A R M O on Nahal Sheetalvan Kalgaon Teer Km RD 0 00 to 1 500 SH Widening of road from RD 0 680 1 500 P L Kharanja stone soling from RD 0 700 to 0 900
Periodical renewal on link road Bagani to Badnai to Badani via Tannan Baldoon for the year 2024- 25 (SH Providing and laying 25mm thick Mix seal Surfacing in km. 4/0 to 4/900)
Construction of link road from Uttri to Kumarli via Patan Km 0/0 to 2/500 (SH- Construction of 6nos 900 mm dia RCC Hume Pipe Culvert at RD 0/300,0/725,1/420,1/655,1/675 and 0/140 Patan side)
Construction of link road from Dev Ka More to Harijan Basti Bobri Khodri Km 0/0 to 6/0 ( SH- Construction of balance work of Cross-Drainage and Retaining structure in Km 0/0 to 2/010)
(SH P/L Tack coat 30 mm Bituminouse Concrete and Thermoplastic Layer on Link road to Village Baloh L-033 KM 0/00 to 1/200.
A/R and M/O on various panchayat road under Nalagarh (Constituency (NDF/ 2022/453, R/O repair of link road to village Kallri to Jabakhar Mohal and NDF/ 2022/454, R/O of link road to village Ghegsi Mohal). ( Hiring of JCB for removal of slips) D.C dep
Job 4 Construction of link road connecting Gurudwaras i.e. Girgira Sahib, Roti Ram ka Dera, Rangi Ram Ka Dera and Tahli Sahib Under Haroli Constituency Distt. Una km. 0-/0 to 9-/700 Sub Head C./O Link road Girgira Sahib to Rangi Ram Ka Dera for For
Const of link road Jole to Kaint via Bhooran Amroh Dhrun Sanjhot km 000 to 14255 and Const of link road to Village Dhussara km 000 to 1900 Providing and Eracting metal Crash Barrier at RD 3500 to 3550 and RD 1/730 to 1780 Against Improvement of
Job 3 Periodical maintenance of link road Gondpur Baliwal road to Guawa km. 0-0 to 1-0 Sub Head Patch work, 30mm thick bituminius concrete,zebra crossing in km. 0-0 to 1-0 VR164 , Link road Subowana to Bankhandi via Harijan Basti km. 0-0 to 1
Construction of link road from upper Aeirla, Gadrana to upper Danoa via Pallu Baroh Km 0/00 to 7/310 in Distt. Kangra (H.P.) (SH-Construction of link road from upper Aeirla, Gadrana to upper Danoa via Pallu Baroh Km 0/00 to 7/310 in Distt. Kangra
Job 4 Periodical maintenance i. link road from Lower Kanger to Harijan Basti Kanger VR157 km. 0-0 to 1-500 ii link road to Village Jongpur from Gondpur Baliwal road VR-159 km. 0-0 to 0-280 Sub Head Patch work , 30mm thick BC, Zebra Crossing and
Job 9 Periodical maintenance on link road to village Bharolian Kalan road km.0-00 to 1-200 Sub Head Patch work , 30 mm thick BC , zebra crossing and side lines VR097 ii Link road Behdala Chattara Pirnigah road km. 0-0 to 0-040 Sub Head Patch wo
P/L 30 mm thick Bituminous Concrete in Km 16/0 to 20/0
Providing and laying 30mm thick Bitumenous concrete in km. 0/0 to 1/0 and construction of Side drain in 100 Metre length
Construction of Link road from National Highway Near Punjab Kesri Office toward Neugal River from Hotel in GP Pharer (SH- Providing laying CC work).
Repair of link road to S.W.M. Site w. no.3 nagar panchayat Arki(S.H.P-L factory made chamfered edge 80mm thick ISI Mark c.c. paver block M-30 grade with approved colour, design and pattern
(SW- P/L with paver finisher , road marking strips of hot applied thermoplastic compound (Painting line ) between Km 0/00 to 2/270 i/c five years routine maintenance)
S.H Widening of road k.m. 1.125 to 1.830
SH widening of road at Rd9.240 to 9.285
Special repair of approach road leading to Bharyal Plant from Taradevi Totu Byepass in ward No 7 Majiyath (SH Providing and Laying CC 1 2 4 and Construction of V Shape Drain)
A/R and M/O Approach Road Helipad to Police Station Sangrah km. 0/00 to 0/900 (SH - C/O PCC V-Shap drain from km. 0/00 to 0/900)
Restoration of approach road from RD 605 to RD 685 to 22.50MW Ganvi Power House Stage-I on the right bank of Ganvi Stream damged due to heavy flood in Ganvi Stream.
Construction of Approach road at PHC Raja-ka-Talab SH Construction of 1.00mtr. span Culvert at RD 0.135 and Providing and laying Cement Concrete pavement at RD 0.0 to 0.155 Deposit work.
