Loading…
Loading…
10,877 results • Best match
C/o link road to Court Complex from DAV school SH Providing and laying cement concrete pavement at RD 0/670 to 0/920 under MMSY.
RR Damages on link road Tartu Pull Bhagadhar Mehra Runda road SH CO RWall at RD 0410 to 0430 and Bwall at Rd 0160 to 0190
Balance work of link road Band Vihar towards Jitender Bhuria House (SW- P/L WBM G-II , G-III, Tarring work and CC work (MC Deposit)
C O Link road from Kandralu Bawdi to HB Shonthru Banoti road SH F C 5 7 mtr wide road at RD 0 960 1 300
C/O Link road to Durgesh Colony Ward No-04 and 05 in Km 0/000 to 0/700 G.P. Darang Tehsil Jawalamukhi Distt Kangra (H.P.)
RR to link road Khabal to Sindasli road km 000 to 600SH Co Bwall and Rwall in RR 16 at RD 3330 to 33804960 to 4990
R R Damages to link road to village Panethi road km 0 0 2 0 SH C O B Wall at RD 1 630 1 680
RR Damages to link road Nichali Gayari to Jakha bai km 00-300 SH Removal of slips at various Rd s between Km 000 to 300
Construction of link road to village Luharwin G.P. Luharwin SH Providing and laying cement concrete pavement at RD 0/256 to 0/512 Under SDRF/NDRF
R R Damage on link road to village Shardu road KM 0 00 to 2 900 SH C O B Wall in 0 225 0 239
AR and MO link road from CT road to Jawal Basti Changan Km 000 to 2740 SH Repair of pot holes between Km 000 to 1000
C.o link road from Surad Bangla Ghat to Sara Kui G.P. Tipper Majholi Km.0/000 to 1.240 SH Formation Cutting in Km. 0.000 to 1.120.
R R damage to link road Village Shaunter road KM 000 to 1500 SH CO BWall in RR stone masonary 1 6 at RD 1390 1450
Construction of link road to Lower Dakhyut from Dangar Chokhna road G.P. Dangar SH Providing and laying Cement concrete pavement at various damage reaches Under MMSY
RR damages on Patta Awahdevi to link road village Dharoun km 000 to 100 SH C O R wall at RD 0 840 to 0 855
Construction of Road from Dafraik Niwas to Negi Niwas Panthaghati war No 29
CONSTRUCTION OF ROAD FROM BADHAl to DHIMAN BASTI BUHLA KM 0.0 TO 3.200
Construction of Road from Katgaon to Shango Km 0.000 to 1.500 HP.05.66
Construction of Road from Jani to Ramni Km 0.000 to 1.500 HP.05.67
Construction of road Jaipal house to Gurukul road in ward No 9 Nalagarh
R/R damages on Link road Dharampur to Govt Sen, Sec School Dharampur in Km. 0/00 to 0/750.(SH C/O B/Wall in PCC at Rds. 0/387 to 0/395)
Prov. SOP for prov. re-organization of 3-phase LT Line due to widening of road by Public Works Department near existing 100 KVA S/stn Mohin (OMD) in (E) section Dosarka UESD No.II Hamirpur. T.S. No. 114/2025-26 (ON PARTIAL TURN KEY BASIS).
