Loading…
Loading…
10,876 results • Best match
SH Providing and laying 25mm thick Bituminous concrete
P/L Bituminous Concrete 25mm thick at km 0/00 to 1/00 ,3/00 to 4/00, 4/00 to 5/00 and 5/00 to 6/00)HP0301VR0034 (PMGSY).
Annual Maintenance on various link roads in Sub division Bharari SH Providing and laying 20mm thick Mix Seal Surfacing including repair of road
Repair of road/C.C road and construction of path Chequerred tiles from Jagdish Suri house to MC Water tank in Ward No.6.
P/L 30 mm thick Bituminous Concrete, Thermoplastic Road marking and C/o Essential PCC Road Side Drain on Banog Kheri Road in Km 20/0 to 26/0 and Link Road to Village Satiwala in Km 0/0 to 1/200
Providing and laying 25 mm thick bitumen concrete laying with paver finsher in Km 3/0 to 4/0
Sh- providing and laying 25mm thick bituminous concrete WBM, G-III and thermoplastic paint in Km 0/0 to 4/00
P/L 30mm thick bituminous concrete in kms 0/0 to 0/795, 0/845 to 1/0, 1/0 to 1/450, 1/500 to 2/0 I/c 80mm thick interlocking paver block (ISI) marked in kms 0/795 to 0/845 and 1/450 to 1/500.
Providing and laying with paver finisher , road marking strips of hot applied thermoplastic compound (Painting line ) between Km 0/00 to 2/00 i/c five years routine maintenance
SH ROFD, M/T, R/walls, CD works, Drain, Crash Barrier and Parapets etc. Package No.HP-06-167.
SH F/C, C/O Passing places, Side drain, Parapets, Cross Drainage, CC Pavement, M/T and five years routine maintenance Package No.HP-06-187.
SH ROFD, R/walls, B/walls, Gabion walls, M/T, Cross Drainage work, Drain, Parapets, Crash Barrier, Citizen information Board, Logo Board, KM stones in Km. 0/00 to 4/850 Package No.HP-06-206.
PROVIDING AND LAYING TACK COAT AND BITUMINOUS CONCRETE INCLUDING PROFILE CORRECTION) (YEAR 2022-23 PMGSY ROADS)
Construction of 5/7 m wide approach road bifurcating from Lippa Asrang HPPWD road to various components at Lippa Intake site under Stage II and III, IKHEP, HPPCL, R.Peo - Construction of granular sub base grade-1 from RD 0.00m to RD 95m, RD 115 to 250m, RD 250m to RD 347m, RD 362m to RD 400m and RD 410m to RD 500mtr.
CO Link road Shilora Khurd to Shillu Kalan Tipra Mohal Naryal road in Km 000 to 6800 SH PL WBM GI in Km 300 to 4500, CO RWall in wire crate at Rds. 4810 to 4830 and CO Rwall in PCC at Rds 2370 to 2395Under SCSP
Widening of road in earth work at R.D. 68/885 to 69/067.50
SH Widening of road at RD 46.780 to 46.855 and 47.820 to 47.910)
CO Approach road of 17 Mile bridge tehsil Manali
SH Construction of R.C.C Retaining Wall, approach road etc
CO approach road of 17 Miles Bridge Tehsil Manali
Sub-Structure, super structure and both side approach road
Construction of link road from Gangtoli to Bambel Km 0/0 to 4/555( SH- providing and laying soling WBM G-I in Km 0/0 to 4/00).Under MNP
Providing and laying tack coat and 25mm thick bituminous concrete in km. 0/0 to 1/705 including 5 year routine maintenance after Periodical renewal.
Restoration of approach road to switchyard from outfall of TRC to upstream GanviII Power House RD 15.00 to 30.00 m damaged due to heavy flood in Ganvi khad on intervening night of 31.07.2024 and 01.08.2024 under Ganvi Power House Division Jeori
Job 4 R.O and R.D on approach road to house of Sh. B.D. Joshi Vill. Jalgran from Kuthar Rakkar Jalgran at RD. 4-560 Sub Head P.L 80mm thick paver blocks in RD. 0-0 to 0-150 Deposit work
Tender for Restoration of approach road to Ganvi-I Power House/ protection of switchyard by providing cement concrete wall/ stone pitching left bank of Ganvi khad downstream of bailey bridge between RD 150.00m to 190.00m which was damaged due to hea
Annual maintenance Plan-1 for the year 2025-26 on Approach road to SP Kullu Residence Km 0/00 to 0/600 (SH- Providing and laying G-III and 25 mm Bitumen concrete nd providing and fixing thermoplastic line etc.)
Providing and making Gabion structure with mechanically woven double twisted hexagonal shape wire mesh gabion boxes and PCC B/Wall Road from RD. 770 mtr. to RD. 900 mtr. at approach road to Surge Shaft of 3x42 MW Larji HEP
A.R and M.O on NH.305 Sainj Luhri Aut Road Km 0.00 to 97.00. SH. Providing and laying GSB WMM 50mm DBM 30 mm BC on Approach road Both Side for Manglour Bridge at RD 79.875 under NH Sub Division Banjar.
