Loading…
Loading…
10,878 results • Best match
Providing and laying 25mm thick bituminous concrete Km. 3/0 to 4/0) VR-070
(SH- P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between Km 0/800 to 1/700)
(SH- P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 3/00 to 5/00)
Providing and laying 30mm single layer bituminous concrete (HP0404VR006615201-202) km. 0/0 to 1/0 and 1/0 to 1/250
Providing and laying 30mm single layer bituminous concrete (HP0404VR010715305) in km.1/300 to 2/000, 2/000 to 3/000 and 3/000 to 3/770
Under Performance Based Based Maintenance Contract (PBBMC) for the Rural Roads year 2021 22 (Major Head 3054 R and B)(NP) Demand No 10
L-034 under Performance Based Maintenance Contract PBMC for the Rural Roads year 2020-21 Major Head 3054 R B NP Demand No. 10
Restoration of Rain Damages to various roads under Shimla Division No III. (SH - Repair of road side grating and railing at RD 02/740 RD 08/540 on MDR-66.)
Restoration of Rain Damages in Municipal council in ward No-9 Solan. SH- Providing and laying of Pavers and Repair of road near Shishu Park in ward No.-9 Solan.
M/R to GPRA Colony at Prospect Hill Shimla during 2026-27. (SH: Repair of road side area, railing work, chequerred CC tiles, paver blocks and other related miscellaneous works).
Metalling and Tarring and routine maintenance of five year Km. 0/00 to 18/00 Package No. HP-08-277, under PMGSY Stage-II (Batch-II) for the year 2016-17.
Periodic Renewal on Tootru Aloh road road (SH.Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 1/0 to 3/0 VR073 under PMGSY) during the year 2020-21.
Construction of 28.00 mtrs. single span steel truss bridge (Through Type) over Sainj Khad at 9/230 on Sainj Neuli Kartah road under PMGSY-III (Batch-I) Package No.HP-06-162 A.
Construction of Balance work for construction of Mehla Bhagiar Huraid Road km. 0/0 to 11/0 nder PMGSY -1 (batch -I) for the year 2017-18 package No HP-02-244
Periodic Renewal on Chintpurni to Phulwara road (SH.Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 0/0 to 2/500 VR0032 under PMGSY) during the year 2020-21)
Periodic Renewal on Bahrwain to Dehi Pukhar Via karoa Road (Sh. Providing and laying 25mm thick Bituminous Concrete with paver finisher in km 3/0 to 5/0 VR0012, VR0011 Under PMGSY
Construction of 28.00 mtrs. single span steel truss bridge (Through Type) over Sainj Khad at 9/400 on Sainj Neuli Kartah road under PMGSY-III (Batch-I) Package No.HP-06-162 B.
Periodic Renewal on Chalali to Sukhar road (SH.Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 0/0 to 1/0 VR0082 under PMGSY during the year 2020-21.
Job 1 Periodical maintenance on Panjawar Bathri road Punjab Border Km. 0-0 to 9-0 HP1203VR001 . Sub Head , 30mm thick BC, zebra crossing and side lines, cat eyes under PMGSY Head.
PERIODIC RENEWAL ON CHAMUKHA BANGANA ROAD SUB HEAD PROVIDING AND LAYING 30MM THICK BITUMINOUS CONCRETE IN KM 10/0 TO 12/00 VR007113401 VR7113402 UNDER PMGSY INCENTIVE FOR THE YEAR 2019-20
Periodic Renewal of PMGSY Incentive Kut Banker Ther Annual Maintenance Plan for the year 2023/24 SH Providing and laying 30mm single layer bituminous concrete HP0404VR010815302 km 1/0 to 4/460
Periodic Renewal on Jourbar to Jadaman road SH.Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 8.0 to 10.0 VR000613109 and 613110 Under PMGSY during the year 2020-21.
Construction of 110 Mtr span double lane motorable bridge over River Beas at Pandoh on Pandoh Nagdhar road at RD 0/150 (Under PMGSY-III, Batch-I) (Package No. HP-08-570).
Removal of Slips and Surface Dressing unlined surface drain Respectively
Removal of slips, Unlined Surface Drain Maintenance of Earthen Shoulder in various Rds) ( D.C. Deposit)
Change the alignment of gravity line due to widening of road from village Bassi chowk to Sunhet via Muchhkund
Providing and laying Cement Concrete Pavement and construction of road side Drain in Km 3/780 to 3/950 and 4/218 to 4/320
CONSTRUCTION OF ROAD MAIN ROAD BHAJOLU TO HOUSE OF RAVI KANT AND PATHAK SH WALL DRAIN PROVIDING AND LAYING CULVERT
Construction of road leading to Mehta Niwas to Chandal Niwas in ward No 29 Vikasnagar SH Construction of Retaining wall
Improvement of road from Sansarpur Terrace to Riri Kuthera Km. 0/0 to 3/0 under Industrial Corridor (Bharwain Chintpurni Kandrori Damtal road Km. 29/560 to 32/560) (SH.Providing and laying cement concrete paver block at RD 2/300 to 2/436)
VKV/2024/259 C/O Geometrical Improvement of road from main road to Village Rakharara HPPWD Division Kotla Behar and Sub Division Dada Siba(SH C/o R/Wall from RD 0/460 to 0/478 with CC and Wire crate) Deposit Work
Under PMGSY-II 2019-2020
Under PMGSY -II 2019-20
Performance Based Financial incentive 2019 20 during the year 2021 22 for link road to Village Dhakriyana Rawan Ki Johari to Dhakriyana in Km 0 00 to 2 300 SH Providing and Laying Renewal coat by Providing 30mm thick Bituminous Concrete in Km 0 00
Repair of restoration of rain damages of internal road from H O Sh. Rakesh Khanna to H O Sh. Ritesh Dubey Green Avenue colony Rakkar Tehsil and Distt. Una (SH PL interlocking paver at RD.0.0 to 0.060) (Deposit work)
Metaling and tarring 30mm bituminous concrete and C/O U-shape drain n Km 0/000 to 0/090
C/o Damaged road and side drain
SH- P/L 25mm thick Mix Seal Surfacing with paver finisher in km. 1/000 to 2/000)
SH- P/L 25mm thick Mix Seal Surfacing with paver finisher in km. 0/000 to 1/000)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetera including five-year routine maintenance)
P/L 30mm Bituminous concrete, Thermoplastic paint strip in km 0/0 to 1/0
SH- P/L 25mm thick Mix Seal Surfacing with paver finisher in km. 2/000 to 3/000)
Formation Cutting, C/o Passing Places, R/wall, B/wall, Side Drain, Parapets, plastic cell filled C.C. pavement and road signages etcetra including five year routine maintenance
SH Formation Cutting Construction of Passing Places Side Drain Parapets Cross drainage Metalling Tarring work etc. including five year routine maintenance
Formation Cutting, C/o Passing Places, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance
Balance Work estimate for the Construction of Link Road From Sanawar Gate to Mandudhar Via Shillar Pathia From Km. 0/000 To Km. 3/500.(SH Formation Cutting, C/o R/walls and B/walls, C/o Cross Drainage, P and L, GSB,WBM G-II and G-III, OGPC and Seal C
RRD on link road from Patlikuhal Naggar
CO link road from Marhi Chhanbalti castle
C O link road to village Maching
C O link road to village Maching