Loading…
Loading…
10,878 results • Best match
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement and road signages etcetra including five year routine maintenance
Construction of road from Bhootan di Pukhar to GSS Manoh Sihal via Muslim Basti in G.P. Manoh Sihal KM 0.0 to 1.100 under SCDP Actual Name Construction of road from Bhootan di Pukhar Khungial GSS Manoh Sihal Jagnoli Tubewell MTN road km 0.0 to 2.60
Performance Based Routine Maintenance of MDR/Rural Road in District Bilaspur Block Sh.Nainadevi ji at Swarghat (SH (i) Sh.Nainadevi Ji Bhakra road Km.13/0 to 28/0 (ii) Sh.Nainadevi Ji Bhakra road to Village Kharkari Km.0/0 to 5/0 (Length-20 Kms.)
Periodic Renewal of Bhatoli Aghar Rey road to Jakhbar via Kasiyal road Under Annual Maintenance Plan of Rural Road for the year 2024.25 SH Providing and laying 25mm thick Mix Seal Surfacing Type A from Km. 2.0 to 3.0 and 4.0 to 5.0 2.00KM
P/L GIII Primer Coat Tack Coat 25mm thick MSS Type A
Providing retaining structure, Missing CD, Metalling and Tarring, road side drain including 5 years maintenance in km 38/0 to 43/0 under PMGSY-II Batch-I Package No. HP-10-270
Construction of Link road from Mandhole to Harijan Basti Mandhole KM 0.00 to 2.00 SH P L Kharanja Soling at various RDs and C/O retaining wall at RD 0.405 to 0.420,1.075 to 1.085 SCSP
Restoration of rain damage on Link road to Thana via Turan Km 0.0 to 5.060 SH CO Retaining wall at RD 2.965 to 2.980 and Retaining wall in wire crate at RD 2.950 to 2.965
Job 13 Periodical maintenance link road to village Fatehwal (Bangarh to Fathewal HP1205 VR030 Sub Head Patch work, 30mm thick BC, Zebra crossing and side lines km.0-0 to 1-0 Under State Head
Job 11 Construction of link road from Old Hoshiarpur road Bridge to New Abadi Lalsingi km. 0-0 to 1-0 Sub Head C.O C.C. Pavement at RD 0-0 to 0-120 Under MMSY
Public path from Stay Home Building to Link Road Dargah in ward No 9 Kachighati (SH Providing and Laying C C 1 5 10 with plum C C 1 2 4 and steel work etc)
Construction of link road to Harijan Basti Pab Km 0/0 to 2/0 in Distt. Sirmour HP (SH - Formation cutting 5/7 Mtrs. Wide road in Km 0/705 to 2/0) Under SCSP
R/R Damages on Tillu Link road in K.M. 0/00 to 1/150, C/o, R/Wall at R.D. 0/585 to 0/615 and B/Wall at R.D. 0/025 to 0/035
C/o link road Neri to Ashamajari road Km. 0/0 to 1/600 (SH- Providing and laying Grade-I and C/o 900mm dia hume pipe culvert in Km. 0/0 to 0/500).
Co and MT link road Pangloo to mairi via Mayor Sanoh including 1No Bridge (portion Gwalsar to Sanoh Km 00 to 20SH Providing and laying GSBWMM and Tarring between Km 1500 to 20 under MNP
Construction of link road from Pab Khala to village Pab km. 0/0 to 1/300(SH-Removal of formation cutting deficiency in km. 0/165 to 1/210 ) Under MNP revised working estimate thereof.)
R/R Damages on Avera Ghatoo road km 0/00 to 10/600 Nauni to Tirmidhar road km 0/00 to 1/720 and link road to village Bhalsi km 0/00 to 4/200
M/T on link road from Gondhla to Phuktal Km 0/0 to 2/00 SH Providing and laying 20mm thick premix carpet with seal coat including correction layer Km 0/0 to 1/0
Construction of link road from Yol to 53 Miles (Yol Rajiana road) Km 0/000 to 10/550 in Distt kangra (HP) (SH-Construction of retaining wall in Km 1/370 to 1/386) (L.H.S.)
