Loading…
Loading…
10,870 results • Best match
Job 6 Periodical maintenance on Link road to village Galua 0-0 to 1-860 HP1205VR062, Una Resdential Colony road Km. 0-0 to 0-680 HP1205VR0113 and Link road Peernigah road to Phalkhari Mohalla to Shamshanghat 0-0 to 1-100 HP1205VR0131 Sub Head P.L
SDF202540 RO Repair of Restoration of Rain Damages on Link road Andora to Banne di Hatti via Shivpur in GP Andora Km 000 to 4000 and Link road Karluhi to Athmah Haijan Basti in GP Karluhi Km 000 to 2000 SH Repair of Pot Holes Due Crus
C.O LINK ROAD FROM MALKOA TALI RATTAN BEHAR VIA DHIMAN BASTI CAHLALI UP TO LINK ROAD BHARWAIN BEEHAN KM 0.0 TO 1.050 SUB HEAD C.O R.WALL AT VARIOUS AT RD 0.50 TO 0.070 .0.835 TO 0.860 P.L CEMENT CONCRETE PAVEMENT AT RD 0.0 TO 0.050.0.070- TO 0.110
Periodical renewal coat with 30mm Bituminous concrete with paver on link road Pay jal Yojna Tube Well to Mohalla Kabir Panthian Chamkhruru km 000 to 0400 and km 0590 to 1050 T02 to Kuthera Rampur km 000 to 1000 link road NMT to Toriwala Mohalla GP B
Job 9 Periodical maintenance on Gagret Oil Ispur road to Bhaira Border Km. 6-250 to 7-040 HP1203VR145 , link road Mohalla Brahmanan to Lower Panjawar Km. 0-0 to 0-120 HP1203VR151 and link road Village Khad Mohalla Sonklyan Km. 0-0 to 0-740 HP1203VR1
Job 3 Construction of link road connecting Gurudwaras i.e. Girgira Sahib, Roti ram ka Dera, Rangi Ram Ka Dera and Tahli Sahib Under Haroli Constituency Distt. Una km. 0-0 to 9-700 Sub Head C.O link road Roti Ram Ka Dera to Girgira Sahib for Formatio
RR damages on Link road Dho to Dho Km 0 00 to 2 00 R R damages on Gharan to Dari road Km 0 00 to 1800 RR Damages on Link road Ghumarli km 0 00 to 0 600 SH Repair of pot hole at various RDs
(i) Construction of link road Panjawar Bathri road to Shivalik ITI Badhera via Brick Kiln from Km 0/0 to 4/270, (ii) Construction of link road Tahliwal Bathri road to IPH Pump house via Kalua Mohalla Bathri, Electric Sub Station Bathu from Km 0/0 to
Periodical maintenance on link road Panjawar Bathri to Roti Ram Ka Dera road Km 0/000 to 2/000 VR070 Link road Thakran to Girgira Sahib road Km 0/00 to 2/00 VR079 SH P/L 25mm thick BC side lines cat eyes under State Head
Restoration of rain damages on various roads under Udaipur Sub Division (Udaipur Section) (SH Hiring of J.C.B/Excavator cum loader for removal of Snow/Landslide on link road Salpat I an II Km. 0/00 to 2/665 (SDF/2024/189) and link road Salpat to Rato
Const of link road Chowar to Jawar km 000 to 10075 and Const of link road Nandpur Mairi road km 000 to 24195 Providing and Eracting metal Crash Barrier at RD 9600 to 9635 and RD 17780 to 17830 Against Improvement of Black Spot Road safety
SH Providing and laying 25mm thick Bituminous concrete
SH Providing and laying 25mm thick Bituminous concrete
Providing Periodical maintenance on Link road to Village Kanda km 0.0 to 4.0 SH Rectification of Pot holes , P L Prime Coat, Periodical maintenance at RD. 0.0 to 4.0 under AMP-I
C/o link road to village Bhaber km0/0 to 0/300(SH Formation cutting in km0/0 to 0/120 P/ wire crate R/wall at RD0/0 to 0/120
A/R M/O link road to Village Aneach km 0/0 to 1/500 SHP/L 80mm thick paver Block in km 1/00 to 1/195
C O link road to village Mundru in KM 0/00 to 2/522 SH P L G II G III bituminious concrete in KM 0/00 to 1/00
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 1/000 to 2/000)
Providing and laying 30mm thick bituminous concrete, hot applied thermoplastic reflective paint strip in K.M. 0/0 to 1/0 and 1/0 to 1/450
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 2/000 to 3/000)
P/L 25mm thick bituminous concrete in kms 6/0 to 7/0, 3/0 to 3/900 and G-III with 20mm thick premix carpet in patches and V-shape drain in kms 6/700 to 6/800, 3/0 to 3/100.
