Loading…
Loading…
10,878 results • Best match
Const and MT link road DSP Mohalla Kuthera Kherla km 000 to 1500 in GP Kuthera Kherla SH Const of Sub grade including filling PL GSB WMM and Metalling Tarring between km 000 to 0500under MNP
Construction of 20 Meter span RCC Bowstring Type Bridge over Jadla Khad at Rd 3900 on link road Jadla Pratham to nara Dukki Km 000 to 8000 SH CO Sub structure and super-structure Under SCCP
A.R and M.O link road from Ruturang Bridge to Bonning Saring road Km 0.00 to 6.750.SH-P.L Kharanja Stone soling at KM 3.435 to 3.700 and C. C. pavement at KM 3.500 to KM 3.680.
Construction of link road from Goalthai Industrial area road to village Samethan Km. 0/0 to 2/0 (SH- Providing and laying Gr-I, Gr-II and Premix carpet in Km. 0/0 to 1/270)
C/O link road from Shubhkhera to Himalyan International Factory km. 0/0 to 0/360. (SH- P/L wet mix macadam and 30 mm thick bituminous concrete between 0/0 to 0/360) Under Deposit.
Job 11 Periodical maintenance for link road Gondpur Turf Jai Chand to Girgira sahib VR020 Sub Head Patch work, 30mm thick BC, Zebra crossing and side lines km.0-0 to 2-0 Under State Head
M/T on link road Rewaling Thirling Talungway Mailing road Km 0/0 to 3/00 SH Providing and laying 20mm thick premix carpet with seal coat including correction layer Km 1/0 to 2/0
C/O link road Theon to kafleda GP mehla Km 0/0 to 4/500 (SH C/O 4 Nos. 900mm dia HPC at RD 0/640, 0/780, 1/430 and 2/195) Under SCCP
A.RAND M.O LINK ROAD FROM CHINTPURNI BHARWARA RAD TO BHARWAIN KAROA ROAD WARD NO 3KM 0.0 TO 1.250 SUB EHAD P.L CEMENT CONCRETE PAVEMENT AT RD 0.525 TO 0.873 AND R.WALL AT RD 0.605 TO 0.640
Restoration of Rain Damages on Link road to Village Devna Thanga km. 0/0 to 3/130(SH P/L WBM G-III from km. 1/00 to 2/00 in damage portion ) Under PDNA 2023
Restroration of rain damages on link road Dada Siba Daulatpur road Km 000 to 14000 Portion Km 000 to 9000 SH Reconstruction of Retaining wall including protection wall in wire crates between Km 4125 to 4145
Construction of link road from Dhaloon road to Dhaloon Society Km 0/000 to 0/700 in District Kangra, (H.P.). (SH-Construction of 3.00 mtr. Span RCC culvert at RD 0/035 alongwith both side approaches.)
Construction of link road from NH-07 Puruwala to Johron km 0/0 to 0/840. (SH-Providing and laying interlocked concrete block pavement 80mm thick at RD 0/340 to 0/840) Under Deposit work.
Restoration of rain damages on link road Thana Bargran Busal Km 0/000 to 4/300 in Distt Kangra (HP) (SH-Providing wire crate protection work in various reaches between Km 1/700 to 2/000)
Construction of link road Jamnighat, Jheel Bankabara to Dhaunwala Km. 0/0 to 5/020. (SH Preparation and Consolidation of Sub grade and providing and laying GSB in Km. 1/500 to 2/670) Under SCSP.
Job 2 Restoration and rain damages on link road to Jhundian Mohalla Ward No. 5 Mehatpur Distt. Una Sub Head C.O Retaining wall at RD. 0-045 to 0-098, M.S. railing etc. DC Deposit Work
Periodical Maintenance on Bangana Thathoon road via Tamlet in Km 0000 to 1300 and Link road from UAM Road to Village Muchalli in Km 0000 to 1000 SH PL 30mm thick Bituminous Concrete including Profile Correction
C/O and M/T link road Pirthipur Bridge to Faquiti Mohalla under GP Pirthipur Km. 0/0 to 2/800 (SH. Providing and Laying GSB, Metalling and Tarring in Km. 0.0 to 1.0) under SCSP
C/O link road from Galwa to village Swana km 0/00 to 2/500 (SH-C/O 900 mm dia hume pipe culvert at RD 0/250, 0/335 and 0/910 and 1/305)
C/O link road harizan Basti Maroa to salehra via harizan basti kangi Dochnu katal salar road in km 0/0 to 5/700) (SH ROFD in km 4/800 to 5/700) 2019-307-488
C/O link road Melta to Badu km 0/0 to 2/00 (SH C/O R/wall at RD 0/300 to 0/325 and Gr-I at 0/0 to 0/500) Under MNP.
