Loading…
Loading…
10,874 results • Best match
Construction of link road from Dera Baba Rudra Nand towards Nari GP Upper Basal Distt. Una (HP) (KM 0/00 to 0/550)
C o Link road Nesar to Munake dhar SH F C 5 7 mtr wide road at RD 0 405 to 0 690
Construction of link road from Una Amb road towards Jaspal Bhatha GP lower Basal Distt. Una (HP) (KM 0/00 to 0/550)
C.O link road Rakkar Basoli road km.0.0 to 2.400 (SH P.L interlocking paver blocks at RD.0.0 to 0.086 (Under OFC Deposit)
C.O. link road Rakkar Basoli road km.0.0 to 2.400 (SH P.L interlocking paver blocks at RD.1.750 to 1.835 (DC Deposit work)
Restoration of rain damages on link road village Pipli Km. 0/00 to 4/510 (SH Hiring of JCB for removal of slips)
Restoratin of rain damages on Link road to village Kathasu km 0.00 to 5.00 Sh Construction of Rwall at Rd 2.780 to 2.800
Construction of link road from Abadi Loharan towards Ravi Kumar, Jivan Kumar and Matri Stone Crusher Gram Panchayat Lower Basal Distt. Una(HP).
Co Link road harwani to Rajgarh km 000 to 300SHCo Rwall at RD 000 to 00180160 to 0180 and HPC at RD 0500
R.R damages on link road from Chaura to Majhgaon road Km 0.00 to 27.050 SH- C.O B. Wall at RD 17.885 to 17.900
R/o Repair of Path ward no. 06 from link road to house of Prem Chaudhary Nagar Panchayat Daulatpur Chowk Distt Una HP
Pro.M.T.Works on Link Road Bhorar to Chieng Km 0.0 to 1.0 SH PL GSB WBM II and M.T.works at RD 0.0 to 1.0
Restoration of rain damage Link Road Thana via Turan Road Km 0.0 to 5.060 SH CO Retaining wall at RD 0.860 to 0.873
Periodical Renewal coat 30mm thick bituminous concrete with paver on Link Road Loharli upper to GMS Khad Gujran Km 000 to 3600 HP1204VR0115
RR Damages to link road village Jiskoon km 000 to 8000 SH Dressing of road surface ic shoulder and dipression of surface etc
Improvement of link Road to Chhajoli Km 0/00 to 0/810 C/o B/wall at RD 0/370 to 0/400
C/O Link road to Mohalla Nanaksar G.P Haroli SH P/L CC Pavement at RD.0/280 to 0/523- under MMSY
A R and M O link road to Jalgran Chattara road (HP1205VR056) (SH P L Patch work at various RD s) (Under MMSRRY)
Engagement of Consultant for preparation case of construction of link road from Bijali to Tarala via Darad Km. 0/0 to 15/750
C/O Link road to Village Dabling Km. 0/00 to 4/900 (SH-Formation cutting from Km. 3/155 to 4/450
C/O link road Sawaru to Gharwahan Km 0/00 to 3/500 (SH- FC between Km 0/628 to 0/870 ) VKVNY
C O Link road Kashaini km 0 00 to 0 500 SH C O B Wall at Rd 0 0 to 0 015
CO link road to village Shaunther km 00 1825 SH FC 57 mtr wide raod km 0705 1825 27202990 to 3018 Under PDNA
RR Damage to link road Sangard to Hingori km 000 to 1500 SH Co R wall at Rd 0 860 to 0 890
Construction of Paver block Road from the house of Sh. RajanPuri to DAV School Link Road in ward No. 14under MC Una HP
Balance work of Interlocking concrete Block Pavement on link road Shaheed Sourabh Kalia road (SW- Providing and laying Interlocking Tile work (MC Deposit)
Providing and laying cement concrete pavement and construction of road side U-shape drain at km 0/054 to0/170) Under OTMNP
Construction of road leading to PWD road Ghatru to Sharma Niwas at Shiv Nagar Panthaghati (SH Construction of road RD 0 0 to 0 025) Phase I
Repair of road covering of Nallah and Retaining wall from Shere Hind Academy towards Vishwas School ward no.11
(SH- P/L 25mm thick Bituminous Concrete with Paver finisher in km. 2/00 to 3/00)(PMGSY Road)
Providing and laying 25mm thick mix seal surfacing in Km 0/000 to 1/000
Improvement of Road, Passing Places, R/Walls, Missing CD work, GSB, WBM-II, WBM-III, Tarring work, BM, CC Pavement, Side Drain and Parapets including 5 year routine maintenance after completion the work.) (Under NABARD RIDF XXVII).
