Loading…
Loading…
10,878 results • Best match
RRD on link road to village Shirar
RRD on link road to village Pool
RRD on link road to village Kanyal
M/R to GPRA at Longwood and Craigdhu Shimla during 2023-24. SH: Replacement/Restoration of existing cracked/slided stone masonry gravity retaining wall into plum concrete wall including carrying out related items behind type-I quarters at Sylvan hall ... Craigdhu approach road at ...
R/R Damages on Link Road to Mandroli Kuri Kharana Halai Km 0/00 to 5/810 C/o B/wall in wire crate at various damaged/sliding Rds between Km 0/250 to 0/350
C/o Link road Kund Nalla (Jauni) to Hurna G.P. Garawag road in K.M. 0/00 to 0/400 C/o, F/C in 5/7 mtr. wide road in K.M. 0/00 to 0/375
AMP of link road Tanda Pantehar Patti Deogran Km 0/00 to 1/500 (Road No. 1001541) (SW- Providing and laying 30 MM thick Bituminous Concrete with Paver Finisher in Km 0/00 to 1/00).
C/O link road to village Kher Kujewala to Thakkar km. 0/0 to 4/735. (SH C/O Retaining wall in cement concrete and wire crate at RD. 3/220 to 3/250) (Under D.C.Deposit).
Reconstruction of khala (Abhi ka Khala) on Badripur Jamniwala Parduni at link road Damaged due to heavy Monsoon km. 0/0 to 15/0. (SH- Re-Construction of RCC Box cell bridge at RD. 7/915).
Construction of link road from Bhuppur to Tibbetian colony km. 0/0 to 1/320. (SH- Construction of 2.00 mtrs span RCC slab culvert at RD. 0/512 along with both side wing wall) under MNP.
RR Damage to link road Jabbal km 000 to 600SH Co Rwall and Bwall at Rd 0615 to 0635 0900 to 0925 1265 to 1295 1295 to 1325 2115 to 2130 4010 to 4030 UNDER PDNA
C/O Link Road from Village Ratwa to Kunna via Tholla Kulyari Jarna Bhalaina road Km. 0/00 to 7/00 (SH - C/O 5/7mtr. Wide formation cutting at RD.3/00 to 4/00)
Construction of 50.00 mtrs span PSC Box Girder bridge over Baner Khad on link road from Naura to Thanpuri at RD 1/375 in Distt Kangra (HP) (SH-Construction of bridge work alongwith both side approaches)
Construction of link road Khad Samethan Neem wala Baba Mandir to H.B. Chokta in Km. 0/0 to 3/0 (SH- Providing and laying G-II and Premix carpets in Km. 0/0 to 1/0).
Improvement of link road to village Shanad Km 0/000 to 1/550 SH Improvement of narrow curve at RD 0/150 to 0/180 0/435 to 0/450 and 0/525 to 0/570
Job 4 Construction of link road Manuwal to Mohalla Mangal Dass km. 0-0 to 1-200 Sub Head Providing and Laying GSB, wet mix and Tarring in km.0-0 to 1-0 Under MMGSY
Construction of link road from Nauni to Tirmidhar Km. 0/00 to 2/330 under MNP. (SH- P/L Kharanja stone soling in Km. 0/00 to 2/330) actual Rd. 0/00 to 1/700.
Improvement of link road to Village Dev Jubbad Shelag Km 0/000 to 1/900 SH Construction of wire crate retaining wall at Rd 1/105 to 1/135 and 1/270 to 1/2/85
Construction of Steel Truss Bridge over Tailing Nallah at RD 3/120 on link road Tailing Yura Murti to Ratil road Km. 0/0 to 10/00 SH C/o Super Structure of steel truss bridge.
Job 9 Periodical Maintenance on link road GPS Baliwal to Abadi Jorian Km 0-0 To 1-530 VR144 Sub Head Patch work, 30 mm thick BC, Zebra crossing and side lines therein Under State Head
C/O link road Talarghat to award km 0/0 to 5/500 (SH P/L Gr-II, Gr-III and tarring work (MSS) in km 2/00 to 2/500) Under SCDP (2009-227-58609)
Restoration of rain damages on link road from Sadoon to Akrana Km 0/000 to 3/000 in Distt Kangra (HP) (SH-Construction of wire crates work in Km 2/700 to 2/730).L/S
R/R Damages on Ramnagar Panchayat Link road in K.M. 0/00 to 0/400, C/o R/Wall at R.D. 0/00 to 0/015 and B/Wall at R.D. 0/110 to 0/115
Restoration of Rain Damages on link road to village pipli km. 0/00 to 4/510 (SH C/O PCC V shap drain from km. 1/300 to 3/100 in essentail reaches ) Under PDNA 2023
CONSTRUCTION OF LINK ROAD GOVT MIDDLE SCHOOL NANGLA CHOWK TO SH DEV RAJ HOUSE VILLAGE GHURNWAR TEHSIL DADA SIBA DISTT KANGRA H.P SUB HEAD P.L CEMENT CONCRETE PAVEMENT IN KM 0.0 TO 0.285 UNDER INDUSTRIAL CORRIDOR
C.O Link road Nichar to Puje via Gradhey 0.00 to 2.600 SH F.C 5-7 mtrs from Km 1.915 to 1.975 C.O PCC R.wall in Km 1.915 to 1.975 and B.wall in km 1.915 to 1.975
Const and MT link road to village Bagroo to Agriculture University Chack km 000 to 2370 SH Const of Sub base including filling PL GSB WMM and Metalling Tarring between km 0700 to 1200)under MNP
C/O link road to village Bhalsi km 0/0 to 3/00 (SH C/O V-shape drain with edge wall at various Rds between 0/0 to 1/00) Under SCCP 2010-307-800).
