Loading…
Loading…
10,877 results • Best match
R R damages to link road to Bhamnoli km 0 0 to 1 500 SH C O R Wall at Rd 1 020 to 1 035
C/o link road Rajpur to Choudhary Basti KM 0/00 to 0/500 (SW- C/o R/Wall from RD 0/010 to 0/038)
Construction of link road Boh to Hambar Km. 0/0 to 1/500 (SH- Construction of 6.00 meter span RCC Slab culvert at RD 0/480).
Job 5 Construction of link road Satian to Kutli in G.P. Heeran Thara SubHead C.O CC pavement at RD 0-0 to 0-185 Under MMSY
Job 2 Restoration of rain damages on link road to Khatrian Mohalla village Saloh Sub Head Remodelling of solid causeway at RD.0-100 DC Deposit
C/O link Road Allowang to Chamra Nalla Km 0/00 to 1/00 F/C 5/7 mtr Wide Km 0/500 to 0/820
R R damages to link road jiskoon km 000 to 800 SH P L Essential Kharanza stone solling at RD 1970 to 2120 4450 to 4780
Construction of Link road Thali road to Kashara Chanthal Km 0.0 to 3.00 SH Formation Cutting 5 7 mtr. Wide road at RD 0.405 to 2.000
Link road to Village Gujredha Km 0/00 to 0/450 (SW- Providing and laying G-II, CC Pavement at RD 0/00 to 0/140)
M T of MC Road from link road sangti to Village Shanan upto Bakhrai Temple (RD 0 0 to 1 125) in ward no 24 Sangti
R R Damags to link road village Karalash km 0 0 1 300 SH C O R Wall in 16 at RD 0 155 0 170
Periodical Renewal coat 30mm thick bituminous concrete with paver on link road to Village Satothar Km 0620 to 1400 HP1201 VR 0127 for the year 202627
C/O 35 mtr. span bridge over Marathu Khad on Link road to Village Lohat in TEhsil Kotkhai, C/o, Abutment, wing wall approach slab etc.
C/o link road from Linger to Rapering kothi Rashal Km. 0/0 to 3/500. (SH Formation cutting at Rd. 2/570 to 2/840).
C/O Link road to Santang Ribba Km. 0/00 to 0/800 (SH- P/L Interlocking paver block from Km. 0/00 to 0/400
Annual maintenance on link road to Heilipad Km. 0/0 to 0/650 for the year 2026-27 (SH P/L 30 mm thick Bitumenous concrete )
Job 6 Construction link road to the house of Champa Devi Village Bhadsali, Tehsil Haroli Distt. Una H.P Sub Head Construction of Solid Causeway Under SCCP
C/o link road from Jahlma Rest House to Manjemane Km. 0/0 to 2/500. (SH Formation cutting at Rd. 0/0 to 0/465).
C/o Link road Shashur Gompa to Mansu via Gumshal Km. 0/0 to 8/00. (SH Formation cutting at RD. 3/560 to 3/785)
R/R damages on Link road Dachhain Km. 0/00 to 2/500 (SH C/o PCC R/wall at RD 0/210 to 0/222)
C/o of link road/culvert from Jhhadhian Kalyanpur road to Parkash chand and Rattan Chand and others house, Mast Ram Nangal Nichla GP Gol Jamala.
Periodical Renewal coat 30mm thick bituminous concrete with paver on link road Takarla to Basuni Km 5630 to 7920 HP1202 VR 0121 for the year 202627
M.T of Link Road Jandra Nadhal Sari Km 0.0 to 1.0 SH P L WBM G II and Tarring work at RD 0.300 to 0.800 Deposit
Co Link road from Jhamber to Mohalla Chille Da Wara Mohalla Jattan GP Jhamber SH PL WMM Bituminous Concrete in Km 0000 to 0500 Under OTMNP
Construction of jeepable link road from Bhatera to Kalwara road Km 0/000 to 1/800 (SH F/C at RD 0/000 to 1/800
Construction of Link road Village Bambrad Km 0/0 to 2/00 (SH- Construction of 8.00mtrs Span RCC Slab culvert at RD 0/410)Under MNP
CO Link Road from Primary School to upper Kuru Km 00 to 1200 SH Construction of Cement concrete pavement from RD 0100 to 0200 under OTMNP
Construction of link road Sukrah to Madota via Pangthed road Km 0/00 to 1/600 SH F/C at RD 0/250 to 0/400.