A/S on link road to Jarol 0/0 to 1/0 A/S on Tannujubbar Banshera 00 to0/700 A/S on approach to Circuit House Narkanda 0/0 to 0/700 A/S on link to Virgarh 0/0 to 0/865 and A/S on Link road to Hattu Temple 6/0 to 6/245
(i) Improvement of Ghasigaon Dhandroti link road km 0/0 to 3/930 C/O R/wall at RD 0/470 to 0/510 and ROFD from km 0/460 to 0/525 (ii) Improvement of Ghasigaon link road km 0/0 to 1/500 ROFD from km 1/255 to 1/320
Annual Maintenance Plan on Dangar to Jahu via Lohat Bharari Bara da Ghat Jahu road km 0/00 to 20/00 MDR -122 ,link road Karot Dibla Ropari road km 0/00 to 6/00 village road , link road Dhinwan to Chinjyara road km 0/00 to 2/00 village road and
Routine maintenance of Baddri Nagar Jamniwala Parduni road km. 0/0 to 14/500, Paonta Rampurghat road km. 0/0 to 5/0, Link road from NH-07 Bhuppur to Tibetian Colony km. 0/0 to 1/0 and link road from Pipliwala Kiratpur Fatehpur km. 0/0 to 2/150. Under
Annual maintenance Plan on Samlohal Chadol via Pickel Factory km 0/00 to 2/600 and link road to village Seo km 0/00 2/600 and link road to village Seo km 0/00 to 0/500 village road for the year 2026-27 SH Providing and laying 30mm thick Bitumnious
C/O link road from Khaltu Dhar Chebri to Tandali km 0/00 to 2/00 SH C/O R/Wall at RD 0/035 to 0/050 and 0/460 to 0/480
Improvement of black spot on Link road to Village Radiyana Km 0 00 to 2 400 SH PL GSB Grading_I GII GIII and 30mm thick BC in extended portion in Km 000 to 100
C/O link road Galot Banali Riya Kaploi Siyarli Tehsil Nalagarh km 0/0 to 3/500 (SH F.C 0/0 to 0/500 C.D work at RD 0/100 0/440
C/O link road Jadla to Chyali in km 0/0 to 2/600 SH Formation deficiency Retaining structure C D work road side drain parapets and dumping in km 0/0 to 2/600 under Nabard RIDF XXV
C o Link road Pekha to Pekha School km 0 00 to 0 510 SH F C 5 7 mtr wide road at RD 0 00 to 0 510 and HPC 900mm dia at RD 0 250 0/385
Construction of road Connecting North and South Campuses of IIT Mandi
Construction of Road and Puli Saro Devi house Ward No.2
Construction of Road at dumping site at Kedarpur, Paonta Sahib , HP
Construction of road path towards colony at Anu under ED Hamirpur
Construction of link road from village Bharli to village Rudana Thada Zizla Km 0/0 to 4/00 ( SH- Construction of 5/7 Mtr wide formation cutting , C.D. works and P/L Soling in Km 0/0 to 4/0)( SW- construction of 900mm. Dia RCC Hume Pipe Culvert at
Balduhak via Banal km 0/0 to 2/0 (VR-122). (ii) AMP on link road to village Chamral km 0/0 to 5/0 (VR-099). (iii) AMP on Gandiana to Badehtar road km 0/0 to 1/0 (VR-022). (iv) AMP on link road to Dodlu to Gariali km 0/0 to 1/0 (VR-098)
SH Initial Rectification Periodical Renewal from Km 000 to 27270 and Five year Routine Maintenance after Periodical Renewal PMGSY Financial Incentive Package No HP12114
A/R and M/o link road to village Shashur Gompa. (SH-Patch work at various Rds in Km.2/00 to 3/00