Loading…
Loading…
10,901 results • Best match
SH Construction of R/wall at Rd 5/330 to 5/360
PL Interlocking paver block flooring in Km. 0/200 to 0/258 Under OTMNP Head.
SH C/O R/Wall at RD 4/638 to 4/650.10, B/Wall at RD 4/658 to 4/678.10
C/o 2.00mtr. Span Slab Culvert at RD 1/200 under Deposit
C/O 3.00 mtr span RCC slab type culvert at RD 0/630 alongwith wing walls). (under MMGSY)
(SH- P/L C.C. Pavement at RD 0/10 to 0/280)(Deposit work)
Hume Pipe Culvert at RD 1/275 and C/o R/Wall at RD 1/235 to 1/243 under Deposit
Construction of 2.00 mtr span RCC slab culvert at RD 4/490, C/O 900mm dia Hume pipe culvert at RD 4/343 providing and laying cement concrete pavement road and C/O drain between Km 4/000 to 4/400
Providing and Laying Soling and Metalling and Tarring in km 4/015 to 5/015
C/O R/wall at RD 0/960 to 0/978.50
Formation cutting and filling in widening at Rd.1/210 to 1/330
SH Removal of formation deficiencies in K m 0 0 to 0 500 RCC 900 mm dia pipe culvrert at Rd 0 160 and 0 440 under SCSP
CC Pavement, C/O Edge wall in km 0/500 to 0/870). (under MMGSY)
SH Providing and laying Kharanja Stone Soling at rd 0/495 to 0/635 and Removal of Slips at Various Rds
SH C/O B/wall at Rds 8/380 to 8/405
Sub Head- Construction of Breast Wall 0/080 to 0/137 i/c Drain) Under OFC Head.
Construction of road from Kishanpura to Santoshgarh upto NH-72 Puruwala km 0/0 to 3/800 in Tehsil Paonta Sahib Distt. Sirmour H.P. (SH-C/O embankment, P/L C.C.1,3,6 in edge walls, GSB and wet mix macadam, RD 3/420 to 3/800) Under MNP.
Providing and laying 30mm thick bitumen concrete with pavement in Km 2/000 to 4/000)
Construction of 900mm Hume pipe culvert at RD 0.165 ,0.225 and 0.910 including both side wing wlls and providing and laying Kharanja soling in slushy reaches between 1.200
P/L 60 mm thick Cement Concrete Paver Blocks
Repair of road in km. 0/0 to 12/0, C/o R/wall at Rd. 2/100 to 2/114.70( D.C. Deposit)
Repair of road at km 0/00 to 1/800, C/O R/wall at Rd. 0/400 to 0/410.60) (DC Deposit)
Repair of road at km 0/00 to 5/500, (C/O R/wall at Rd.5/400 to 5/420) (DC Deposit)
Repair of road in km. 0/0 to 12/0, C/o R/wall at Rd. 4/200 to 4/214.70) ( D.C. Deposit)
C/o brick boundary wall, interlocking paver and w-metal beam crash barrier at proposed 33/11 KV 2x 1.6 MVA Sub-Station at Bali Chowki under ESD HPSEBL Balichowki in Distt. Mandi (HP)
Improvement of sharp curves black spot on Parwanoo Gadyar road in km 0/0 to 13/795 SH Improvement of road between km 11/955 to 12/00 and 12/030 to 12/135
Improvement of road, C/O R/wall at RD 0/00 to 0/08, B/wall at Rd 0/05 to 0/023 and CC pavement work Km 0/00 to 0/135) (MMGSY)
R/R Damages on Badech to Chislaad link road Km 0/00 to 1/270 SH Removal of Slips at Various RDs Between Km 0/00 to 0/300
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 2/000 to 3/000
SH Providing and laying 30mm single layer bituminous concrete HP0404VR005315302 km. 1.00 to 2.00 and 3.00 to 400
Initial Recti. Period ical Rnwl Coat with 25mm thick Bitum. Concrt Routine Mai nt. for 5yrs1 Sihua n to Bharnoli 0/0 to 2/450 L-083 Pck gHP04130,2 Bhatol i to Bhaloon0/ 0 to 4/930 L-025 Pckg HP04155,3 Dehra Jawali to Bajhera 0/0 to3/900L054 Pckg04102
Providing and laying built-up spray grout, tack coat, bituminous concrete 25 mm thick and thermoplastic strip in Km 12/00 to 13/00, 13/00 to 14/00 and 14/00 to 15/00
P/L 30mm thick bituminous concrete in kms 0/0 to 1/0 including G-III in patches interlocking paver block, C/O drain and thermoplastic strips.
Providing and laying built-up spray grout, Take Coat, Bituminous Concrete 25mm thick and Thermoplastic Strip in Km. 1/0 to 4/0)
Providing and laying of 25mm thick Bituminous Concrete in km 0/00 to 2/300) including 5 year Post DLP
Providing and laying built-up spray grout, bituminous concrete in Km.260 to 27/0)
(SH Providing and laying 30 mm thick bituminious concrete in km 0/0 to 2/800
Providing and laying built-up spray grout, bituminous concrete in Km. 1/0 to 2/0
P/L 25mm thick bituminous concrete and Thermoplastic line in Km 15/00 to 16/00, 16/00 to 17/00 and 17/00 to 18/00
Providing and Laying BUSG Bituminous concrete in kilometer 6-0 to 9-0 and edge line
SH Providing and laying renewal coat with BC Km. 5/0 to 7/0 and 2.5mm thick 10cm wide thermoplastic paint.
Providing and laying built-up spray grout, bituminous concrete in Km.0/0 to 1/0)
Providing and laying 30 mm thick Bitumen concrete including profile correction laying with paver finisher in Km 1/0 to 2/0)
Providing and laying built up spray grout, mix seal surface in Km. 1/0 to 2/100
) ( SH - Providing and laying 25 mm thick mix seal surfacing laying with paver finisher , Road marking strips of Hot applied Thermoplastic compound (Painting line) between KM 0/00 to 1/550)
Providing and laying built up spray grout, mix seal surface 25mm thick in Km. 0/0 to 1/0 and 3/0 to 4/0).
Providing and laying built-up spray grout, tack coat, bituminous concrete 25 mm thick and thermoplastic strip in Km 7/0 to 8/0 and 8/0 to 9/0
Providing and laying 30mm thick bituminous concrete pavement in Km 3/000 to 4/000 and 4/000 to 4/500
Providing and laying built-up spray grout, bituminous concrete in Km.25/0 to 26/0
Providing and laying built-up spray grout, bituminous concrete in Km.24/0 to 25/0