Job 2 Microsurfacing on link road from Laluwal to Gondpur via Dulehar km. 0-0 to 6-200 Sub Head Providing and Laying Microsurfacing type-III in km. 0/0 to 6-200 Under Preventive maintenance
Land slide Mitigation Measures for prevention of land slide Disaster on Pucc-Tala Ghar on Link road to Chamba Town to Baloo under Chamba Division (SH Providing Shot Creting at Rd. 0/0 to 0/61.42)
Job 1 Balance work to construction of link road Old Satsang Ghar Lalehri to Bhai Lal Dass Temple via Master Purb Singh House Butt Khurd Karnorota km. 0-0 to 3-450 Under NABARD RIDF-XXIII
R R Damages to RCD road km 0 0 to 92 695 SH Hiring of Tipper for carriage of muck stone in km 71 750 to 92 695 other variosu link road in kawar sub Division
Job 6 Construction of Link road to Raipur Harizan Abadi from Bangarh Nangran road km. 0-0 to 1-500 Sub Head P.L Cement Concrete Pavement in RD. 0-165 to 0-360 with Retaining wall
C/o link road Jia Chowk to Dogra House (Aara Road) Km 0/00 to 0/550 ( SW- C/o Kuhal Crossing at RD 0/080, 0/125, 0/250 and C.C. Pavement on various reaches)
SDP.2024.208, C.o Construction of Jeepable Road from link road Mohalla Kharsian to Mohalla Rajputan House of Smt. Sunita Devi in G.P. Ambota, SH C.O 5.00 Mtr. Span RCC slab culvert and Paver Block Under SDP
Improvemetn of Link road from Dharonk Kainchi to Sehroli Bankuffer roa din K.M. 0/00 to 5/200 , C/o, Wire crate Wall at various damaged sliding RDs between in K.M. 2/00 to 3/00
R/R Damages on link Road from Dharonk Kainchi to Sharoli via Bouri Bankuffer Road Km 0/00 to 5/200 C/o B/wall in Wire in crate at RD 3/685 to 3/735)
CO link road to Mohalla Purohitan Dhamandri SH PL GSB WMM Premix carpet with seal coat from km 0250 to 0290 and Rwall from km 0265 to 0280 and V shape drain from 0190 to 0240
C O link road Tipper to Shallan Kit Randeep Nagar Biharu Dogra pull road km 0 00 to 3 400 SH P L Kharanja stone soling at RD 0 750 to 0 950 and earthen shoulder
Balance work of link road Sh. Pyar Chand House to Sh. Benjhu Ram house Km 0/00 to 0/600 (SW- P/L WBM G-II , G-III, Tarring work and Edge Wall, Grating (MC Deposit)
C/O link road to Darzian Mohalla Ispur G.P. Ispur SH P/L paver at RD 0/075 to 0/175, C/O 1.50 m span slab culvert RCC slab culvert RD 0/005)-under MMSY
C/O Link road to village Panwa to Rister Km 0/0 to 2/0 (SH- C/O Hume pipe culvert alongwith wing wall at RD 0/705 to 0/945 and 1/405) under SCSP
R R Damage to link road from Darasi balasan Chalasar to Jharog kainchi km 0 00 to 4 150 SH C o R wall at Rd 2 510 to 2 531 2 540 to 2 562
C/o Link road Chanour Tiamal Sheetla road to Sarai Raru Khatta Km 0/0 to 0/650 (SH P/L G III Premix carpet seal coat at RD 0/200 to 0/650) under MMGSY
C/o Link road to Gautam Behar in GP Pirsaluhi Km. 0/0 to 1/0(Sh providing and laying cement concrete pavement and road side berms in Km. 0/0 to 0/300) under MMSY
C/o Link road Bathu to Kohli Pir Tippri Km. 0/0 to 0/945 (SH P/l Interlocking concrete block and retaining wall at various location between Km. 0/0 to 0/945) under MMSY.
1)Link road Shivpur to Nawada in km 0/0 to 1/800 2)Link road Gondpur to Amarkot in km 0/0 to 1/500 3)Link road to Phoolpur to Bahadurgarh in km 1/0 to 1/400 4)Link road Haripur to Pattinatha Singh in km 5/0 to 5/760 5)Link road (T-04) t
C/o link road from Piplughat to Village Pathed km. 0/000 to 0/015, C/o link road to village Kyari km. 0/000 to 0/375, C/o link road village Sokhar km. 0/0 to 0/650, C/o link road from Delag to Shivghati km. 0/000 to 1/500, C/o link road Bhindi to
Job 11 A.R and M.O Link road to Village Poona Km 0-0 to 1-200 Sub Head C.O CC Pavement at RD 0-250 to 0-320 and RD 0-405 to 0-510 and C.o Edge wall at RD. 0-250 to 0-320 Job 11 A.R and M.O Link road to Village Poona Km 0-0 to 1-200 Sub Head C.O CC
Providing and laying 30mm thick Bituminous concrete, including profile correction in Km 1/0 to 4/0 and 5/0 to 6/0
(SH- P/L 30mm thick bituminous concrete in km. 12/0 to 13/0 and 13/0 to 14/0).
Providing and laying 30mm thick Bituminous concrete, including profile correction in Km 1/0 to 4/0 and 5/0 to 6/0
Providing and laying 30mm thick Bituminous concrete, including profile correction in Km 1/0 to 4/0 and 5/0 to 6/0
Periodical renewal coat 30mm thick bituminous concrete with paver Karluhi to Bhatolan Padhar km 2000 to 3100 6000 to 7000 HP1202VR0049 and NH70 to Suhin km 000 to 1000 HP1202 VR0050 under PMGSY
Annual Maintenance of koti Satlai road km 0/00 to 15/00 (SH Providing renewal coat of 30mm thick bituminous concrete at km 0/00 to 4/00)(Under AMP 2021-22)(PMGSY)
Providing Periodical Maintanance of Chirgaon Gushali Rohal road km 000 to 7000 SH Providing and laying Pot holes Periodical maintenance at RD 4000 to 6000 with Single side marking retroreflective Under PMGSY Road
Up-gradation of Sarol Masroond Pukhri Road km 0/000 to 34/500 Improvement, C/o Passing Places, Missing CD, Side Drain, Parapets, Pavement and Tarring work under PMGSY Package No.HP-02-02