Loading…
Loading…
10,870 results • Best match
Restoration of rain damages on various roads under Udaipur Sub Division (Miyar Section) (SH Hiring of J.C.B/Excavator cum loader for removal of Snow/Landslide on link road to village Shailing to Balgot Km. 0/00 to /2/570) (SDF/2024/163) and link road
SDF202537 RO Repair of Restoration of Rain Damages on Link road Banehra to Billu di Talai in GP Gondpur Banehra upper Km 000 to 1600 and Link road Gondpur Banehra to Fathepur in GP Gondpur Banehra Upper Km 000 to 3100 SH Repair of
Restoration of rain damages on various roads under Udaipur Sub Division (Thirot Section) (SH Hiring of J.C.B/Excavator cum loader for removal of Snow/Landslide on link road to village Jasrath Km. 0/00 to 3/00 (SDF/2024/172) and link road from Barring
SDF202536 RO Repair of Restoration of Rain Damages on Link road to Shaheed Major Gurdev Singh Deoli in GP Deoll km 00 to 2050 and Link road to village Ghanari to Nangal Jarialan GP Nangal Jarialan Km 00 to 4900 SH Repair of Pot Hol
Restoration of rain damages on various roads under Koksar Sub Division (Gondhla Section) (SH Hiring of J.C.B/Excavator cum loader for removal of Snow/Landslide on link road to village Teeling Km. 0/00 to 3/00 (SDF/2024/180), link road to village Rall
M.T on link road Saily to Handola via Kamoon Pattian and construction of link road Saily to Mahadev Mandir via GPS Laubowal from Km 0.000 to Km 14.640 under NABARD RIDF XXVII SH. Formation cutting, C/o Retaining Wall, wire crate, CD Work, CC Pavemen
Restoration of rain damages on various roads under Koksar Sub Division (Sissu Section) (SH Hiring of J.C.B/Excavator cum loader for removal of Snow/Landslide on link road to village Jamyaling Km. 0/00 to 2/600 (SDF/2024/176), link road Lalling to Thi
Co Link road Rakkar Shantla from House of Pradhan Sansar Chand via Koud Basti to connect with Sitpak Nihari link road ic Bridge Km 00 to 30 SH PL GSB, GII GIII and Premix carpet with seal coat in Km. 0500 to 0750 under OTMNP
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 0/000 to 1/500) and C/O U-shape drain at RD 0/00 to 0/100
Providing and laying bituminous concrete 25mm thick tack coat, thermoplastic strip and repair of pot holes in km 2/00 to 3/00 and 5/00 to 6/00
Providing andLaying 30 mm thick Bitumen Concrete with Paver finisher in Km 1/000 to 2/000)
Construction of link road to Harijan Basti Pab km. 0/0 to 2/600(SH-Formation cutting 5/7 mtrs wide road in km 2/0 to 2/600)Under MMSY
Improvement of road width Government Primary School Dobhighat (SH Retaining wall and drain R D 0 200 to 0 290) in ward no 4
Periodical Renewal coat 30mm thick bituminous concrete with paver on Link Road Chintpurni to Amlehar via Dhalwari km 1000 to 2810 HP1202VR0131
Periodical renewal on Link road from Nagani Ban Kuther road km 0/00 to 8/00 for the year 2024-25 SH Providing and laying 25mm thick Mix seal Surfacing at KM 0/00 to 0/800.)
SH Providing and laying 25mm thick Bituminous concrete
C/o link road Kothi village Bhadrwan Ghandalwin km. 0/00 to 1/500(SH- P/L C.C at R.D 1/00 to 1/500) (UNDER MMGSY)
Providing and laying 30mm thick Bitumenous concrete in km. 4/0 to 5/0 and construction of Side drain in 100 Metre length
Improvement of road under Head NCAP on PKDSS road SH P/L interlocking tile pavement in berms and C/O U Shape drain on Hill side at Rd 0/165 to 0/315
Improvement of Black Spot on Barthanighatti to Thaya Bajwa road Km 0/000 to 1/765 SH Widening of road at narrow stretches at RDs 0/000 to 0/405 and 1/570 to 1/615
Construction of link road from Nanidhar to Shankholi km 0/0 to 2/600(SH-Breast wall at RD 0/840 to 0/865, 1/265 to 1/285 and 1/400 to 1/420
Construction of remaining work of Shiv Dham Phase-I at Kangnidhar Mandi Distt. Mandi H.P. Sub Head Structural Construction of replica of 12 Jyotirlings site development and approach road.
