Loading…
Loading…
10,873 results • Best match
Link road Ghuggar Nallah Har via Mansimbal (MC Deposit) (SW- P/L 25 MM thick Bituminous Concrete 1/000 to 1/647)
Construction of link road Charol to Plasla road SH Providing and laying cement concrete pavement at various damaged reaches Under SDRF/NDRF
C/o 31.16 meter vented Causeway over Takka Khad on link road from Shamshanghat to sainian Muhalla at RD 0/085 including approach both side )Under SCSP
Improvement of road from Cart road to Annadale KMs 0/00 to 4/160. (SH- C/O PCC R/Wall at RDs 2/951 to 2/955).
Improvement of road from Cart road to Annadale KMs 0/00 to 4/160. (SH- C/O PCC R/Wall at RDs 2/950 to 2/955.5).
Improvement of road from Cart road to Annadale KMs 0/00 to 4/160. (SH- C/O PCC R/Wall at RDs 2/963 to 2/969.5).
Improvement of road from Cart road to Annadale KMs 0/00 to 4/160. (SH- C/O PCC R/Wall at RDs 2/259 to 2/263).
Improvement of road from Cart road to Annadale KMs 0/00 to 4/160. (SH- C/O PCC R/Wall at RDs 1/080 to 1/094).
Improvement of road from Cart road to Annadale KMs 0/00 to 4/160. (SH- C/O PCC R/Wall at RDs 2/955 to 2/961).
) (SH- Repair of pot holes with bituminous macadam and providing 10Cm wide road marking and 30mm thick bituminous concrete in Km 1/0 to 2/0, 6/0 to 7/0 and 7/0 to 7/800)
Providing and laying Tack coat and Bituminous Concrete Km 1/500 to 3/230
Providing and laying Tack coat and Bituminous Concrete Km 0/0 to 1/500
Upgradation of Gangath Gheta road (T-01) from Km 0 to Km 8.700 under PMGSY 3 (Batch II)
M/T on link road to village Dachhain Km. 0/00 to 2/500 (SH P/L Kharanja Stone Soling Metalling and Tarring and C/o Katcha drain in Km. 0/00 to 1/200)
Periodical Maintenance i/c P/L 25 mm thick bituminous concrete and thermoplastic paint line between km. 0/00 to 8/100).
Providing and fixing PVC decorative wall paneling in Angling Hut building, providing protection restoration work to the building along with approach road and minor repair work at Angling Hut Lathiyani Distt Una HP
Annual periodical maintenance for the year 2021-2022 on approach road to Vishram Kuteer Manikaran and old Kasol Bazar SH Providing and laying bitumen concrete and construction of PCC drain 150 mtrs. length.
Construction of Junction to approach road to Indian Institute of Management (IIM) Dhaulakuan at RD 83/455 (RHS) (SH Construction of Junction and Rain Shelter at RD 83/455 (RHS) Under Deposit IIM
Approach road from joining highway to NCC GP HQ Office Building Dunloe Estate NCC GP HQ Shimla (SH Providing and Laying CC 1 5 10 CC 1 2 4 and Chequrered tiles etc)
Balance work for the C/o Driving Training Track and Traffic Park at Rora, Haroli Distt.Unan SH P/F Uni- stone Cladding on main building and approach road CC Pavement etc. D/work
M/R to DPRA at Longwood Shimla during 2023-24. SH: Repair of existing Mandi/Riwalsar stone paved approach road at Craigdhu Officers Accommodation including other related miscellaneous items at Longwood, Shimla (H.P.)
Construction widening of approach road to Divisional Commission Office, Election Commission and State Information Commission office building at Chotta Shimla at Rd 0.00 to Rd 0.097. SH Cutting soling bearing and tarring etc.
Custom Bid for Services - Up keeping of Bagdhar Khairi Road including Approach road leading to Power house of CPSI Similar Category Facility Management Service- Manpower based (Version 2) Manpower Outsourcing Services - Minimum wage
M/T on link road from Aghar to Bada Km 0/0 to 1/500 SH Providing and laying Premix Carpet with seal coat including correction layer Km. 0/00 to 1/300
C/O link road Darwa Gamberpul Via Daunta Baniyara road km 0/0 to 2/495 (SH P/L WBM G-I at Rds 0/0 to 2/00 Under SCCP
Providing and laying 25mm thick mix seal surfacing in Km 1/000 to 2/000
Restoration of rain damages on link road Badhaghat to Kassaru road km 0/00 to 1/600 SH C/O B/wall at Rd 0/318 to 0/338 and Construction of road side U-shape drain at Rd 0/340 to 0/425 and P/L Cement concrete pavement damaged reaches Rd 0/320 to 0/450
Restoration of rain damages on link road Daloh to Mundkhar road km 0/00 to 1/500 SH C/o B/wall at Rd 0/400 to 0/430,0/010 to 0/025,0/800 to 0/820 and construction road side U-shape drain at Rd 0/500 to 0/700 and construction of road side V-shape drai
Restoration of rain damages on link road Sidh Chano mandir Dadhol Kallan to Bhel km 0/00 to 1/200 SH Proposed Solid cause way at Rd 0/030 and Construction of road right side V-shape drain at Rd 0/720 to 1/110 and C/o R/wall at Rd 0/390 to 0/405, 0/8