C/O link road Doli to talouti road in km 0/0 to 2/00 (SH C/O unlined drain by manual means in km 0/500 to 2/00) under SCCP) 2020-307-2596
RR Damage Link road village Garot km 00 to 0400SH Co Bwall at Rd 0277 to 0254 0090 to 00965 and 0096 to 0101 and 0101 to 0106 0155 to 0 162 0220 to 0227
Const of link road from Private ITI Mairi to Dadhwala Mohalla under GP Mairi Km 000 to 1500 SH Formation Cutting filling and Co Edge wall both side between Km 00 to 0650 Under MNP
Restoration of Rain Damages on link road from Main road Harizan Basti Odder Via Crescent School and Panchayat Ghar upto NH KM 0/00 to 3/500 (SW - Repair of Pot holes in various roads)
Metalling and Tarring of link road from Pancha to Patka vid Panva Km. 0/00 to 6/165 (SH- P/L Grading-I, Grading-II and Premix carpet from Km. 0/00 to 3/00
R/R Damages on Kiari Link road in K.M. 0/00 to 5/00 C/o, R/Wall at R.D. 4/180 to 4/210 and B/Wall at R.D. 4/175 to 4/210
CO link road to Baba Beli Ram Dera to Ward No 6 Lalsingi km 0.0 to 1.200 (SH CO U shape drain and edge wall and CC Pavement at RD 0.0 to 0.300) Under OTMNP
Repair and Restoration of Rain Damages link road Andora to Shivpur via Banne Di Hatti Km 000 to 4450 SH Co PCC UDrain between RD 1900 to 2100 and 2650 to 2900 Under PDNA 2023
CO Link road from Dangehra Jole to Takka via Kuryala Haler Chhalver km 0000 to 11030 SH PL Interlocking Paver Block at RD 1560 to 1635 and CO Edge wall at RD 8700 TO 8760
A/R and M/O Link road from NH-22 to Thangi Km 0/00 to 9/370 (SH- P/L correction layer of Grading II and III from Km. 5/00 to 9/370
C.O. Balance work of link road from Togi to Dhair Km. 0.000 to 1.975 SH M.T. C.D work side drain essential parapets R.walls B.walls at various RDs and maintenance for five year after completion HP06316
Construction of link road Chilla Chogla Behal Sai Kanaita Sai Brahma (G.P. Kacholi) Km. 0/0 to 4/150 (SH- Formation cutting, Retaining wall and hume pipe culvert in Km. 0/0 to 1/150)
C.O link road from Nichar to Puje via Gradhe Km 0.00 to 2.600 SH-5.7 mtr wide Formation cutting b.w Km 1.915 to 2.200 and C.O R. wall in wire crates at RD 1.915 to1.935.
C/o Link road from village Masad to Harijan Basti China Kandhi Masad road Km 0/00 to 1/00 SH- C/o R/wall at RD 0/876.50 to 0/893. BSP/2022/349.
R/R damages on link road to Marighat Dinger Mathanan road Km 0/0 to 22/0 (SH- C/O R/wall at RD 11/060 to 11/075 and 11/390 to 11/405)
R/R Damages on Link Road from Dharonk Kainchi to Sherdoli via Bour Bankufer Km 0/00 to 5/200 C/o Wire crate wall at various Rds Damaged between 0/400 to 0/600
MT works on link road from main road Kalaras to Kharai km 0/00 to 1/260 SH C/o R/Wall at RD 0/630 to 0/660 and 1/220 to 1/240
Construction of link road to village Karganoo km 0/0 to 1/570 (SH Providing and Laying G-III Premix carpet with seal coat in between km 1/240 to 1/570using cold mix technology).
Construction of link road from Gheena to Lohar Lahri Jandrah Km 0/000 to 6/980 (SH Construction of R/Wall, cross drainage, Drain, Parapets and Metalling Tarring in Km 0/000 to 5/200)
C.O Link road Kakrot to Bhour via Badehar in GP Badehar Km. 0.0 to 1.600 SH C.O R.wall at RD 0.560 to 0.573 and 0.592 to 0.680 and CC pavement at RD 0.00 to 0.090
Job 9 Construction of Link road to village Rampur, District Una H.P km.0-0 to 1-0 Sub Head C.O Retaining walls, C.C Pavement, tarring and drain in km.0-0 to 0-360
Annual Maintenance Plan for the year 2021-2022 (Village Roads) on Link road Bharka to Nahar Singh Temple in Km. 0/0 to 0/800-(SH- Providing and laying 30mm thick bituminous concrete (VR -0225)
Construction of link road to village Dhand in G.P. Kando Kansar km 0/0 to 2/0. under SCSP.(SH Construction of RCC Box cell type culverts of 3.00 mtr span at RD 1/745)
Improvement and widening of link road from Shitti Nallah Khangsar Meh bog road Km. 0/00 to 10/00(SH R.O.F.D. at various Rds. 7/750 to 8/245 and 9/690 to 10/00)
C/o Balance work link road NH-21 to village Kacholi in Km. 0/0 to 5/0 (SH- Providing and laying M.T. work and V-shape drain in Km. 4/060 to 4/850).
CO link road Chadda Mohalla km 000 to 1120 in GP Deoli SH CO Edge wall at RD 0090 to 0150 causeway at RD 0050 and PLGSB MT between km 000 to 0250 under MMGSY
CONSTRUCTION OF LINK ROAD FROM HRTC WORKSHOP TO DEHRA TO JATT BASTI KM 0.0 TO 1.00 SH FORMATION CUTTING AT RD 0.0 0.550 GSB 0.0T 0.500AND HPC AT RD 0.250 0.430 AND EDGE WALL MMGSY
Job 8 Construction of Link road from Vill. Kuthar Beet to Abadi Jodian km. 0-0 to 1-800 Sub Head P.L GSB, WMM and BC in km. 1-400 to 1-800 Under OTMNP
M/T works on link road from Nirmand to Johad via Ambika Mata Temple at Nirmand Km. 0/00 to 4/435 (SH- P/L Meatling and tarring in Km. 1/835 to 4/200).
Construction of Link road from Bhatewari to Bhog 0/00 to 4/00 (SH C/O 900 MM Dia RCC Hume pipe culvert at RD. 0/975, 1/090,1/500 and 2/420) Under MNP
R/R Damages on link Road to Chhajoli Km 0/00 to 0/810 C/o B/wall at RD 0/290 to 0/305 and R/wall at RD 0/390 to 0/400