Loading…
Loading…
10,878 results • Best match
Annual Maintenance of koti Piran road km 0/00 to 28/020 (SH Providing renewal coat of 30 mm thick bituminous concrete at km. 12/00 to 15/00)(Under PMGSY Incentive 2020-2021
Periodical Renewal coat with 25 mm thick bituminous concrete with paver, thermoplastic line zebra crossing on T04 to upper Behar Jaswan Km. 2000 to 2930 HP1202 VR 0032 under PMGSY for the year 202425
Periodical renewal coat 30mm thick bituminous concrete with paver NH70 to village Dukki km 1000 to 4000 including hot applied thermoplastic paint cat eyes and V shape drain at various RDs HP1202VR0045 under PMGSY
Job 5 Periodical maintenance of Panjawar bathri road km.10-0 to 12-0 Sub Head Patch work,30mm thick bituminous concrete ,zebra crossing in km. 10-0 to 12-0 VR001 Under PMGSY
Periodic Renewal on Bagli to Karoa Khurd road (SH.Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 0/0 to 1/500 VR-251 under PMGSY) during the year 2020-21.
Periodic Renewal on Chambi to Swana road SH.Providing and laying 30mm thick Bituminous concrete with paver finisher in Km 0.0 to 2.0 VR008813101, 8813102, 8813103 and 8813104 Under PMGSY during the year 2020-21.
HP03157 under PMGSY II 2019-20
Providing the storage facility for Division and Sub-Division-V office in the office of EE-I Shimla, Kennedy Cottage. Chargeable to: contingencies of Construction of 2 Blocks of Type-II (16 Nos.) Residential Qtrs. & Development work including approach road...
Provision of M.S. railings on valley side of road and repair of existing side drains on internal road of IIAS from Boileauganj gate to Gorkha gate 2. SH: Provision of railing from Gorkha gate to 28 family line and related miscellaneous works.
Provision of M.S. railing on valley side of road and repair of existing side drains on internal road of IIAS from Boileauganj gate to Gorkha gate 2. SH: Provision of railing from Boileauganj gate to 28 family line and related miscellaneous works.
Periodical Maintenance on Patali Kuhal Naggar link road
RRD on link road from Patlikuhal Naggar road
C O Moterable link road to village Pool
C O Moterable link road to village Pool
AR and MO link road to village Vashishat
RRD on link road from Bashing to Kangti
C O link road from Bastori to Sari
RRD on link road from Bashing to Kangti
CO link road from Patlikuhal to Bari Renkhru
RRD on link road Jagatsukh to Bhanara road
RRD on link road from Patlikuhal to Naggar
SH Construction of approaches in Gulling Side Retaining wall in km 0.393 to 0.398.50 and 0.401.50 to 0.419.50 Downstream and 3.00 span RCC slab type culvert at km 0.399.00.
/o FC, hume pipe culvert, RCC slab culvert,R/wall, W/wall and B/Wall etc.
SH Co 900mm dia RCC Hume Pipe Culvert at Rd 0 018 and 0 100
SH Construction of approaches in Gulling Side Retaining wall in km 0.372 to 0.369.50 and 0.419.50 to 0.399.50 Up- stream and 2.50 m Span RCC slab type Culvert at km 0.338.10.
Reconstruction of R/Wall
Construction of PCC B/wall at RD-0/005 to 0/050 (For road) and 0/00 to 0/015 (Behind building) and C/O PCC Retaining wall at RD-0/00 to 010 and 0/150 to 0/165).(Deposit)
Construction of RCC U Shape drain Km.0/00 to 0/210 and Construction of unlined drain Km.0/00 to 0/180).(Deposit)
road works
road works
road works
road works
road works
SH Providing and Laying RCC pavement in the approach road from HRTC workshop to Bus Stand
C/o R/Wall, Boundary Wall, Approach road and C/o U-Shape drain).Balance Work
SH C.O approach road and removal of road side slip at various RDs across the approach
SH Construction of Protection works to approach road of GSSS Playground Boys and its widening works
Construction of steel iron entry gate and bench park at starting point of approach road D.W.
SH Providing and fixing roofing, sanitary installation, approach road, stone masonry, paver block and flooring 2.
P/L 80mm paver tiles for road construction to Ward No 1, Bypass road Baddi
C.O AND M.T LINK ROAD FROM DDM SCHOLL TO PARMAR SCHOOL IN G.P KAILASH NAGAR FROM KM 0.0 TO 3.00 UNDER MNP SUB HEAD PROVIDING SERVICE OF 1 NOS CELRK FOR THE MONTH FEBRUARY 2025 TO JULY 2025
Annual Maintenance Plan on link road Vijaypur to Bhardwaj Basti km 0/00 to 1/00 village road for the year 2026-27 SH Providing and laying 30mm thick Bituminous Concrete in km 0/00 to 1/00
M/T on link road from village Kewang to Chhoker Km. 0/0 to 2/0. (SH-Providing and laying premix carpet 20 mm thickness and seal coat including correction layer at Km. 0/0 to 1/0.
Metalling and Tarring of link road from Chungling Chowk to Kuto Kanda Km. 0/00 to 2/795 in District Kinnaur (HP) (SH- Providing and laying Grading 2 layer and Tarring at RD. 0/00 to 1/00
Balance work of link road from Nangal ground to baroa via Vardhman factory. (RD 0/00 to 1/00), C/o Balance work of road from NH-105 Jhiriwala to village Dhundali Km 0/500 to 3/500.
5. Annual Periodical Maintenance Plan for the year 2024-25 On Link road from Thorang to Gondhla Km 0/0 to 1/500 (SH Providing and Laying 20mm thick seal surfacing in Km.0/0 to 1/500).
Construction of link road to Village Bhalyani Km. 0/0 to 2/00 under NABARD SH Formation cutting, Retaining wall, Breast wall, cross drainage work, unlined drain, wire crates for dumping, Km. Stone and Setting out RIDF-XXVIII.
Job 10 Link road from Chetran Umrali road to Barhe mohalla of village Dulehar km.0-0 to 0-360 Sub Head Providing and Laying embankment, WMM and BC at RD 0-0 to 0-360 Under MMGSY