Loading…
Loading…
10,878 results • Best match
Construction of link road Simbal Bara to Harizan Basti Khairni km 0/0 to 5/0. (SH- Providing and Laying G.S.B. G-II and G-III at various RDs between km 2/020 to 3/050) under SCSP.
Restoration of rain damages on link road to Bela Siyasu Km 0/0 to 9/00 (SH-Construction of retaining wall at RD 4/090 to 4/105, 4/107 to 4/122, 4/130 to 4/150)
C.o ambulance road from Link road to Dam Basti Naker Khad GP Shivnath Tehsil Dehra SH Construction of cement concrete pavement at RD 0.00 to 0.069 and V-shape drain at RD. 0.00 to 0.063.SDF.2023.425 Deposit
C/O Link road from Khadura to Tirsuling in G.P. Khadura (SH- C/ R/Wall in G.I. wire crate at RD 0/450 to 0/480 and C/O B/Wall at RD 0/450 to 0/505
C/O Link road from Rungchampo to Sharakpi via Thoroge in G.P. Kalpa Km. 0/00 to 1/500 (SH- Providing and laying G-III and premix carpet from Km. 0/00 to 1/500 and protection work
Construction of Link road Harijan Basti Chalet Nichla upto Kabirpanthian Mohalla Km 000 to 1600 SH Co Solid Causeway at RD 0060 to 0070 and CC pavement between Km 000 to 0060 and 0070 to 0500 Under SCCP
C/o link road from Ambika Mata Temple road to Kunnu Bowali Km. 0/00 to 0/300 under MNP. (SH- F/c 5/7 mtrs wide road and CD works in Km. 0/00 to 0/300).
Construction MT of Link road from UAM road to Malanger via Dugar GhattiPlataRakkarKushan Bramman Tarkhanka and Bhaleti Bhugrian Dohgi km 0000 to 5805 under NABARD RIDFXXVSH Co 57 mtr wide Formation cutting and filling Retaining wall Cross Drainage
M/T on link road to Village Thalak kaknola Km. 0/00 to 3/00 (SH P/L WBM G-1 G-ll, and M/T along with road side drain in Km. 2/00 to 3/00)
C/O Link road from Rungchampo to Sharakpi via Thoroge in G.P. Kalpa Km. 0/00 to 1/500 (SH- Providing and laying G-III and premix carpet from Km. 0/00 to 1/500 and protection work
Construction MT of Link road from UAM road to Malanger via Dugar GhattiPlataRakkarKushan Bramman Tarkhanka and Bhaleti Bhugrian Dohgi km 0000 to 5805 under NABARD RIDFXXVSH Co 57 mtr wide Formation cutting and filling Retaining wall Cross Drainage
Repair and restoration work on link road village Khad Mohalla Sonkiyan Km 0/0 to 3/00 PDNA SH C/o R/wall and repair of pot holes in RD 2/200 to 2/300 under PDNA 2023
Const of link road from Bharwain to Aranwal Km 000 to 5000 SH ROFD between Km 1300 to 1405 and Const of Retaining walls at RD 1490 to 1511 1542 to 1568 and 1581 to 1595 Under MMGSY
Restoration of rain damages on link road Dhingu to Sukri km 0/00 to 1/600 SH C/o R/wall at Rd 1/295 to 1/308 and Edge Wall at RD 1/377 to 1/400
Construction of CD and M/T on link road Village Hathna km 0/00 to 1/405(SH P/L WBM G-II, G-III and 20mm thick PMC in km. 0/00 to 1/405 )Under MNP
C/o link road to village Thurva to Harizan Basti Karotiwala in G.P. Dharot Km. 0/0 to 1/100 (SH- Cross drainage work, P/L soiling and M/T work in Km. 0/0 to 1/100).
C/o link road Bhatpura to Tapa connect Joggi Basti including Bridge over Soul Nallah Km 0/00 to 0/500 (SW- C/o 4.00 mtr. Span Culvert at RD 0/010 with both side approaches etc (SCSP)
Restoration of rain damages on link road from Busal Nariyalkar Sippanpatt Km 0/000 to 4/425 in Tehsil Baroh Distt Kangra (HP) (SH-Construction of Breast wall at RD 0/960 to 0/975 (Ht 2.44 (LHS)
CO Link road from Bangana Tathoon road to Bandu Brahmana. SH CO 900mm dia Hume pipe Culvert in km 0100 and 0185 alongwith wing wall and PL GSB WMM and MT in km 0/000 to 0/500
Construction of link road Boh to Hambar Km. 0/0 to 1/500 (SH- Formation cutting 5/7 meter wide Km. 0/0 to 1/165 and construction of R/wall at RD 1/0 to 1/015)
Metalling and Tarring of link road from Chungling Chowk to Kuto Kanda Km. 0/00 to 2/795 in District Kinnaur (HP) (SH- Providing and laying Grading 2 layer and Tarring at RD. 1/00 to 2/00
C/O Link road Bambyar Badyar to Galanaghat km 0/0 to 3/160 (SH C/O 900 mm dia hume pipe culvert along with wing walls at RD 0/050, 0/165, 0/420 and 0/725).