Construction of link road Harizan Basti to Ward No.3 Patta in Tehsil Ghumarwin Distt. bilaspur (H.P) C/o 4.00 mtrs span Culvert
Provision of Interlocking Paver Block and Drain etc. at Sub Market Yard at Dhanotu Distt. Mandi H.P. SH C/o approach road to yard RD 0/0 to 0/935.
Providing and laying of Sewerage line for UG Hostel and development work for the approach road between UG hostel and B-8 hostel block at South campus of IIT Mandi
Annual surfacing on Pungh Ghagnoo road PMGSY SH Providing and laying 30mm thick bituminous concrete including profile correction layer V shape drain and road marking in Km 10.0 to 12.0 and Annual surfacing on Bangalu Luhnu road PMGSY SH Providing and
Construction of link road to village Sathore Km 0/0 to 2/0 (SH- Providing and laying Sub-Base G-I in Km 0/0 to 2/00)
( SH - Providing and laying 25 mm thick mix seal surfacing laying with paver finisher, road marking strips of hot applied thermoplastic compound (Painting line) between Km 6/000 to 7/000 and 7/000 to 9/500 ).
( SH - Providing and laying 25 mm thick mix seal surfacing laying with paver finisher and C/o unlined drain between Km 0/000 to 0/500 ).
Providing AND Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 0/000 to 1/000
SH Providing and laying 25mm thick Bituminous Concrete including repair of road
SH Providing and laying 25mm thick Bituminous Concrete including repair of road.
Repair of road from Bhud Lehi Road to DM Pharma near Panchayat ghar Bhud G.P. Malpur.
Repair of road of Sainj Township, Parbati HE Project, Stage-II, Sainj (Package No. C-647A).
Repair of road between RD 465.00m to RD 1472.00m from NH-505 to Power House road
and C/o Pully in link road to village Marora Near House of Sh. Gurnam Gram Panchayat Nalka (Under Hear BASP (DC) Deposit)
PROVN OF SECURITY WALL, WATCH TOWER AND ROAD WORKS UNDER AGE(I) DHARAMSALA
(ii)Link road from Gojjar to Paharuwala km.0/0 to 1/0(SH-Providing and laying 50mm.Thick penetration macadam in essential reaches and 30mm.Thick bituminous concrete in km.0/0 to 1/0) under Annual Maintenance Plan 2022-23. Under PMGSY.
CWE/KAS-43/2024-25 REPAIR/ MAINTENANCE OF INTERNAL ROAD INCLUDING ROAD FURNITURE AND ROAD PAINTING AT SOLAN MIL STATION UNDER GE KASAULI
Providing and Laying premix carpet on internal road of township complex at Nagwain of Parbati-H.E. Project (Stage-II) (Package No-C-811)
Providing and laying 30mm thick Bituminous concrete, including profile correction in Km 6/0 to 7/0, 14/0 to 15/0 and 21/0 to 22/0
Providing and laying Tack Coat, Bituminous Concrete 30mm thick, Repair of Pot Holes
Construction of link road to village Lower Manoh SH P.L Bitumen Concrete 30 mm thick in Km. 0.0 to 0.600.
M/T on Link road from Nehraghati to Bari Loshta Dhali Dhakal Road in K.M. 0/00 to 3/800
C/O link road to Bally Km 0/00 to 2/240 ROFD between Rd 0/675 to 0/885
Construction of link road to village Rundega Km. 0/0 to 1/600 SH const of R/wall at RDs
C/o link road Nehwat Nayaser, Ghaini Devidhar road km. 0/00 to 13/691 (Including Bridge 24 meter span)
Connstruction of link road to village Jareen Km. 0/0 to 2/370 (SH Metalling/Tarring, PCC drain and parapets)
C/o Link road Samshanghat Ropri to village Ropri SH Providing and laying cement concrete pavement at various damage reaches
Co Link road village Khangta km 000 to 0500SH Co Rwall in wire crate at RD 0170 to 0182 5