R R Damages to RCD road km 0 0 to 92 695 SH Hiring of Tipper for carriage of muck stone in km 71 750 to 92 695 other variosu link road in kawar sub Division
Restoration of rain damages on link road from Sambal Nallah to village Mahran km. 0/00 to 5/300. (SH- Construction of Retaining wall at Km 5/130 to 5/145 to retain the earth filling).
C/O Link road to village Koti km. 0/00 to 2/00 (SH Improvement of formation deficiencies from km. at various RDs and C/O RCC Hume Pipe Culvert at RD. 0/545) Under MNP
Restoration of rain damages on link road Bada Naun to Chhota Naun Km 0/000 to 1/400 in Distt Kangra (HP) (SH-Providing and laying cement concrete pavement at RD 1/050 to 1/110).
Resotration of Rain Damages on Link road to village Kotlu from Galai Bramli Beru road km 0/00 to 0/500 SH C/o Cement concrete Pavement in km 0/150 to 0/205) under CRF.
Repair and Restoration of rain damaged on Link Road from Madan Lal Ex-Pardhan Roshan Lal Di Hatti to Fish Farm Deoli km. 0.0 to 2.050. SH Construction of Retaining wall at Km 0.636 to 0.671
Job 6 Periodical maintenance on link road to Village Kungrat via Kalera km. 0-0 to 1-0 Sub Head Patch work, 30mm thick BC in km. 0-00 to 1-00 VR080 UNDER STATE HEAD
Job 5 Periodical maintenance for link road GHS to water Tank Mohalla Khindrian VRO 99 km.1-500 to 3-0 Sub Head Patch work, 30mm thick BC, Zebra crossing and side lines Under State Head
Job 1 Construction of link road from Una Basoli road to PGI Satellite Center km.0-0 to 0-250 Sub Head P.L Granular Sub base, WMM and bituminous concrete RD.0-0 to 0-250)
Periodic maintenance of link road to PWD Rest House at Rarang Km. 0/00 to 1/675 under Annual maintenance plan for the year 2020-21 (SH- Annual surfacing from Km. 0/00 to 1/675
C/o Link road Dadhol Kallan to Village Balh km 0/00 to 1/00 in GP Dadhol SH C/o Approaches R/wall at RD 0/641 to 0/645 Dadhol Kallan side U/S.
R/R Damages on link Road to Village Kundli in Km 0/00 to 1/200 C/o R/wall and B/wall at various damaged / sliding RDs between Km RD 0/500 to 0/600
Job 4 Periodical maintenance for link road GHS to water Tank Mohalla Khindrian VRO 99 km.0-0 to 1-500 Sub Head Patch work, 30mm thick BC, Zebra crossing and side lines Under State Head
Construction of link road from Goalthai Industrial Area road to Village Samtehan km 0/00 to 2/00 ( SH- Providing and Laying Gr.-I, G-II and Premix Carpet in km 0/00 to 1/270)
R R Damages link road to village Bashtari km 0 0 15 00 SH C O B Wall at RD 1 020 1 060 R Wall at RD 0 430 0 450 1 025 1 035
Construction of Link road Tonda to Siun via Harijan Basti Kotla km 0/00 to 6/00 (SH C/O 900 MM Dia RCC Hume pipe culvert at RD. 1/495 and 1/720 Under SCSP
Construction of link road Aerla to Haryat Km 0/000 to 2/100 in Distt Kangra (HP) (SH-Providing and laying cement concrete pavement in various reaches between 0/350 to 1/590 under SCSP Head)
Job 9 Construction of link road Nangal Khurd to Upper Manuwal to Lower Mannuwal RD 0-0 to 1-600 Sub Head C.O CC Pavement and Drain at RD 1-400 to 1-600 UNDER OTMNP
C/o link road to village Dadhiyat in GP Chhachetti km. 0/0 to 1/300. (SH C/o C.D. works and providing and laying G-I in km. 0/500 to 1/300) (under SCSSP).
Job 1 Periodical maintenance on link road to village Fatehwal Bangarh to Fatehwal km.2-00 to 5-600 Sub Head Providing and Laying 30mm thick BC, Zebra crossing and side lines VR030 Under State Head
Annual Maintenance Plan for the year 2022-23 On link road Killar Hudan Bhatori road Km 0/0 to 14/600 SH Providing and Laying 20mm thick premix carpet in Km 1/0 to 2/0
Construction of link road from Laa Devi Temple to Giri Basti Rajban Km. 0/0 to 1/450. (SH- Providing and laying wet mix mettaling and tarring in Km. 0/850 to 1/450) Under MNP.