Loading…
Loading…
10,878 results • Best match
Restoration of damages due to laying of MDPE Natural Gas pipe line on link road to village Poona km.0.0 to 0.800 (SH P L interlocking cement concrete paver blocks at RD.0.500 to 0.620 (Under BPCL deposit)
Restoration of rain damages on Link road to Rohtan up to Chatnol Dogri Km 0.0 to 6.0 SH CO R.wall at RD 3.305 to 3.320,3.670 to 3.685 and Breast wall in wire crate at RD 3.230 to 3.247.50
C/O Link road from Rungchampo to Sharakpi via Thoroge in G.P. Kalpa Km. 0/00 to 1/500 (SH- Providing and laying G-III and premix carpet from Km. 0/00 to 1/500 and protection work
Restoration of rain damages on NMT to Malkada km 010 to 1120 and link road to village Dhussara SH Providing and laying 80mm thick CC interlocking paver block km 0250 to 0500 and 2850 to 2852 Under PDNA2023
Const of link road to village Bhuran in GP Jole km 000 to 0200 SH ROFD CD Works at km 0010 and 0100 Protection work and 80mm thick Paver Block between km 000 to 0200 against telecom deposit
Repair and Restoration of Rain Damages link road Bari Mohalla Deoli to Connect Ghanari Nangal Jarialan in GP Deoli Km 000 to 1800 SH CO wire crate wall and Filling in Km 100 to 1035 Under PDNA 2023
Job 2 Restoration of rain damages of link road to Village Bhoolgarh RD 0-0 to 2-600. Sub Head C.O CC Pavement RD 0-650 to 1-800 and Retaining Wall RD 0-675 to 0-700
Co Link road from Sunhet Nangal to Jabbar to seul Km 00 to 1 250 SH formation cutting 5 7 mtr. Wide, construction of 900mm dia hume pipe culvert at RD 0 915 and 0 975 under OTMNP
Construction of link road from Village Ghuggar to Ravinder Sood House Nallah Har Ravidas Mandir Ghogra Colony (SW - P/L Interlocking concrete Block Pavement from RD 0/00 to 0/050 and 0/214 to 0/394 (Deposit)
C/O link road to Village Dhar Brahmna km 0/0 to 0/850 (SH C/O NP2 Pipe MM dia HPC at RD 0/310 and Gr-II at Km 0/0 to 0/850) Under MNP.
R/R Damages on link road Changer Gumara to Nisal Road km 0/000 to 4/100 (SH P/L wire crate in R/wall at Rd 1/240 to 1/255 ) (Under PDNA) (LAT 76.823424 LOG 31.100442)
Repair and Restoration of Rain Damages link road from Madan Lal Ex- Pardhan Roshan Lal Di Hatti to Fish Farm Deoli Km 0000 to 2050 SH Construction of Retaining Wall between RD 0300 to 0330 Under PDNA 2023
M/T on link road Tailing Yuramurti to Ratil road Km. 0/0 to 10/0. (SH- Providing and laying Premix carpet 20 mm thickness with seal coat including correction layer at Km 7/00 to 8/0.
C/o M/able Link road from Helipad Sach to Village Kuthal Km 0/0 to 6/500 SH Formation cutting and protection work to protect private house between at RD 2/0/370 to 2/0/520
Repair and restoration of link road from new Victoria bridge via Treasury office upto schedule cast (SC) Basti km. 0/00 to 0/410. (SH- Providing and laying bituminous macadam and track coat in various reaches) M.C. Deposit
Restoration of rain damages on link road from Chhughera Kandi road to Sadoon to Khaji Dharni in Tehsil Baroh Distt Kangra (HP) (SH-Construction of retaining wall at RD 0/405 to 0/430 (R/S) Ht. 3.04m)
Job 1 Restoration and rain damages to link road from Jhalera Bridge to Una via Lower Lal Singi km. 0-0 to 4-340 Sub Head P.L C.C. Pavement in km. 4-140 to 4-320 Deposit work
CO Ambulance link road from Bhukkar Chowk to village colony Diyungli Km. 0.0 to 2.0 SH C.O Hume pipe culvert 900 mm dia four row at RD 0.0 to 0.015.50 and C.C pavement at RD 0.0 to 0.125
RRD on link road from Dhandal to Kolka Km. 0/00 to 2/100 (SH- C/O B/wall at Rd 0/00 to 0/015,0/120 to 0/135 AND 0/720 to 0/735) PDNA-2023
C/o Link road from main road Balghar to village Kalehar Km. 0/0 to 0/750 (SH Interlocking concrete block, breast wall and retaining wall at various location between Km. 0/0 to 0/750) under MMSY.
