Loading…
Loading…
10,877 results • Best match
and construction of path from Sh. BD Awasthi house to main road Sidhpur Tehsil Dharamshala Distt Kangra
Repair of road at km 0/00 to 7/00, (C/O R/wall at Rd.6/525 to 6/545) (DC Deposit)
R/R damages to link road to village Riwin in Km. 0/00 to 1/840. (SH P/l WBM G-III and 20mm thick open graded premix carpet with seal coat in Km. 0/00 to 1/840). Under PDNA.
C/O link road from Petrol Pump to Kakarhatti in Km. 0/00 to 1/800.(SH C/O R/Wall, BWall, Edge wall, Interlocking tiles Pavement, Unlined drain, Parapets and Road Signs, Boards etc. at various Rds etc)Under SCDP
C/O link road to village Mundru in Km. 0/00 to 2/425.(SH P/L WBM G II as correction layer, P/L WBM G III, 20mm thick premix carpet and C/O V-Shape drain in Km. 0/00 to 1/200) Under SCDP
(SH- Widening of road at RD 2/0 to 2/735)
(SH-Widening of road at RD 3/075 to 4/0)
(SH- widening of road at RD 59/735 to 60/060)
Widening of road at various Rd between km 0.0 to 1.0
(SH-widening of road at Rd 1/105 to 1/450)
Construction of passing places, Missing CD, side drains, Parapets, Crash barrier, CC pavement and tarring work including five year maintenance after completion Under PMGSY (Batch-II for 2018-2019) Package No. HP-02-345
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 6/000 to 7/000)
P/L Built up spray grout single layer tack coat and 30mm thick Bitumenious concrete in Km 1/0 to 2/0.
P/L 30mm thick bituminous concrete in kms 0/0 to 1/0 including 80mm thick ISI marked paver block and thermoplastic strips
P/L Built up spray grout single layer tack coat and 30mm thick Bitumenious concrete in Km 3/0 to 4/0
P/L Built up spray grout single layer tack coat and 30mm thick Bitumenious concrete in Km 0/0 to 0/900
Providing and laying 30 mm thick Bituminus concrete laying with paver finisher between Km 3/0 to 4/0 (AMP)
C/o link road from Ghumarwn Ser had bridge to Nalwari Melda ground Ghumarwin km.0/0 to 0/400 SH C/o 4.0 mtrs R.C.C Slab Culvert at R.D 0/170
AMP for the year 2025-26 for Koku Nallah Dharonk Road Km 0/00 to 8/500 and Purag link Road Km 0/00 to 2/300 P/L Pot Hole and BC 25mm thick Portion Kokunallah Dharonk Road at RD 0/00 to 2/00 and Purag link road at Rd 0/00 to 2/300
Routine Maintenance of Baijnath Lad-Bharol Kandhapattan road Km. 12/0 to 22/0 (Total Kms. 10.00) (MDR-43) under Performance Based Maintenance contract (PBMC) for Rural road for the year 2020-21
Periodic Renewal for the year 2025-26 on Chaplah to Sarad Dogri via Ladoa road Rural Road-VR0262 (SH Providing and laying 25mm thick bituminous concrete in Km. 1/180 to 3/0)
Improvement of Gawas to Shela Pani road km 00 to 200 SH Widening of road at various RD 00 to 0345 0600 to 0645 0725 to 0915 and CO BWall at 0020 to 0050 BWall at 0140 to 0180 BWall at 0200 to 0230
Construction of Parking along Road Side at various location in sangti under AMRUT Part 2 (i) Development of Car Parking along Road Side and widening of road Near Baba Balak Nath Temple Sangti in ward No 24 (ii) Development of path at various locatio
Repair of Road and path from NH to house of Sh Gopal Sub head Excavation R.R masonary in ward no.3
Maintenance and repair of Road/path by providing cement concrete tiles, interlocking pavers, retaining walls, Parapets walls, railing and fencing etc.
Construction of link road to village Sargoon Heera to Bar-Badar Karot road km. 0/0 to 0/650.(SH C/O RCC slab culvert span 5.00mtr. At RD. 0/375). (Under OTMNP Head).
