Loading…
Loading…
10,878 results • Best match
Construction of link road Banlighatti Bairghat Pajeena Kuffer km 0/000 to 5/000 (SH- P/L WBM-III and Tarring in km 0/000 to 1/000)
C O link road to Kanewra Kenchi to Noie Km 0 00 to 1 100 SH P L Kharanja stone soling at RD 0 0 to 1 100
C.O LINK ROAD TO LOHARA WARD n0 5 gp bALIYANA KM 0.0 TO 1.0 SUB HEAD C.O 4 METER SPAN RCC SLAB CULVERT AT RD 0.575 UNDER OTMNP
CONSTRUCTION OF LINK ROAD TO LOHARA WARD NO5 GP BALIYANA KM 0.0 TO 1.O SUB HEAD G-II AND TARRING IN KM 0.0 TO 5.00 UNDER OTMNP
Construction of link road to village Nandla Jeep-able standard 2.75/5.00 metre K.M. 0/0 to 0/450 (SH Formation cutting and crate work for dumping site)
Construction of link road to Village Kot Km. 0/00 to 1/450. (SH F/c 5/7 mtrs wide road in Km. 0/750 to 0/945).
C/o link road from ropar road along Khanan Khad leading to super freeze, Bains hose pipe, Green Hawk, New Bansal Generation, Gopis Pharma etc Industries, GP Manjholi.
CO link road from Anti Subhar road to H.B Dharkoti serti km 0.00 to 1.750 SH FC in 5 7 mtr wide road at RD 0.100 to 0.345
Construction of link road Spedu to Goarth Km 0/00 to 2/00 (PDNA) (SW - F/C, R/Wall, Culvert, CC Pavement, Wire Crates, M/T Works etc)
Restoration of rain damages on link road from Battar Galu to Sarain Jubbar via Tikker km 0.00 to 1.645 SH CO Retaining wall at Rd 0.300 to 0.318
C/o link road Tikker to Dauladhar Km. 0/0 to 2/465 (SH- Providing and laying G.S.B. W.M.M. and M.T. in Km. 0/0 to 1/0).
CO link road Harijan Basti Baruha km 000 to 1500 SH CO Jeepable road formation cutting CD GSB WMM and Tarring between km 000 to 0750 under SCCP
Construction of link road Sunehra bridge to near IPH Pump House km.0.0 to 1.0 (SH C O Retaining wall from km.0.225 to 0.300(LHS) Under OTMNP
R R Damages to link road Jiskoon km 0 00 to 8 00 SH C O B Wall in wire crates at RD 5 750 to 5 810
Missing CD on link road Banne Di Hatti to Lower Andora km 00 to 40 SH CO 6 meter RCC slab culvert at RD 0100 including Wing wall
R R damages to link Road village Jiskoon km 0 00 to 800 SH C o B wall in Wire creates at RD 4 750 to 4 810
C.O LINK ROAD TO HARIJAN BASTI PUNANI KHUBAN KM 0.0 TO 2.0 SUB HEAD P.L GSB.G-II AND TARRING IN KM BETWEEN KM 0.0 TO 1.0 UNDER SCSP
C/O link road from Kushada to Samrahan Km 0/00 to 3/00 (SH- Metalling and Tarring in Km 0/00 to 2/00 under PDNA 2023)
C O Link road from Tiludhar gormubaan mandir km 0 00 to 5 00 SH 5 7 mtr F C cutting at Rd 2 495 to 3 720
AR and MO Link road to Village Marwari km 000 to 3400 SH Const wing wall both sides of existing 6 mtr RCC Slab culvert at RD 780
C/O Link road from Kushada to Samrahan km. 0/00 to 3/00. (SH- Metalling and Tarring in Km. 2/00 to 2/500 under PDNA 2023)
C/O link road to village Maddi wala Bera in G.P. Bhagani (SH-P/L 2cm.thick premix carpet surfacing at RD. 0/0 to 0/770) Under MMGSY.
