Loading…
Loading…
10,878 results • Best match
R/O R/D on link road from Simble Nallah to dalahar (SH P/L Kharanja Soling at Rd 0/460 to 1/205 and Hume Pipe Culvert at Rd 0/340 and 0/800
C/O Link road from Upper Richenag to Kutumdumb Km. 0/00 to 1/900 (SH- F/C from Km. 0/675 to 1/395 and R/wall at RD. 0/920 to 0/930
Repair and restoration work on link road to village Nagnoli from Gagret road KM 0/0 to 5/560 SH C/o Breast wall in RD 4/700 to 4/803 RHS under PDNA 2023
Const of link road Karluhi to Mandholi km 000 to 5500 SH Removal of formation deficiencies between km 4000 to 500 and Const of 900mm dia RCC hume pipe culvert at RD 4240 under MNP
CO Link road from Jhamber Bridge to Mohalla Chille da Wara Mohalla Jattan GP Jhamber km 0000 to 1000 SH CO RWall from Rd 0670 to 0730 and CO BWall in km 0650 to 0730
M/T on link road Mooring Chowkhang Naingarh road Km 0/0 to 14/0 SH Providing and laying 20mm thick premix carpet with seal coat including correction layer Km 8/0 to 9/0
R R Damage to Link road Kanthali KM 0 00 to 2 00 S H C O R wall in R R masnory in cm 1 6 at R D 0 198 TO 0 215
R/S damages on link road from Mooring Chowkhang Naingarh road Km. 0/0 to 12/00. (SH C/o R/wall at RD. 10/158 to 10/206 and 10/263 to 10/271
C.O. Chauradhar to Paneo road Km 0.000 to 8.015 C.O. Link road from Shamsher to Chalhon Km 0.000 to 3.420 and C.O. road from Shamsher to Panei Km 0.000 to 9.390 HP06370 HP06375 and HP06376
C/o link road Kariyada Main road to Awani Khad Main road via Gurudwara Km. 0/0 to 1/200 SH P/L Cement concrete pavement in Km. 0/0 to 0/300 under MMGSY
Repair and maintenance on link road Muglawala Kartarpur Bangran Chowk Road km.0/0 to 2/750 (SH-Providing and laying 25mm.thick bituminous concrete between R.1/200 to 2/300) (Under R and MO).
RR damages on Harli to Gosangu road km 000 to 2500 and other link road under kawar SubDivision SH Hiring of Excavator cum loader pock Lane for removal of slipsdressing of road surface shoulders etc
C/o Link road Dhanroti Nallah to Kehmli Bahlidhar Purag road in K.M. 0/00 to 2/00, Balance work Formation Cutting in 5/7 mtr. wide road in K.M. 0/240 to 0/315
Restoration of rain damage on link road ExPradhan Madan Lal to Roshan Di Hatti to Bumbloo Deoli Km 00 to 2045 SH Co CC pavement MT etc in Km 0925 to 1500 against DC Deposit
Construction of link road from Haripur Tohana to Mashuta Basti Garibnath Mandir village Shivpur Km. 0/00 to 1/675. (SH- Construction of 2.00 mtrs. Span RCC Slab Culvert at RD. 1/630 Under MNP.
Job 14 Restoration of rain damages on Link road to Village Kuthar from Una Jaijon road km. 0-0 to 2-500 (Sub Head C.O U-shape drain at RD. 0-600 to 0-800
C/o link road Mehlog Dilman Vis Kujji Km 0/0 to 4/750 ( SH- P/L Soling G-I in Km 0/980 to 1/500 and 2/500 to 3/00 ) Deposit SCSP
C/O Link road from Hango Bus Stand to Hango Village Km. 0/00 to 1/700 (SH- Providing and laying G-II, G-III and Premix carpet from Km. 0/00 to 1/700
Job 13 Restoration of rain damages of Link road from Ghaluwal to Village Bhoolgarh Tehsil Haroli Distt. Una km. 0-0 to 2-600 SubHead P.L Paver block at RD. 1-700 to 1-820
Balance work for Const of link road from village Gindpur Maloun to Tappa Sidh km 000 to 2500 SH Construction of Breast wall at RD 0840 to 0866.65 and 0895 to 0905 Against Telecom Deposit
Job 14 Periodical maintenance link road to village Fatehwal (Bangarh to Fathewal HP1205 VR030 Sub Head Patch work, 30mm thick BC, Zebra crossing and side lines km.1-0 to 2-0 Under State Head
C/O link road from Bias Irrigation canal to Bias Bhood km. 0/0 to 1/600 (SH-Construction of retaining wall in wire crate from RD. 1/360 to 1/375)(L.H.S) Under MMGSY.
