Loading…
Loading…
10,878 results • Best match
Periodic Renewal on Chambi to Swana road SH.-Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 2.0 to 4.0 VR008813105 and 8813106 Under PMGSY during the year 2020-21.
Periodic Renewal on Jourbar to Jadaman road SH.Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 5.0 to 8.0 VR000613106, 613107 and 613108 Under PMGSY during the year 2020-21.
Annual Maintenance Plan for the year 2024-2025 (PMGSY Roads) on Magzine Tarsooh road Km. 0/0 to 1/960 (SH- Providing and laying 25mm thick Mix seal surfacing Type A (VR-0231)
Periodical Maintenance on Sansoi to Kashna road Km 0.0 to 6.600 SH Providing and laying 30 mm thick BC in Km. 3.00 to 6.600 under AMP for the year 2026-27 PMGSY Roads
Upgradation of Nishani to Pali to Prantla road Km.0.000 to 10.695 SH R.O.F.D. protection works GSB GII GIII DBM BC CC pavement and road side furniture, dumping structure Under PMGSY III HP06351
C/O Building portion, Septic tank, rain water harvesting tank site development and approach road.
SH Providing and laying CC Paver Block on approach road Km0/110 to 0/470
Construction of retaining wall for protection of rising main and approach road Job No 2
C/O R/Wall, P/F interlocking paver for court yard and approach road etc.
Providing and laying CC paver Block on approach road Km.0/110 to 0/400)
SH Distempering painting repair of toilet paver block on approach road and other repair work
C/o of Building Portion, Water Supply and Sanitary Installation,Rain harversting system,Septic tank,Site development, providing and laying cobble stone paver in parking,Exit approach road, Construction of boundary wall and installation of Lift
(SH- Providing and laying 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 0/00 to 1/600)
(SH- P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 0/00 to 1/500)
C/O EDGE WALLS OF APPROACHES OF BRIDGE OVER DUGH KHAD IN WARD NO. 05 BADUKHAR SIDE
P/L 900mm dia RCC Hume Pipe culvert at Rd 0/263, U-Shape drain at Rd 0/260 to0/335, Edge wall at Rd 0/290 to 0/330, R/wall at Rd 0/267 to 0/277
Providing and laying G-I,G-II Mettaling Tarring at km. 0/00 to 1/270).(SCSP
PCC R/Wall at RD 0/850 to 0/870 and edge Wall at RD 0/845 to 0/870, P/L GSB,WMM M/T work in km 0/750 to 1/200).
at Rd 0/489 to 0/506 C/O U-shape Drain at Rd 0/065 to 0/360 V-shape Drain at Rd 0/366 to 0/510
Providing and Laying G-I,G-III, Tarring and C/o V-Shape drain at Rd. 1/00 to 2/00).(Under working programme 2024-25).
C.o 900 mm dia RCC hum pipe culvert at Rd 2.165 and 2.465
Laying of 90 to 45mm stone agg. G-I.
Balance work of P/.L Cement concrete pavement at rd. 0/730 to 0/760, GSB, WMM,Tarring in km. 0/760 to 1/00, R/wall at Rd. 1/030 to 1/090 C/O V-shape drain
ROFD in widening at various Rds, C/o Protection works and Hume pipe culvert at various Rds) Under Working Programme).
SH F C 5 7 mtr. wide road at Rd. 1.660 to 1.975
Change the alignment of gravity line due to widening of road from village Lower Badhal to Main storage tank Bassi
R R Damages to road Kimoli Khad to Thebi titar chhounta km 0 0 3 00 SH Widening of road at RD 0 210 0 255 0 360 0 490 0 690 0 735 1 095 1 125 C O B Wall at RD 0 045 0 080 R Wall at RD 0 0 0 095 C O R Wall at RD 0
ROFD, CD work, retaining wall, Gabion walls, Metaling Tarring, Panelled Cement Concrete Pavement, construction of road side drains, Parapets, Crash Barriers, Road Safety Measures
CO link road Kaloh Bumbloo to ward No3 up to NH03 km 000 to 1500 in GP Kaloh SH CO 4 mtr span slab culvert at RD 0390 PL GSB MT km 000 to 0190 under MMGSY
6. Annual Periodical Maintenance Plan for the year 2024-25 On Link road to village Nalda Km 0/0 to 3/0 (SH Providing and Laying 20mm thick seal surfacing in Km.0/0 to 2/0).