Construction of Irrigation canal to Bias Bhood road Km. 0/0 to 1/600. (SH- Construction of 3 mtrs. Span RCC Slab Culvert at RD 0/540 alonwith approach road). under MMGSY.
C/o 100 Bedded Hospital Bldg i/c site development at Anni Tehsil Anni Distt Kullu HP Balance work of main building Mortuary Approach road Drainage and Medical Gases Pipe Lines etc
Restoration of rain damages to various residential qtr Under Brock hurst Shimla 2.SH Construction of Retaining wall in approach road to type 1 set no 1 to 24 at Brock Hurst.
M/R to DPRA Bunglows Bemloe, Park Area & Chotta Shimla during 2023-24. SH: Repair and restoration pf approach road of A-6 & A-3 Defence Pool Bunglows at Bemloe, Shimla (H.P.)
C O Link road to Village Bathol in Km 0 00 to 1 745 SH P L Gr I and C O unlined drain in Km 0 00 to 1 250 Under SCSP
Restoration of rain damage on link road to GSSS Dharampur km 0/0 to 0/850 SH P/F 80 mm paver block interlocking tile pavement from various RDs
including thermoplastic paint edge line Vshape drain at essential RDs under PMGSY
Improvement of road under Head NCAP with multiple tine to Clear air in 102 cities on Old NH-22 SH P/L interlocking tile pavement in berms and repair of side drain from at Rd 62/200 to 62/775
Providing and laying 30 mm thick bituminous concrete Wet mix macadam in km. 0/ to 1/0 , 1/0 to 2/0 and 2/0 to 2/550
Providing and laying 30 mm thick Bituminous Concrete with Paver Finisher on Km. 0/0 to 1/00
C/O ROFD, R/walls, B/walls, CD, C/O Cement treated sub base, Metaling tarring, Panel Cement concrete pavement, side drain and sign boards in Km 0/00 to 2/00
Providing and laying 30 mm thick Bituminous Concrete with Paver Finisher on Km. 1/00 to 2/00
Providing and Laying G-II, Primer Coat, Built up Spray Grout Single Layer, Tack Coat and 25mm thick Bitumenious concrete in Km 3/0 to 3/700).
9. Strengthening and widening of Karchham Sangla Chhitkul road Km. 0.00 to 18.00 Sub Head Improvement widening of road metalling and tarring BM. BC construction of V. shape drain providing and fixing road side furniture and edge line construction
RR Damages to Machoti to Darshal road km 00 to 1000 SH CO RWall at RD 0240 to 0250 widening of road at RD 0270 to 0390 and Providng Kharanja stone soling at RD 0200 to 0380 NDRF Funds
CA NO. CWE/KAS-05/2023-24 REPAIR/ MAINTENANCE OF INTERNAL ROAD INCLUDING ROAD FURNITURE AND ROAD PAINTAING AT SOLAN AND SUBATHU UNDER GE KASAULI
Construction of link road from Panog to Ajroli Km 0/0 to 3/00 ( SH- Formation Cutting 5/7 Mtrs wide road from Jeepable standard , Cross-Drainage and P/L Soling Grade-I in Km 0/0 to 3/00).(SW- Construction of Retaining wall at RD 1/060 to 1/078
RR damages to link road to Arla in Km 0/00 to 3/500(SH P/L WBM GradeII and Grade III in damaged portion between Km 0/00 to 3/500)DC Deposit
Periodic Renewal for the year 2025-26 on Gopipur Chamukha road, Rural Road VR0128 (SH Providing and laying 25mm thick bituminous concrete in Km. 7/0 to 8/0)
MT of link road to village Rano Kharyana to Ranopul Km 0 00 to 2 500 SH PL GSB Grading I and G II in Km 000 to 2500Under MNP
Job 1 Periodical maintenance on link road Jalgran Chattara km.0-00 to 2-00 Sub Head Patch work , 30 mm thick BC, zebra crossing and side lines VR056- Under State Head
Construction of link road from Harijan Basti Pab Km 0/0 to 2/0(SH- Formation cutting in earth work 5/7 mtr Wide road in Km 0/0 to 0/705)
Additional sanction under PMGSY incentive through Post DLP e-Marg for carrying out Periodic Renewal and Periodic Maintenance of Khallla Kyar to Bandal Surakh road km 0/000 to 14/480 Package NO HP-10-188 ( PMGSY)(SH Repair of Pot holes and 25mm thi
Formation cutting, C/o passing place, Side Drain, Parapets, Cross Drainage, Metaling and Tarring work and five-year maintenance under PMGSY-IV Package No HP-09-794
Providing MT works of road Link road from Ghartigad to Rampuri Km 0.0 to 1.00 SH MT works in Km 0.0 to 0.500
(SH- Providing and laying 25mm. thick Bituminous concrete in km. 3/0 to 5/0 including profile correction ). Under Annual Maintenance Plan for the year 2025-26. (PMGSY road).