Job 6 Construction of link road Tahliwala Chowk Sub Head P.L 80mm thick inter locking paver block at RD 0-0 to 0-150 UNDER OTMNP
CO link road Shaldigad to Dunana to Bhumper road km 000 to 2495 SHFC 57 mtr wide road at Rd 1720 to 1900 1495 to 1720
CO Link road from Battargalu to Tikkari Sarainjubbar via Tikkar Km 0.0 to 1.645 SH Formation cutting 5 7 mtr wide in Km 1.645 to 2.210
Construction of link road to Harijan Basti Amlehar km 000 to 2700 SH Providing and laying GSB and MT between km 1500 to 2700 under SCCP
Restoration of rain damage on Link road to village Rohtan upto Chatnol Dogri Km 0.0 to 6.0 SH CO Retaining wall at RD 0.975 to 0.995
CO Link road Badoli to Batuhi via Harizen Basti upto Mohalla Dharwal km 0000 to 0565 SH CO RWall in Wire Crate Km 0000 to 0055
C/o Link road from Dharonk Kainchi to Sehroli via Bandli Road in K.M. 0/00 to 7/00, C/o, Culvert at R.D. 1/920
Construction of link road from Bradha to Gahar, Shadara road Km. 0/0 to 1/350 SH Formation cutting in Km. 0/0 to 0/210.
Construction of link road Gallu to Khill Km 0/00 to 0/900 (SW- Providing and laying Mettaling Tarring at RD 0/00 to 0/900)
Job 6 Construction of link road Harijan Basti Jalgran km.0-00 to 0-300 Sub Head C.O CC Pavement, Breast wall, CC overlay Under SCCP.
Const of link road to village Athwan Harijan Basti km 000 to 2000 SH Const of Protection work along Nallah km 0800 to 1000 under SCCP
CO Link Road Saraji to Dharal Km 0.0 to 3.0 SH Formation cutting ROFD existing width to 5 7 mtr wide in Km 0.0 to 0.345
R R Damage to link road village telga km 0 00 to 3 00 SH P L G III at Rd 0 00 to 3 00
Restoration of rain damages on link road Bharwain Rest House HPPWD Bharwain SH PL WMM and PL 30mm thick bituminous concrete and Const of Vshape drain
Construction of link road to village Rohlgi Km. 0/0 to 3/500 in GP Shillirajgiri SH F/C in Km.0/0 to 0/225.
Construction of link road from Shetadhar to Temple Shati Nag km 0.0 to 1.0 SH- Providing and laying Kharanja soiling from km 0.050 to 0.320 Deposit
C/O link road to village Jhandian km 0/0 to 1/500 (SH C/O U shape Drain in km 0/200 to 0/300).
R/R damages link road to Village Dhar km 0/0 to 1/480 (SH C/O B/wall at Km 1/455 to 1/480).
AR and MO link road Takarla to Baruhi via New Abadi km 000 to 2500 SH PL WMM and bituminous concrete between km 1000 to 2000
C/O link road from Sail to Sajkhil km. 0/00 to 6/500 (SH - Removal of formation deficiencies in km. 2/400 to 6/225)
C/O link road from Churangal to Untpur Roa to thana Mour (SH C/O 3 mtr span slab culvert at RD 3/335) under SCCP
R R Damage to link road Kaneowara HB Bhamnallah KM 0 00 to 2 00 SH C O B Wall at RD 1 215 1 240