C/O link road from Jhamrara Kanjiyara Butayala to Joharji road in Km. 0/00 to 6/00.(SH Balance work for the C/O 3.00 mtr span slab culvert at Rd 1/600)Under SCDP
Construction of Breast wall for protection of Surge Shaft approach road at RD - 3710 to 3720mtr, RD-3725 to 3735 mtr and RD-3735 to 3740 mtr at Chamera-III Power station, Dharwala (Pkg. No. CIII-967)
Repair of patch work on approach road from B.S.L. colony to Sundernagar jaidevi, Rohangaloo km.. 0/00 to 0/900 (SH Repair of patch work at various reaches between km. 0/00 to 0/900) Under MMSRRY
Construction of Main Gate and approach road to College Campus at RKMV, Shimla. (SH - Dismantling work, CC. 1 2 4, CC 1 3 6 and CC. 1 1 5 3, steel work in gate and railing etc.).
Special repair of approach road leading to Bharyal Plant from Tara Devi to Totu Bye pass in ward No 7 Majiyat (SH Providing and Laying CC 1 2 4 and Construction of V Shape drain) Balance work
Job 8 Repair and Restoration of Tahliwal Bathri road km. 0-0 to 7-700 Sub Head P.L CC Pavement for R.O approach road to ward No 4 upto the house of Sh. Dharam Singh GP. Bathri
Construction of Dwelling Units on Location No 5 Krishna Nagar under RAY at Shimla SH CO Civil Work of 16 Dwelling Units Sanitary Work Fitting and CC M30 for approach road in ward No 13 Krishna Nagar
CO Eklavya Model Residential School Pangi at Killar Dharwas, Tehsil Pangi District Chamba HP Phase-1A SH School building half block G plus1 floor, Hostel Block including minimum Site development and approach road Civil and Electrical Work
C/o Link Road kahru to Panchyat Ghar Tippri Km 0/0 to 3/00 SH. C/O C.CPavement at Rd 0/0 to 0/259
SH MT at RD 0-0 to 0-500 Under OTMNP C-O Link road to Harizan Basti Village Bohan from AWahdevi bye pass km. 0-0 to 2-500 SH PL GSB WMM MT in km 0-0 to 1-0 Under OTMNP
Improvement of Black spot on link road to Village Nahri in Km. 0/00 to 2/250.(SH Providing and Erecting W metal Beam Crash barrier at Rds. 0/784 to 0/831 and 0/907 to 0/930)
C/o link road Barota to Thana km. 0/00 to 2/00 (SH C/o R/wall at R.D 0/875 to 0/885, 0/975 to 0/987 and 0/941 to 0/951 and P/L stone soling and CC at R.D 0/925 to 1/230)(UNDER OTMNP)
Formation Cutting, Passing Places, R/wall, B/wall CD, Side Drains, Parapets and Tarring work) under PMGSY (Batch-II, 2018-19
R/R damages to link road to Village Rano from Solan Subathu road Km. 0/00 to 0/650.(SH P/L 30mm thick Bituminous concrete in Km. 0/00 to 0/650)Under PDNA
Repair of road at km 0/00 to 3/745, (C/O R/wall at Rd.1/075 to 1/088) (DC Deposit)
Repair of road at km 0/00 to 1/700, (C/O R/wall at Rd.1/400 to 1/406) (DC Deposit)
C O C D on Link road to Village Bathol in Km 0 00 to 1 745 SH C O Hume pipe culvert along with wing wall at Rd 0 465 0 540 0 650 0 900 and 0 990 Under SCSP
R/R damages on Link road to village Banjani in km 0/00 to 1/225 (SH C/o HPC at RDs 1/180 , C/o R/wall at RDs 0/365to 0/380 and 1/120 to 1/225) Under PDNA
C/O link road from Joharji to Mallah road in Km 0/00 to 27/465(SH C/O 900mm dia RCC HPC including both side wing wall at Rd 17/640,17/980, 21/970 and 22/835) Under MNP 2nd Call
CTB for Upgradaton of Kopra to Hasol Road from km-0/000 to km 8/200 (T-04) Under PMGSY-3 (Batch-II)
Construction of Luddu to Gharmani road Km. 7/0 to 9/500 under PMGSY (Batch-II,2018-19) Package No. HP-02-337
Upgradation of Mashnoo to Bahlidhar road Km 0.000 to 18.000HP09722 and Upgradation of Barkal to Taklech road Km 0.000 to 11.000HP09727 PMGSY III
Construction of Luddu to Gharmani road Km. 7/0 to 9/500 under PMGSY (Batch-II,2018-19) Package No. HP-02-337
periodical renewal Bounkhri Mour to Dhunera Nagali road Km 6/0 to 8/0 under PMGSY financial incentive for the year 2023-24