Construction of link road from Barot to Barot Ballla KM 0.0 to 1.0 SH PL GSB at RD 0.560 to 0.960 wearing GII 0.560 to 0.760 and Cement Concrete pavement at RD 0.610 to 0.760 under SCDP
Job 3 Construction of link road from Panjawar Bathri Road to Shamhsnghat Manuwal km.0-0 to 1-200 Sub Head Providing and Laying 60mm thick paver block in km.0-0 to 0-425 Under MMGSY
Construction of link road from Behi to Badal KM 0.0 to 1.300 SH Construction of 8.00mtr. Span RCC Culvert at RD 1.140 with wing walls at RD 1.130 to 1.135 1.145 to 1.150 including both side approaches
Improvement and Widening of link road to Village Kanai Km 0.00 to 2.00 SH- F.C 5.7 mtr wide road from RD 0.945 to 1.240 and C.o R.wall in wire crate at RD 1.028 to 1.037 Under BADP.
C/O link road from Changadhar to Lower Dadesh Km 0/000 to 0/510 SH C/O R/Wall at Rd0/000 to 0/008 0/390 to 0/405 and 0/490 to 0/510
Repair and restoration work on link road to village mohalla Tiprian Km 0/0 to 6/650 (SH P/L CC pavement 1 1.53 and R/wall in RD 0/495 to 0/685 under PDNA 2023
Const of link road to vill Khayali km 000 to 4250 SH Const of 900mm dia Hume pipe culvert NP2 along with Retaining walls at RD 2065 and CC pavement at RD 2085 to 2115 under SCCP
Job 8 Link road to Harijan Basti Kuthar Khurd Tehsil and Distt.Una at Km 0-0 to 1-500 G.P.Kuthar Khurd Sub Head C.O CC Pavement and drain at RD. 0-0 to 0-073 (Under MMSY
Construction of Link road from Gangtoli to Kumarli via Koilu more Jokla S.C Basti Bikhyat Km 0/0 to 5/555(SH- Formation cutting 5/7mtrs wide road from Km 1/375 to 2/220)Under SCSP
Const of and MT link road to vill Maloun Awarla via Mahashyan Basti in GP Gindpur Maloun km 000 to 2370 SH const of Retaining wall at RD 0250 to 0260 LHS 0320 to 0350 under MNP
Repair and maintenance and improvement of link road to village Puruwala Kanshipur Km. 0/00 to 1/00. (SH- P/L 900 mm dia NP2 hume pipe and interlocking tiles from RD 0/375 to 0/870).
3. Annual Periodical Maintenance Plan for the year 2024-25 On Link road to village Sindhwari Km 0/0 to 2/660 (SH Providing and Laying 20mm thick seal surfacing in Km.0/0 to 2/0).
M/T of link road from Forest Depot Pooh to Danmochhe Km. 0/00 to 0/650 (SH- Providing and laying G-I, G-II, G-III and Premix carpet from Km 0/00 to 0/650
Job 4 Periodical Maintenance on link road from Gondpur Baliwal road to Peerthan km. 1-0 to 3-050 VR126 Sub Head Patch work, 30 mm thick BC, Zebra crossing and side lines therein Under State Head
Annual Maintenance Plan on link road to village Gehri km 0/00 to 0/800 village road for the year 2026-27 SH Providing and laying 30mm thick Bituminous Concrete in km 0/00 to 0/800
Periodical Renewal for the year 2024-25 on Link road NMT (SH-25) to Kadh, (SH. Providing and laying 25mm thick Bituminous Concrete with filler and waste plastic additive in Km. 0/0 to 1/680) VR0053
A/R and M/O link road Kharkoli to Unger Kando Road km. 0/00 to 3/705 (SH C/O PCC R/Wall from km. 0/00 to 0/020 and 1/045 to 1/065)
Construction of link road Rod Jaman to Lubhana Basti Thoda Km. 0/0 to 1/500 (SH- Formation cutting in Km. 0/500 to 1/0 and cross drainage work in Km. 0/0 to 1/0).