C/O ROFD, R/walls, B/walls, CD, C/O Cement treated sub base/base, Metaling tarring, Panel Cement concrete pavement, side drain and sign boards in Km 0/00 to 3/100
P/L 25mm thick bituminous concrete in kms 2/0 to 3/0 and G-III with 20mm thick premix carpet in patches and const.of drain at RD 2/550 to 2/600 and 2/100 to 2/150 and Interlocking paver block at RD 2/750 to 2/800).
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 0/000 to 1/000
Periodical Maintenance i/c P/L 25 mm thick bituminous concrete and thermoplastic paint lines between km. 0/00 to 1/750).
Periodical Maintenance i/c P/L 25 mm thick bituminous concrete and thermoplastic paint lines between km. 0/00 to 1/645).
Periodical Maintenance i/c P/L 25 mm thick bituminous concrete and thermoplastic paint lines between km. 0/00 to 1/087).
Construction of Sultanpur to Bari road Km. 0/0 to 2/350 Under PMGSY, ( Batch-II,2018-19)
PERIODIC RENEWAL BAGLI TO MANDWARA ROAD SUB EHAD PROVIDING AND LAYING 30MM THCIK BITUMINOUS CONCRETE UNDER PMGSY INCENTIVE
Periodic maintenance of Koil to Gharoli road (HP-06-37) Km 0/000 to 18/360 under PMGSY
Annual Maintenance on approach road/yard/yard of Circuit House Km. 0/0 to 0/480 for the year 2025-26 ( Sub Head - Providing and Laying 25 mm thick Bitumenous Concrete)
Annual repair and maintenance to Armsdale Building at HP. Sectt. Chotta Shimla-2(SH-Providing and laying cement conctete infront of retaining wall and near approach road to Phase-III etc.)
CONSTRUCTION OF HELIPAD SIZE 35X25M AT 217 TC PALCHAN ALONGWITH 300 MTR CL 9 APPROACH ROAD AT ARMY TRANSIT CAMP PALCHAN UNDER 70 RCC 38 BRTF OF PROJECT DEEPAK IN HP
Construction of culvert at RD. 0.045 Approach road to Veterinary Dispensary in Chhattar Jhikla Under MLALAD Deposit work SH Construction of 3.00 mtr. Span RCC Slab culvert at RD. 0/045.
Repair of approach road form Kali Mata Mandir to Khara Danda road in Tehsil Dharamshala, Distt. Kangra H.P. SH- Construction of P.C.C. Retaining wall at RD 0/285 to 0/300
Upgradation and Beautification of Mata Shri Chintpurni Ji Temple Complex and its Approach Road including surveying, planning, detailed design, Preparation of Detailed Project Report (DPR), Engineering, Procurement and Construction (EPC) Works.
C/O main gate steel shed for Statue in approach road to RKMV at Longwood Shimla. (SH- P/L CC work, steel work, roofing work, painting work, interlocking pavers work etc.).
Improvement of approach road leading to SWM site at village Rampur MC Una km.0.0 to 1.700 (SH Construction of Sub grade and gravel soil aggregate at RD 0.300 to 1.700)
M/R to DPRA Bemloe, Park Area & Chotta Shimla during 2023-24. SH: Repair and strengthening of existing approach road by provision of retaining walls at Allen Bank Defence Pool Bunglow.
Providing and laying 30 mm thick Bitumen concrete laying with paver finisher)(Approved financial Incentive 2021-22 PMGSY road)
ROFD, Protection works, Cross Drainage works, Metalling and tarring, Road side drain, Crash barriers, Road Furniture Dumping Structure in km 0/000 to 4/540 includinng five years routine maintenance under PMGSY-IV Batch I
C/o link road from Jingal Mod to Ghanufri via Kotla Katachi road Km. 0/00 to 1/300 (SH Providing and laying granular sub base in Km. 0/954 to 1/270)
Provision Of Internal Road From Recreation Room To Pers Line Area (Approx 60 Mtr) Of 2136 Fd Hosp At Karcham Under GE 863 EWS
(SH P/L Bituminous concrete 25mm thick at km. 8/500 to 9/460).(HP0302VR0085). (ii) C/O link road Kakkar Chhamb. (SH P/L Bituminous concrete 25mm thick at km. 3/00 to 4/00 and 4/00 to 4/100).(HP0302VR0080) (iii) C/O link road Jeehar to Chakriana Di
( SH - Providing and laying 25 mm thick mix seal surfacing laying with paver finisher between Km 2/000 to 3/000, 3/000 to 4/000 and 4/000 to 4/500 ).
( SH - Providing and laying 25 mm thick mix seal surfacing laying with paver finisher between Km 0/000 to 1/000, 1/000 to 2/000 and 2/000 to 2/500 ).
(SH Providing and Laying 30 mm thick Bituminous Concrete PCC drain and Hot Thermoplast line in km. 1/0 to 5/0) 4.00 km)
Repair of Road path from Petrol pump to Tilak raj House Vijay nagar in ward No 28