Construction of 55.00 meter span bailey Bridge at Tangling over Tangling Nallah on Shongthong Purbani road at R.D 1.545 SH-Providing and laying Kharanja stone soling and C.C pavement for both left and right side approach road of Tangling bridge at
Consultancy services for preparation of Detailed Project Report for construction of viaduct of Approximate length 400 Mtr at Km 158PT40 on Manali Sarchu road and Approximate length 350 Mtr at Km 6PT900 on Approach Road to South Portal including sub
Annual maintenance Plan-1 for the year 2025-26 on approach road to Bhutnath Bridge Km 0/00 to 0/750 (SH Providing and laying G-III and 25 mm thick Bitumen concrete in Km. 0/00 to 1/750
Construction of Burial ground and approach road near helipad including supplying internal Electrical installation and main connection etc. at AIIMS Bilaspur HP SH Providing and fixing MS gate on football ground and storage cabinet in Psychiatrist ward at AIIMS Bilaspur HP
M/R to GPRA Bemloe, Park Area & Chotta Shimla during 2023-24. SH: Provision of drainage from approach road of C-1 & C-2 to C-9 road, including provision of retaining walls and barricading and at GPRA Colony Bemloe, Shimla.
Repair & replacement of doors & windows of Quarter no 8 & 9 Single Line & provision of shed & railing on the ramp path from Sr. Account office to approach road near single line qtrs for PWD employees at Main campus at CRI kasauli (HP).
Repair & replacement of doors & windows of Quarter no. 8 & 9 single line & provision of shed & railing on the ramp path from Sr. Account office to approach road near single line qtrs for PWD employees at Main campus at CRI Kasauli (HP).
Periodic Renewal of Rural Road MTN to Bari khas extend to Barla Annual Maintenance Plan for the year 2023/24 SH Providing and laying 30mm single layer bituminous concrete HP0404VR006615204 km. 2/00 to 3/00
Periodic Renewal of Chhatral to Jhalal Road Under Annual Maintenance Plan of Rural Road for the year 2024.25 SH Providing and laying 25mm thick Mix Seal Surfacing Type A from Km.3.0 to 5.0 2.00 kms.
AMP on Gandiana to Badehtar km 2/00 to 3/00 VR-022 2 AMP on Lahar to Tarangwal road Km 2/0 to 2/200 VR-025 3 AMP on Marhun to Mansoli road Km 0/0 to 1/100 VR-028 4 AMP onThian to Bahan road Km 0/0 to 1/500 VR-034
P/L 30MM BITUMINIOUS CONCRETE KM 0/0 TO 1/0 AND 1/0 TO 2/0
AMP for the year 2024-25 on Rural roads 1 Pragpur to Sr Sec School Pragpur road-VR0140 SH Consruction of CC pavement in Km 0/800 to 0/870 1/900 to 1/200 2 Nakki Khad to Garli road VR 0132 SH PCC Vshape drain from RD 0/450 to 0/521 3 Basalag to Ch
Annual Maintenance Plan for the Year 2023-24 on SAKB road MDR075 and Link road to Village Bill SH Providing and Laying renewal coat by providing 30mm thick Bituminous Concrete, thermoplastic edge line in Km. 3000 to 3100, 3200 to 32300 6400 to 6500 a
R/R damages to link road to village Arla in km 0/00 to 3/500 (SH- Repair of damaged portion of road curst by providing and laying GSB, WMM in kms 1/00 to 2/00 and 30 mm thick BC in kms 1/00 to 3/00) Under PDNA
(SH- Providing and laying 25mm thick Bituminous Concrete using plastic waste in km 0/0 to 1/0 including profile correction and thermo plastic paint strips) under PMGSY.
Job 12 Restoration of rain damage link road Umrali Singha road Km. 0-0 to 6-530 Sub Head C.O Retaining wall RD 3-300 to 3-425 .
C.O LINK ROAD FROM GP CHOULI AGANWADI CENTRE TO NICHLI CHOULI VIA DHIMAN BASTI KM 0.0 TO 6.00 METER SPAN RCC SLAB CULVERT AT RD 1.055 UNDER OTMNP
Periodical Maintenance of link road to Village Shukarang (Under Annual Maintenance plan for the year 2022-23 (STATE road) (SH- Annual surfacing from 0/00 to 0/530)
Construction of link road from Bhadroya to Dhangu Pul via Karshnik Ashram km 0.0 to 1.500 SH PL wire crate at RD 1.190 to 1.250 R.H.S Deposit work
Construction of Link road from Lower Raika via Tikkr Panar Kaltu Upper Raika Km 0.0 to 1.375 SH Formation cutting 5.7 mtr wide in Km 0.630 to 0.920
Pro.M.T.Works on Link Road Power project Coloney Chounri to Jakhori Km 0.0 to 1.300 SH PL GSB WBM II and M.T.works at RD 0.0 to 0.800 DEPOSIT BASP