Loading…
Loading…
10,877 results • Best match
(SH - P/L 30mm thick bituminous concrete in km.0/0 to 1/0
(SH - P/L 30mm thick bituminous concrete in km.1/0 to 2/0
Restoration on link road to village Joh Km 0/00 to 2 885 SH CO 3 00 Mtrs RCC Box culvert at RD 2165 Under PDNA
Periodical Renewal coat 30mm thick bituminous concrete with paver on link road to village Gondpur Banehra on NMT road km 0000 to 1000 Under AMP 2020-21)
Improvement and Widening of road at Rd 11/900 to 12/110
SH Widening of road at narrow reaches at RD 9.300 to 9.390
SH Improvement of drainage system widening of road at Nadaun Chowk LHS
SH Widening of road at various RD between km 0.00 to 0.570)
(SH- Providing and laying 25mm thick Bituminous Concrete in km 1/0 to 1/750 including profile correction and thermo plastic paint strips) under PMGSY.
A/R and M/O Link road to Village Arla in Km. 0/00 to 3/500.(SH Repair to Pot Holes by P/L WBM G-III and BC at Various portion between Km. 0/00 to 3/500)DC Deposit
C/O link road from goela to Village Serta km 0/0 to 3/00 SH c/o 900mm dia RCC hume pipe culvert at rd 0/075 0/120 0/250 0/630 with wing walls and 3.00 mtr span slab culvert at RD 0/460 under SCCP
A/R and M/O on NH503 Extn Km. 0.0 to 44.700 (SH Strengthening and improvement of road safety Audits and Rectification of blackspot at Rotary Chowk Rakkar Colony and Bhatoli Chowk
Construction of link road from Panog to Ajroli Km 0/0 to 3/00 ( SH Formation Cutting 5/7 Mtrs wide road from Jeepable standard Cross-Drainage and P/L Soling Grade-I in Km 0/0 to 3/00).(SW- Construction of 900mm dia RCC HPC at RD 0/350, 0/670
MT on link road to village Kangar in Km. 0/00 to 0/605.(SH C/O essential Parapets, road side drain, C/O B/Wall, Excavating existing granular surface, P/L WBM G-I, G-II, G-III and Open Graded Premix Carpet 20mm thick with seal coat)Under Deposit work
Construction link road to village Bhalyani Km. 0/00 to 2/000 Package No.HP-06-185 and Construction of Panchali to Silling Road Km. 0/00 to 5/620 Package No.HP-06-182.
improvement of road NCAP multi time liner to clear in 102 cities road from Masulkhana to labour shed colony in km 0/0 to 1/900 SH P/L paver block side drain in km 1/0 to 1/900
R R Damage on Tutupani Kuthari Ghasni Deoli road km 0 00 to 18 680 SH C o widening of road at Rd 6 660 to 6 750 wing wall at RD 7 810 to 7 826 and wire crate at RD 13 460 to 13 510
Formation cutting, PCC Retaining walls, Created Breast wall, Cross drainage works, Side drain, Parapets, road sign boards and Metalling and Tarring) under PMGSY, (World Bank-RRP-II) Batch-II for the year 2018-2019 Package No. HP-02-347
C/O link road from Petrol Pump to kakkarhatti in Km. 0/00 to 1/400.(SH P/L WBM G III and 20mm thick Premix Carpet in Km 0/00 to 0/360, 0/37 to 1/205 and 1/410 to 1/800)Under MMGSY
Job 1 Periodical maintenance on link raod to Village Kungrat via Kalera road Km 0-0 to 1-800 VR080 Under Incentive Scheme PMGSY
Construction of Rajgunda to Bara Baghal road(Portion Bajol to Bada Banghal) Km. 0/00 to 21/400 ( Package No.HP-04-383) under PMGSY
C/O Jainthal Ghat to Dandor road km. 0/0 to 8/655 including 5 years maintenance under PMGSY Package No. HP-10-231
Upgradation of Sungari to Brandli road Km 0.000 to 9.000HP09726 and Upgradation of Bahlli to Baltidhar road Km 0.000 to 8.000 HP09728 PMGSY III
Construction of MT link road to village Miyour Km 00 to 2000 (SH Providing and laying GSB and MT betweem Km 0715 to 1450) under MNP
Recarpeting of link road from TVS Bhatian to Sintex BAPL, EPL Ltd, Sundram, Control Print, Fiem Industries etc upto Chaurasia Mandir and drain at Sanerh, G.P. Bhatian.