Job 7 Periodical maintenance on link road to Jakhera Pukhru km.0/00 to 1/00 Sub Head Patch work , 30 mm thick BC , zebra crossing and side lines VR143 ii link road to Mohalla Jattan to Derian from Malahat km.0-00 to 1-400 Sub Head Patch work , 30
Job 8 Periodical Maintenance on link road from Sanoli to Melwan Tehsil Una Distt. Una km 0-0 to 1-0 VR145, Link road to Kanya Maha vidyala at Lalsingi Tehsil Una Distt. Una Km. 0-0 to 0-050 VR112 SubHead Patch work, 30mm thick BC, Zebra crossing an
Construction of Proposed FCA case Under HPPWD Division Shimla-1 Distt. Shimla-1. (i) Link road from Thalot to Jaghog Km 0/000 to 5/500), ii) Link road from Mundaghat to Gajheya via Kufer in Km. 0/00 to 7/00 and (iii) C/O road Jubber to Bhararia via
Job 4 Periodical maintenance on link road Una Ajnouli road to Kuthar Kalan km.1-00 to 2-150 Sub Head Patch work , 30 mm thick BC , zebra crossing and side lines VR039 and Link road Jakhera Bangarh road via Abadi Arohi road km.0-00 to 1-500 Sub H
C/o Earthan Shoulders on link road from Jagaat khaana Jhula bridge road to Dhang (0/00 to 2/00, C/o R/w on link road from Dhang uperli to Dhang nehli near Balmiki Basti (0/00 to 0/110), Providing and fixing railing and benches near gurdwara dhang
Periodical maintenance on link road Una Jaijon road to Tobba Gulabana Km 0/000 to 1/00 VR088 link road Haroli Gugga Mandir to Payjal Yojna km 0/00 to 0/810 0/870 to 1/480 VR147 SH P/L 25mm thick BC side lines cat eyes under State Head
Job 4 Periodical maintenance of link road from Polian to Janni road km. 0-0 to 1-0 Sub Head Patch work, 30mm thick bituminius concrete,zebra crossing in km. 0-0 to 1-0 VR158, Link road Saloh Nursary to Harijan Basti Saloh km.0-0 to 2-0 Sub
Annual Maintenance Plan for Village Road for the year 2024-25 on Link Road Jole to Peeru via Peerthan Pump House Km. 0/0 to 1/0 and Link Road Talai to Naina Ghattian Road Km. 0/0 to 1/200 (SH-P/L 25mm thick Mix Seal Surfacing on road).
AMP for the year 2021-2022 (VR) (i) on Link Road to village Kanguwali in Km. 0/0 to 1/950/00 (VR-0228) (ii)on Link road to PWD Rest House Sh.Naina devi Ji in Km. 0/0 to 350-(SH- Providing and laying 30mm thick bituminous concrete) (VR -0223)
Job 6 Periodical maintenance on link road from Rakkar to Basoli km.2-00 to 2-400 Sub Head Patch work , 30 mm thick BC , zebra crossing and side lines VR0140 ii link road Chattara Khanpur km.0-00 to 2-00 Sub Head Patch work , 30 mm thick BC , ze
Construction of 5/7m Approach Road from RD 0.00 m to RD 2955.00 m formation Cutting from existing PWD road Nakror to Datuin Temple to Power House Complex of ChanjuIII HEP 48MW in Tehsil Churah District Chamba H.P.
(SH-R.O.F.D., protection works, cross drainage works, GSB, G-II, G-III, DBM, BC, CC pavement and road furniture, ( Under PMGSY-III (Batch-I) (2022-23) Package No.HP-09-683)
Construction of link road from Solan Meenus road to Harijan Basti Panog Km 0/0 to 1/400 ( SH-Formation Cutting 5/7 Mtrs wide road from Jeep able standard , Cross-Drainage and P/L Soling Grade-I in Km 0/0 to 1/400)(SW- Construction of R/W
Strengthening of road from Manpura- dhela road to Macload pharma along with Retaining wall along the damaged road near pump house GP Manpura and protection work of slab culvert on the road, G.P. Manpura.
(SH- P/L Wearing WBM G-III and 30mm thick bituminous concrete in approach road both sides of box cell vented causeway at RD. 13/960) (Under Himachal road improvement scheme).
(SH- P/L Wearing WBM G-III and 30mm thick bituminous concrete in approach road both sides of box cell vented causeway at RD. 20/220) (Under Himachal road improvement scheme).
c/o link road from Balhi to Chuwari 0/00 to 2/00 (SH C/o R/wall at .D 1/325 to 1/353 and laying WBM G-II and G-III and M/T at R.D 1/300 to 1/500)
under Performance Based Maintenance Contract PBMC for the Rural Roads year 2020-21
Recarpeting of road from NH 105 to VMT, GP Sandholi RD 0/00 to 0/500., Widening of road from Kishanpura bus stand to near shiv mandir Kishanpura (RD 0/00 to 0/300) (Sh-25 mm thick BC,drain etc.)
Restoration to rain damages under Shimla division No. II (SH - Construction of vertical Box Nallah and widening of road by providing Square rubble Masonary wall near Apsara Hotel at RD 03/625 for on existing MDR-66 under sub-division.-VII).
C/O link road from Changadhar to Mahori SH Formation Cutting 5/7 mtr wide road in Km 0/000 to 0/525