C O Link road from Shilora Khurd to Shilora Kalan TipraMohalNaryal road in Km. 0 00 to 6 885 SH P L G II and G III in Km 5 345 to 6 885 Under SCSP
Providing and Laying Tack coat, 30 mm thick Bituminous concrete including profile correction and applying 2.5 mm thick hot Thermoplastic road marking strips (Retro-Reflective) between Km 4/00 to 5/00 and 5/00 to 5/500 (Year 2023-24 PMGSY road)
Metalling and Tarring, R-walls, B-walls, PCC drain, parapets km. stone, Setting out, Metal Beam, Paved shoulder, Missing CD and five year Maintenance Under PMGSY-II
(SH - P/L 30mm thick bituminous concrete in km.0/0 to 0/630
SH- Providing and laying 25mm thick Mix Seal Surfacing with Paver Finisher in Km. 0/000 to 0/600
Periodic Maintenance of Nagri to Mathrer road under (Rural road) (. HP 0402VR008319301) (AMP 2023-24) (SH- Providing and laying 30 MM thick Bitumen concrete with Paver finisher between Km 0/00 to 1/810)
Providing and laying bituminous concrete 25mm thick in km. 0/0 to 3/01/0 to 2/540 0/0 to 1/0 respecetively with paver finisher) DRRP No. HP-03-05 VR0094 VR0117 VR0118( Under PMGSY )
Job 6 Repair and Restoration of Panjawar Bathri road km. 23-0 to 34-0 Sub Head P.L CC Pavement with drain for R.O approach road to Talab upto the house of Capt. Ram Singh Pangoli Moh. Palkwah
Construction of Primary Health Centre at Haripur near Barotiwala, District Solan HP Sub Head Construction of Approach Road i.e cutting, filling, Co R.Walls, BWalls etc. and PL interlocking pavers ic G.I chain link fabric fencing, M.S. Gate a
Construction of Palchan Bye Pass to NHDL Specification from Km 5.800 on M-S Road to Km 2.900 Approach Road to South Portal (ARSP) under Project Rohtang Tunnel in the state of Himachal Pradesh (Net Length 7.090 Km)
Tender For Protection and paving of approach road and left over works of newly constructed ESD-II Bilaspur building. Sub-Head- Estimate for construction of boundary wall alongwith gate arrangement at ESD No. II Office Building at Bilaspur.
Construction of Heliport at Rora Tehsil Haroli Distt.Una SH C/o Building portion, WS and SI, Safety tank, Rain water harvesting tank, Heliport, Site development, overhead tank, Hanger, watch Tower, Security hut and approach road, providing E.I. Fire
Repair of road at km 0/00 to 2/00, (C/O R/wall at Rd 1/600 to 1/607) (DC Deposit)
C/o link road from Rakhog to village Paprol in Km. 0/00 to 4/540 (SH C/o 900mm dia RCC HPC along with wing wall at Rd 1/030 1/165 1/375 1/510 1/615 and 1/960) Under SCDP
C/O link road from Goela to Village Serta in Km. 0/00 to 3/00.(sH C/O 900mm dia RCC HPC at Rd. 1/300, 1/680, 1/880 and C/O unlined drain in Km. 1/00 to 2/00)Under SCDP
R/R damages on Subathu Delgi Bharti to link road Kyar Km 0/00to 3/500500 ( SH Hiring of JCB/ loader cum excavator for removal of slips and clearance of drain, berms dressing and hiring of Tipper for shifting of earth etc.) Under PDNA
Restoration of rain damages on link road to village Radiyana kms 0/00 to 2/500 (SH C/o B/wall at Km 2/030 to 2/050 and C/o wing wall and catch pit for existing CD at RD 0/810) Under PDNA
P/L Paver in parking and approach road
C/o link road from Dochi Chamara to Gharyan via Kiyartu in Km 0/00 to 1/850 (SH C/o road from jeepable standard to 5/7 mtr Wide in Km. 1/00 to 1/575) Under MNP
Providing and Laying WBM G-III, Prime Coat, Tack Coat and Mix seal surface).
removal of formation deficiencies in Km. 6/900, C/O R/Wall, B/Wall , C/O Cross Drainage work, P/L MT work, C/O road side drain , C/O essential Parapets in Km. 0/0 to 6/900
P/L 25mm thick bituminous concrete in kms 0/0 to/20 and G-III with 20mm thick premix carpet in patches and C/O drain at RD 0/600 to 0/700 and RD 1/200 to 1/300.
Removal of Formation Deficiencies, C/o R/Wall and B/Wall, C/o Cross Drainage Work, C/o C.C. Pavement, P/L M/T Work, C/o Road Side Drain, C/o Essential Parapets, P/F Road Sign Furniture and Dumping Site in Km 0/0 to 5/870)
Providing Metalling tarring removal of formation deficiencies, C O PCC R Wall and B/Wall, C/O Missing cross drainage works, PCC road side drain , parapets Kilometre stone and C O road side edging including 5 year annual maintenance
Providing and laying with paver finisher , road marking strips of hot applied thermoplastic compound (Painting line ) between Km 0/00 to 1/500 i/c five years routine maintenance)
SW- P/L with paver finisher , road marking strips of hot applied thermoplastic compound (Painting line ) between Km 0/00 to 1/390 i/c five years routine maintenance)
(SH - Providing and laying 20 mm Premix carpet, WBM-III for correction layer and thermoplastic for road marking in Km. 0/00 to 0/800)
Supplying and stacking of crushed stone aggregate 20mm, and sand)