Construction of link road towards Govt. Degree College at Ghandalwin km 0/00 to 0/500 SH Construction of Retaining wall at RD 0/130 to 0/145 and at RD 0/145 to 0/152.50 MMSY work
Restoration of rain damages on link road vijaypur Amarpur Hadsar Dahad Jaman Ghumarwin via Rewal Tal km 0/00 to 0/500 SH C/o of Cement Concrete pavement at km 0/350 to 0/470 under CRF
C/o link road Speru to Goarth Km 0/00 to 2/00 (SW- G-II, G-III, U-Shape drain, CC Pavement and Tarring work Km 1/740 to 2/000, 0/600 to 1/093) (PDNA)
Preparation Detailed Project Report for Construction of Link road from Sasan Village to Pekhubela from Km. 0.00 to Km. 2.040 Under NABARD-RIDF in District Una (SH Preparation of layout plan as per land acquisition, Preparation of DPR
Construction of link road from Kutla to Parahu to H/Basti Dharar km. 0/0 to 2/500 (SH- P/L WBM G-II and 20mm thick premix carpet in Km. 0/600 to 1/600) Under SCDP.
C/o link road to the house of Sh.Subhash Chand W.No.9 Ispur GP Ispur SH P/L Paver block and C/o R/wall-RHS, B/wall-LHS at RD 0/00 to 0/112 under MMSY
C/o Sangnali to upper chalhar via tharu road km. 0/00 to 0/800 (SH- C/O R/wall at Rd 0/070 to 0/085 on Link road juction starts from RD 0/600) 5054 RB
Providing Periodical maintenance on link road Tutupani Kuthari khalgar deoti road km 0 00 to 19 680 SH Providing and laying pot holes Periodical maintenance at Rd 14 00 to 19 680 Under AMP 2026-27 VR Road
Const of MT link road Chadda Mohalla in GP Deoli km 000 to 1130 SH Const of 900mm dia RCC Hume pipe culvert at RD 0800 1030 Causeway at RD 0050 and 0330 and Retaining walls at various RDs
PROVIDING AND LAYING BITUMINOUS CONCRETE 30MM THICK IN KM. 0/0 TO 1/00, 0/0 TO 1/900, 0/0 TO 4/0, 0/0 TO 2/0, 0/0 TO 0/700 RESPECTIVELY WITH PAVER FINISHER) DRRP NO. HP-03-05 VR0028, VR0022, VR0033, VR0131, VR0109.
(SH- P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 0/00 TO 1/000 USING PLASTIC)
Providing and laying 30mm single layer bituminous concrete (HP0404VR012815303 km. 1/0 to 2/0
(SH- P/L 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 1/000 to 1/500)
Construction of road from Kasba Kotla to Koi Km 0.0 to 2.600 SH. R.wall at various RDs in between Km 1.180 to 1.425 and PCC drain at RD 1.180 to 1.380) RHS Under industrial Corridor
Providing and laying Tack coat and Bituminous Concrete in Km 5/0 to 7/0
Formation Cutting, C/o Passing Places, Side Drain, Parapets, plastic cell filled C.C. pavement Metalling and Tarring work and road signages etcetra including five year routine maintenance
SH F/C 5/7 mtr. Wide km 0/720 to 1/00
Formation Cutting 5/7 mtrs wide road in Km0/000 to 0/285
C/o wire crate R/wall, P/L 900mm dia R.C.C hume pipe culvert etc/ (under MMGSY)
(SH- P/L 30mm thick bituminous concrete in km. 0/0 to 1/0, 1/0 to 2/0 and 2/0 to 2/300).
Construction of road from Dhamandri Bus Stand to Gurudwara and Abadiyan GP Dhamandri Distt. Una (HP) (KM 0/00 to 0/950)
Construction of road from Jonaji road towards Dhali Nadoh village in ward no 8. Solan Cutting ,R.Wall at RD 0.00 to 0.07
Construction of road Hanogi to Sehanu Saloi GP Kholanal in km. 0.0 to 2.500 SH C.O R.walls at RD 0.720 to 0.732.
Raising the level and construction of road from Amravati towards Phase 3 Chowk R/D 0/720 to 0/900 mtr , Baddi
Construction of road 80mm paver block ISI Mark in Ward No 7 opp. Sangam Hotel tpwards the building of Ashok Kumar, Baddi
Raising the level and construction of road from Amravati towards Phase 3 Chowk R/D 0/360 to 0/540 mtr , Baddi
Construction of road paver block from vill. Chatterpur border near H/O aman in Ward No. 9 Mehatpur basdehra Distt. Una (H.P
Restoration of rain damages (SH Removal of slips Construction of road side drain and Construction of edging etc ) in ward No 20
Raising the level and construction of road from Amravati towards Phase 3 Chowk R/D 0/0 to 0/180 mtr, Baddi
Construction of road leading to PWD road Ghatru to Hemant Niwas in ward No 26 Panthaghati (SH Construction of Retaining wall etc)