Loading…
Loading…
10,874 results • Best match
Restoration of rain damages on approach road to residence of SP (SV-ACB) and EVM warehouse at Bhiuli, in Ward Bhiuli under MC Mandi. (SH Balance work of providing and laying soling and concrete)
Construction of approach road to Helipad f Dhalli Bye pass road km 0/00 to 0/300 (SH Earth work Retaining wall V Shape drain Metalling and Tarring and Crash barrier railing Balance work
Link road from Nalagarh Dabhota Road to Shivalik Solid Waste Management Plant.(SH - C/o drain, Retaining wall AND RCC Hume pipe culvert )
C.o link road to Panpo Kanda Km 0.00 to 6.00. SH-F.C 5.7 mtr wide road at RD 1.975 to 2.225. Under MMGSY
C/O Balance work of link road from Loran to Sarli Via Khalara Km. 2/510 to 6/660 Under NABARD-RIDF-XXVI.
R/R Damages on Link road to village Talangna Km. 0/00 to 8/00(SH Hiring of JCB and Removal of snow)
Construction of Link road to village Chanjhuin Km. 0/0 to 1/750 Formation cutting work in Km. 0/510 to 1/0)
Maintenance of public path and culvert near Nanak Chand house to Madan Thapa and Dheeraj Padha to link road in Ward No.15
Construction of link road Chamboh to Awah Devi via Hour Km. 0.0 to 4.0 SH C.O C.C. pavement at RD 1.500 to 1.600.
Const of link road Karluhi to Mandholi Km 000 to 5500 SH Const of Breast wall at RD 2165 to 2190 Under MNP
Construction of Link Road to Village Ghurmu Km 0.0 to 1.0 SH PL Cross Drainage works at RD 0.120,0.445,0.560 and 0.970 Under SCSP
Construction of link road Chhatrail to village Dadu Km 0.0 to 2.500 SH C. GSB grade II and tarring in 0.415 to 1.0 .
R.R damages on link road from Nigulsari to Tranda Km 0.00 to 5.550 SH- C.O R.wall at RD 4.342 to 4.359.90 8443 Deposit.
C/o Link Road Himmer Mandihal km 0/00 to 3/500 SH Providng and laying cement concrete pavement at various damage reaces.
Restoration of Rain Damages on Link road to village Mural Km 0.00 to 1.00 Sh Construction of Rwall at RD 0.720 to 0.745
Maintenance of public path and culvert near Nanak Chand house to Madan Thapa and Dheeraj Padha to link road in Ward No.15
Metalling/Tarring work on link road to village Tadgram Km. 0/0 to 1/200 ( SHM/T, Cross drainage, Retaining wall, PCC drain)
Construction of link road to village Tranda Km 0.0 to 7.0 SH CO balance work of traffic tunnel at RD 6.300 to 6.500
Missing CD on link road from Thachi Bung to Dandehli SH C/o 6.00 mtr span RCC slab culvert at RD 0/100
C/O link road Hiranagar Dagrani Tobba to main road Dulehar via Ravi Dass Mandir Dulehar Upperla Km 0/00 to 2/00
R/R Damage on link road Khanog to Jalath km 0/000 to 2/300 C/O Vented Causeway at Rd 2/050
Restoration of rain damages on link road to village Chiwa km 0.00 to 4.150 SH CO Retaining wall at Rd 0.360 to 0.378
C/o Link road to Bally in K.M. 0/00 to 2/240, ROFD between at R.D. 0/370 to 0/0/675
CO Link Road from Rauntha Galu to Jakhali Km 0.0 to 0.500 SH FC 5 7 mtr wide in Km 0.0 to 0.210
C.O 180 METER LON SPAN BRIDGE OVER SWAN RIVER ON LINK ROAD GOUNDPUR BANEHRA TO NAGAL JARIYLANA AT KM 1.782 IN DISTT UNA
Construction of Link road from Old Junga to Kohan via Boara Padreu and Gair (SH Formation from km 0/00 to 2/885
AR MO link road to village Sharontha km RD 000 to 0800 SHCO Vshape Drain in PCC 136 at RD 000 to 0750
C/o Link road from Chiber to S.C. Basti Chibber SH P/L interlocking paver block at rd 0/00 to 0/075
Construction of link road from Main road to Industrial Area via Hollymission School (SH - Providing and laying CC Pavement and Interlocking Tiles (MMGSY)
R.R damages on link road Karchham to Sapni Km 0.00 to 8.300. SH- C.O Random rubble masonry R.Wall at RD 7.635 to 7.680
Pro.M.T.Works on Link Road to village Kelvi Km 0.0 to 0.900 SH PL GSB WBM II and M.T.works at RD 0.0 to 0.900
Co Link road Desoti HB Kheda road km 000 to 4300 Sh C o HPC at Rd 0 630 0 820 and 2110
Construction of link road from Una Amb road towards Abadi Mohender Singh, Prem Chand and Abadi Batiyan GP lower Basal Distt. Una (HP).
Construction of link road from Millah to village Bindla 2/900 (SH- Removal of formation deficiency in Km 0/0 to 2/900)
Co Link road Chhalvar to Muhalla Purewal via IPH Righ SH PL Interlocking Paver Block flooring in Km 000 to 0500 Under OTMNP
RR Damage on link road Nesar to Munekdhar Km 000 to 1200 SH CO BWall at Rd 0500 to 0518 0520 to 0538
C/o link Road Grawag to Parsholi to Jouni Km 0/00 to 1/600 ROFD between Km 0/00 to 0/375
C.o link road from Powari to Kangarang Km 0.00 to 3.600. SH-F.C with wire crate at RD 1.120 to 1.405. Under TASP
C/o Link road from AIMIL factory Sainimajra to village Bir Plassi (S/H -C/o RCC slab culvert and channelization of nallah)
CO Link road vill Tandali to Dogra Khad km 00 to 2200 SH Co FC 57 mtr wide at RD 1825 to 2060
C/O link road Sohari to Paloh km 000 to 1500 SH PL GSB WMM and Tarring km 00 to 0500 under SCCP
Construction of link road from Abadi Loharan towards Ravi Kumar, Jivan Kumar and Matri Stone Crusher Gram Panchayat Lower Basal Distt. Una(HP).
Construction of link road to village Thathan Km 0/000 to 3/000 (SH F/C at RD 0/800 to 1/700.
C/o link road Jhanikar to Chhoun Km 0.0 to 1.700 SH C O C.C rigid pavement and R.wall at various RDs OTMNP
C.O link road to village Balh Bagh km. 0.0 to 1.0 SH C.O R.wall from RD 0.062 to 0.070 and 0.070 to 0.078.
Pro.M.T.Works on Link Road to village Oddi Km 0.0 to 0.500 SH PL GSB WBM II and M.T.works at RD 0.0 to 0.500
C/O link Road Gareog Chajoli to Krali Kalemu Km 0/00 to 0/510 ROFD between Km 0/450 to 0/510
Construction of Link road to village Ghutnu Km. 0/0 to 1/500 (SH Formation cutting at RD 0/870 to 1/500)
C/o link Road Bally Km 0/00 to 2/240 F/C 5/7 Mtr Wide Km 1/495 to 2/240
Construction of Link road Durand Nallah to Village Khaniyaru Km. 0/0 to 2/240 under BASP Formation cutting , Retaining walls, Breast walls