III, Metalling and Taring work, road side drain and parapets
SH Formation cutting 5/7 mtr wide in Km 5/135 to 5/510
ROFD, C/o R/Wall and Edge Wall between KM 0/500 to 1/200
P/L Solid Causeway at Rd 10/300 to 10/370, 12/510 to 12/530, 13/500 to 13/530 on Bhota Bijhari road) (Under PDNA)
Construction of Hume pipe culvert at RD. 0/020, Embankment at RD. 0/066 to 0/081, U-Shape Drain at RD. 0/0 to 0/060 and Retaining wall approach slab LHS at RD. 0/066 to 0/071, RHS at RD. 0/066 to 0/071 and Wire Crate at RD. 0/071 to 0/081)
Construction of PCC retaining wall, Edge wall, P/L M/T, cement concrete pavement and crash barrier) (BASP)
SH - C/o road connectivity from Vir Chowk to SPTI complex at Chetru including 50.00 mtr. Span PSC box grider bridge over Manjhi Khad
SH Providing and laying Metalling/ Tarring in Km 0/300 to 0/500 C/O Retaining wall at RD 0/315 to 0/320 0/370 to 0/390 LHS and C/O V Shape drain at RD 0/300 to 0/375
Restoration of rain damared on rohtan up to Chatnol dogri Km 0.0 to 6.180 SH CO Retaining wall at RD 2.250 to 2.277
C/o 900mm dia hume pipe culvert at R.D. 0/003 and 0/145, PCC R/wall at R.D. 0/068 to 0/123.50, P/L CC pavement at R.D.0/068 to 0/272, construction of 1.00mtr. span slab culvert at R.D.0/182) Under Chief Minister Announcement work
Construction of 2 No. hume pipe culverts alongwith wing wall and construction of retaining wall at various RDs
Construction of 2 Nos. HPC culverts at RD 0/360 and 0/650 and Providing and laying Kharanja Soling in km 0/600 to 1/00 and Gr-1 in km 1/00 to 1/500) (Under SCSP)
Matalling and tarring in Km 0/000 to 1/000, Interlocking paver block in Km 0/435 to 0/460 and side drain at various RDs etc
C/O cement concrete pavement at RD 0/350 to 0/660) MMGSY
F/c 5/7 mtr. Wide, protection works, CD works, side drain etc. in Km. 0/0 to 4/500 under NABARD RIDF-XXVIII, Distt. Mandi H.P.
SH C/O 5/7 mtr. Wide road formation cutting at RD 0/255 to 0/400 R/wall at RD 0/225 to 0/245 and construction of 900mm dia Hume pipe culvert at RD 0/310 Under OTMNP Head
SH- ROFD km 0/0 to 0/540, C/o Retaining walls at various RDs and CD work) under OTMNP RNS Head at RD 0/0 to 0/020, 0/100 to 0/120 and 0/260 to 0/280) Under OTMNP Head
Construction of Embankment at RD.0/300 to 0/400 and C/o cement concrete pavement at Rd.0/00 to 0/400(Targeted ) (SCSP )