Co link road from main road Jhijjar to Magru via Sihoti Km 00 to 4500 SH Co Rwall at various RDs between Km 0300 TO 2300 under SCDP
Construction of link road from Una Amb road towards Moksh Dham Mohalla Khawaja Ward No. 9 GP Upper Basal Distt. Una (HP) (KM 0/00 to 0/500)
RR Damage to link road karalash km 000 to 1300SH Co Rwall and Bwall at Rd 0400 to 0415 0 605 to 0 625 and 0682 to 0700
Const of link road Jallow Di Bar to Kunet Rattian via Behmba in GP Bhaderkali km 000 to 5000 SH CO Rwall at RD 2630 to 2670under MNP
R R Damage to link road village Jaloh Gadh kn RD 0 00 to 6 00 SH C O B Wall at Rd 2 615 to 2 686
C/o link road to village Naingarh via Chowkhang Helipad to Bridge Km. 0/0 to 1/900. (SH Formation cutting at Rd. 0/0 to 0/825).
C/O link road from Kachinghatti to Nag Km0/000 to 1/720 SH Formation Cutting 5/7 mtrs wide road in Km.0/285 to 1/045
C.O LINK ROAD CHALARA TO KALOHA KM 0.0 TO 2.00 SUB HEAD P.L GSBG-II G-III AND 25MM THICK BTUMINOUS CONCRETE IN BETWEEN KM 1.0 TO 2.0
C/O Link road to Upper Rizing Kanda Pooh in District Kinnaur HP 0/00 to 3/00 (SH- Formation cutting at RD. 1/860 to 1/950
Job 7 Restoration of rain damages link road lower Arniala Holgarh mohalla to Sainik Rest house Una Distt.Una Sub Head Construction of 3.00mtr. span RCC Slab culvert etc.
C/O link road from (NH-205) Gara to Moru in Km. 0/0 to 2/0 (SH- C/o 6.00 meter span culvert at RD 0/900)
C/O link road from Yangthang to Sasang Km. 0/00 to 0/900 in District Kinnaur HP (SH- Formation cutting at RD. 0/450 to 0/900
Annual Surfacing on link road to village Challan KM 0/000 to 2/285 SH Renewal Coat 20mm thick premix carpet in Km 0/000 to 2/285
Construction of link road from Sunehra bridge to abadi near IPH Pump House km.0.0 to 1.0 (SH PL CC Pavement in km.0.0 to 0.300) under OTMNP
SDP.2024.207 Construction of link road Mawa Kohalan to Nangal Jariala in G.P. Amboa Km 0.0 to 6.000. C.O Solid Causeway at RD 1.640 to 1.655 Under SDP
Construction and MT link road from Bagroo to Agriculture University Chak km 000 to 2330 SH PL GSB WMM and Tarring between km 1200 to 1700 Under MNP
C/O link road from Khadura to Tirsuling in GP Khadura Km 0/00 tom 0/915 (SH- ROFD and filling from Km. 0/350 to 0/610
C/o link road Nawi Karyah road km 0/00 to 2/000( P/L WBM G-II and tarring work in km 0/000 to 1/000)
Construction of link road from MTN Barot to Bankaroli via Sai Temple 0.00 to 0.800 SH Providing and laying interlocking paver block at R.D. 0.600 to 0.800 etc
C/O link road from Bhatewri to Bhog km. 0/00 to 4/00 (SH C/O 4.00 mtr span slab culvert at RD. 3/420) Under MNP
Construction of link road Dhuru Chhider Lohar Lahri in Distt Kangra (HP) Under MNP Head(SH-Construction of U-shape drain at RD 0/300 to 0/400).
Improvement of link road Ghambirpur Majhari road km. 0/0 to 0/600(SH- C/O U-shape drain at R.D. 0/0 to 0/525).Telecom Deposit.
Construction of link road from Ridhu Nallu Saryad km 0/0 to 1/00. (SH Construction of Retaining wall at RD 0/280 to 0/290) Under MMSY.
Balance work of link road Band Vihar to Jitender Bhuria House Km 0/00 to 0/500 (SW- CC Pavement Km 0/00 to 0/070 (MC Deposit)
C.O link road to Harizan Basti Paplah Km 0.0 to 1.500 S- C.o R.wall at RD 0.947 to 0.965 and soling wearing tarring at RD 0.945 to 1.100
C/o link road Dodhamb to Laleta Km 0/00 to 1/500 (SH C/o Approaches (R/Wall) Dodhamb side from RD 0/300 to 0/345)
Balance work of link road Speru to Goarth Km 0/00 to 2/00 under PDNA (SW- P/L G-III in Km 0/600 to 1/800)
R/R Damages on link road to village Gandhal Km 0/0 to 7/0 (SH- C/O PCC R/wall at Rd 3/555 to 3/570)