R R Damages to Link Road Jiskoon under kawar Sub-Division in Kawar Section SH Hiring of Pock lane i c Rock breaker to break boulders in various reaches Portion 4 00 to 8 00
C/O link road from village Sail to Kelwad Sajkhil km. 0/00 to 6/500 (SH - C/O 900 mm dia Hume Pipe Culvert at RD. 2/640,2/690,3/945,5/090 and 5/875)
Metalling and Tarring on link road from Kalpa Pangi to Tarkhawa in G.P. Telangi Km. 0/00 to 2/00 (SH-Metalling and Tarring and V-shape drain at RD. 0/00 to 1/00
Periodical Maintenance of Link road from Kalpa Bus Stand to Kinner Villa (VR-HP0502VR007321101) (Under Annual Maintenance Plan for the year of 2022-23 (STATE road) (SH-Annual surfacing from 0/00 to 0/900
C/O link road from Khood to Makhrol km. 0/00 to 2/300 (Jeepable)(SH Mettaling Tarring P/L 900mm Dia Hume pipe Culvert and FORD at between RD 0/00 to 2/300
Job 2 Construction of Link road Amrali to Beetan to Gahua km. 0-0 to 1-0 Sub Head Providing and Laying WMM, Prime coat ,BC at km. 0-400 to 0-750 Under OTMNP
R/R damages on link road Changer Ghumarn Nisal km 0/0 to 4/100 (SH C/O B/wall at RD 1/150 to 1/184) under PDNA ( LAT 76.821999 LOG. 31.100609).(2nd Call)
Extension of link road Harizan Basti Saluhi to Kabirpanthi Basti Batti GP Pirsaluhi Km 00 to 1750 SH PL GSB GII GIII and Premix carpet with seal coat in Km. 00 to 0250 under SCDP
Annual repair of link road for village Kala Johar Km. 0/0 to 0/765 (SH- Providing and laying 20mm thick premix carpet with seal coat from Km. 0/0 to 0/765) Deposit work
R/R Damages on Koti link Road Km 0/00 to 1/500 C/o R/wall at Rd 0/535 to 0/569 and 0/755 to 0/767, 0/735 to 0/754
Upgradation of link road Umrali Dhilwan Heeran Thara Pubowal to Polian via Kuthar Beet Km 0/0 to 10/390 SH FC,CD,P/L GSB,WMM,DBM, BC L 7/00 to 9/900
Restoration of rain damages on link road Jole to Kaint via Bhooran Amroh Dhrun,Kuhroo Sanjot road at Km 000 to 14255 SH Const of Retaining wall at RD 13700 to 13713 Against DC Deposit
Restoration of rain damages on link road to Harijan Basti village Upper Arniala via Dhesi Mohalla Village road Tehsil and Distt U na (SH PF CC interlocking paver blocks and R/wall ) (under PDNA Deposit)
Balance work of link road from IPH Colony to Khilroo Bindraban connecting Jamwal Colony Katoch Awadi CVD Khalet at Lekh Raj house Km 0/00 to 4/00 (SW- C/O Wire Crate R/Wall)
R R Damages to Link Road Jiskoon under kawar Sub Division in Kawar Section SH Hiring of Pock lane i c Rock breaker to break boulders in various reaches Portion 0 00 to 4 00
R/R Damages on Link road Kunplate on Nand 0/00 to 11/00 (SH C/O Crate wall in R/wall at Rd 1/440 to 1/478)(under PDNA)(LAT 76.728927 LOG 31.219082)
A/R and M/O NH-154 Banuri to Upper Jhaler, C/o link road Banuri to Bharmat to Upper Chandpur Km 0/00 to 1/500 (SW - Repair of Pot holes in various RDs)
C.O LINK ROAD FROM TOOTIAN DA BEHRA TO GHATTI DA GHRAT AT PAISA SC BASTI INKM 0.0 T 1.200 SH C.O CEMENT CONCRETE PAVEMENT RD 0.0 TO 0.090 0.220 TO 0.430 AND BOTH SIDE MMGSY
Construction of R.C.C.Tied Arch Bridge over Sunkro Khala at RD. 1/245 on link road to Harizan Basti Khairni Palhori Simbalwala km. 0/0 to 4/600 in the State of Himachal Pradesh (Under S.C.S.P.).
C/o Link road from RSSB Bhawan Kotla to bholi Ward No.1 (SH Providing and laying cement concrete pavement in Km 0/0 to 0/225 and 0/410 to 0/490) under MMSY
CO Link road from Tikkari Tangnu to Janglikh Km 000 to 400 SH CO BWall in wire crate at RD 1820 and Rwall in wire crate at RD 3525 to 3547 and 6060 to 6070
C.O. Balance work of link road from Kufridhar to Jaterh Km 0.000 to 3.900 SH M.T. C.D work side drain essential parapets R.walls B.walls at various RDs and maintenance for five year after completion HP06320
Landslide mitigation measures for prevention of land slide disaster on Pucca Tala Ghar on link road to Chamba town to Baloo under Chamba Division (SH Providing Shot creting, at RD 0/0 to 0/080 )
Construction of link road from Kullarun to DAV School to Civil Court Ghumarwin SH Construction of Hume Pipe Culvert at RD 0/040 and Interlocking Paver Blocks at km 0/00 to 0/080Under DMFT
Const of link road Kailu Di Bar to Kalu Di Bar via Bhararbar km 000 to 0500 SH Const of Retaining wall at RD 2500 to 2520 2635 to 2650 and 2679 to 2700 under MNP
(SH- Construction of Sub Structure, Super Structure and approach road) Under NABARD RIDF - XXVIII
Construction of approach road and site develop for sludge drying bed sewerage plant Theog
Construction of Link road from Peerbad to Farred Km 000 to 1830 in District Kangra HP SH Formation Cutting Const Retaining walls Cross Drainage work GSB WBMII WBMIII CC Pavement tarring