Job 7 Annual Surfacing on link road Baba Bodeshash road Bhadsali District Una HP in km.0-0 to 1-500 Sub Head P.L 30mm thick BC
Construction of link road from Uttri to Kumarli via Patan Km 0/0 to 2/500 (SH- Construction of 4.0Mtrs Span Slab Culvert at RDs 1/305)
C/O Link road Kanyo Shirla Anji Gagal Shikor road km 0/00 to 6/480 (SH ROFD in km 0/0 to 2/855) under MMGPY
C O link road to Amboi Bagi road km 0 0 to 3 000 SH P L Kharanja stone soling at RD 0 00 to 0 745
C/o of Link road to lower Dakhyut from Dangar Chokhna road GP Dangar SH Providing and laying cement concrete pavement at various damage reaches Under MMGSY
Construction of link road to village Sanaogi Km 0/000 to 5/000 SH Formation cutting 5/7 mtr wide road between Km3/375 to 3/780
Const of link road Harijan Basti Saloh Beri to Saloh km 000 to 3500 SH Formation cutting including Retaining walls between km 00 to 0500 under SCCP
R/R damages on link road to village Shashur Gompa Km. 0/0 to 6/500 SH C/O Breast wall and Retaining wall at various RDs.
CO link road Bhroli Kallan to Jhunjhnoo Km 00 to 8 0 SH CO 6mtr RCC Slab Culvert at RD 0 070 with both side wing wall
C/O Link Road to Palangri Kharkari Road 0/0 to 0/700 (SH-C/O 5.00mtr span RCC Slab culvert at Rd 0/75)(D.C Deposit)
Periodical Renewal coat 30mm thick bituminous concrete with paver on link road Chak Sarai to Gondpur Km 000 to 2700 HP1202 VR 0030 for the year 202627
CO link road to Civil Hospital Chintpurni km 000 to 0320 SH PL heavy duty interlocking paver block in km 000 to 0320 against Temple trust deposit
Periodical Renewal coat 30mm thick bituminous concrete with paver on Link Road to Village Sathother Km 000 to 0170 0190 to 0550 and 0620 to 1400 HP1204VR0127
Construction of Link road from Bathanu to Pokhari via Sheelground Km 0.0 to 1.840 SH Formation cutting 5 to 7 mtr wide in Km 0.240 to 0.495
C.O LINK ROAD CHALARA TO KALOHA KM 0.0 TO 2.00 SH SOILD CAUSEWAY AT RD 1.075 TO 1.090 .1600 TO 1.635 AND 1.600 TO 1.715 UNDER OTMNP
Link road to village Naura linking Thanpuri Jassour road in Distt Kangra (HP) (SH-Providing and laying soling and wearing in Km 1/400 to 2/600).
C/O link road from Kothi to Jaganji Km 0/00 to 2/00 (SH-C/O 900 mm dia HPC at RD 0/535 ) Deposit work
Co Link road from Gaon Pujarli to Harli Khad up to Tallpul Km 000 to 2500 SH FC 57 mtrs wide road at RD 2000 to 2390
Construction of link road from Karluhi to Madholi km 000 to 4000 SH Providing and erecting of W metal beam crash barrier at RD 0905 to 1060
CO link road Harijan Basti Bhaira to Harijan Basti Saloori km 000 to 1800 SH PL GSB WMM and Tarring between km 0530 to 1030 under SCCP
Providing MT works on Link road to village Ghunsa Km 0.0 to 0.300 SH Providing and Laying wearing coat G II M.T.Works in Km 0.0 to 0.320
Name of Work C O Link road to village Khangta km 0 00 to 0 500 SH C O 900mm Hume Pipe Culvert at Rd 0 190
Restoration of rain damages on link road from Harijan Basti Bhawai to Sunderghat Km 8/00 to 30/00 (SH Hiring of JCB for removal of slips)
C/o link Road Kuftu Andvi to H.B Joney Km 0/00 to 1/00 F/C 5/7 meter in KM 0/00 to 0/690
Construction of link road to village Baily Km. 0/0 to 4/500 (SH Formation cutting work at Km. 4/175 to 4/500 and Retaining wall)