Repair and maintenance of link road Nanahar to Kaloli Mandir Km 0/000 to 0/500 and Dharaman to Gwaltikkar via Rajehar road Km 8/000 to 8/300 (SH- P/L G-III and Patch Work (MMSRRY)
Job 1 Construction of link road Harizan Basti Raipur Bare in Village Raipur Nichla km. 0-0 to 0-800 Sub Head C.O Retaining wall, P.L Earth filling, GSB in km. 0-0 to 0-540 Under SCCP
C O Link road tamshal to kharla km 0 00 to 5 00 SH F C 5 7 mtr wide road at Rd 0 840 to 0 975 2 00 to 2 015 2 150 to 2 300
Construction of Balance work link road from Punjab Boundary to village Dehni Nange Thakur up to Barota Dabala in Km. 0/0 to 6/765 (SH- Providing and laying premix carpet in Km. 0/0 to 1/0).
C/O link road Panighat to karol km 0/0 to 0/800 (SH ROFD work at RD 0/0 to 0/500, 900mm dia HPC at RD 0/210 and 0/400) Under MNP 2017-307-455).
C/O Link Road Village Mandbag to Chushoti Km. 0/00 to 3/500(SH - Jeepable to motorable road from RD. 0/435 to 1/675 and C/O 900mm dia HPC at Rd. 0/705) under SCSP
Const of link road Jallow Di Bar to Kunet Rattian via Behmba in GP Bhaderkali km 000 to 5000 SH Providing and laying GSB WMM and Tarring including Const of shoulders between RD 2650 to 3650 under MNP
Job 1 Periodical Maintenance on Link road to Village Jongpur from Gondpur Baliwal road km. 0-0 to 1-0 VR159 Sub Head Patch work, 30 mm thick BC, Zebra crossing and side lines therein Under State Head
Repair and Restoration of Rain Damages link road from Madan Lal Ex Pardhan Roshan Lal Di Hatti to Fish Farm Deoll km 000 to 2050 SH Construction of Retaining wall between RD 0400 to 0425 Under PDNA 2023
C/o of other metaling of link road culvert on road which is leading from takrehra village Rachera house of Ranbir Singh SH Providing and laying cement concrete pavement in km 0/00 to 0/036 Deposit works
Construction of link road from Jasssur Gangath Indora road to Bajigar Mohalla Kharol km 0.00 to 0.800 SH Formation cutting in km 0.350 to 0.750 LHS and Construction of C.C Pavement at RD 0.00 to 0.142 Depsoit work.
R/R damages on link road to Marighat Dinger Mathanan road Km 0/0 to 22/0 (SH- C/O R/wall at RD 11/060 to 11/075 and 11/390 to 11/405) under PDNA 2023
C/o link road from Baliana Lamber Basti to Suked Km. 0/0 to 2/0 SH P/L GSB WBM-G-II G-III Premix carpet Seal coat from RD 0/765 to 1/015 under MMGSY
C O Link Road to Village Larot via Bangla Km 0 00 to 0 860 SH CO RWall in PCC 136 and wire Crate at RD 0810 to 0840 BWall in Wire Crate at RD 0660 to 0680
M/T on link Road Harijan Basti Kuffer Dader koli ka bag Km .0/00 to 9/00 (SH -P/L WBM Grading-l, Grading-ll and M/T in Km. 0/00 to 1/00)Under SCSP
CONSTRUCTION OF LINK ROAD GARLI ALOH CHAMBIYALAN TO VIILAGE RAJIANA KM 0.0 TO 2.0 SUBHEAD G-II G-11 AND TARRING IN KM 0.090 TO 0.225 0.585 TO 0.970 AND PROVIDING AND LAYING CC PAVEMENT 0.0 TO 0.090
Special Repair of 86.40 Rmt Span suspension Bridge over river beas on Pandoh Shivavadhar link road Distt Mandi SUB HEAD Dismantling of old bridge components and P/F of new bridge material for 36.40 Rmt including welding works.
R/R Damages on Link road Changer Gumara to Nisal Road km 0/00 to 4/100 (SH P/L wire crate in R/wall at Rd 0/870 to 0/745) Under PDNA)LAT 76.819964 LOG 31.100797)
Job 2 Construction of link road Nagnoli to Harizan basti via Mohalla Brahmana, Gujran Chooti khad km..0-0 to 3-345 Sub Head Providing and laying CC Pavement at RD.0-916 to 1-191 Under SCCP
Job 10 Restoration of rain damage on link road to Village Upper Arniala via Bazigar Mohalla Km 0-0 to 3-0 Sub Head C.O Retaining wall at RD. 0-0 to 0020. G.P. Arniala Upper Deposit Work
RR Damage to link road HB Dayarmoli km 000 to 1500 SH RR RWall at RD 0690 to 0704 RWall in PCC 148 at RD 0195 to 0218 FC 57 mtrs wide road at RD 0915 to 1090
Const of link road to village Chalaul Behar km 000 to 1500 SH Const of 900mm dia RCC hume pipe culvert at RD 0110 and 0290 and PL GSB WMM and Tarring between km 0500 to 1000under MNP
M/T link road from Pancha to Patka via Panva Km. 0/00 to 6/165 (SH- Providing and laying G-I, G-III and Premix carpet from Km 3/00 to 3/665 and providing protection work
Construction of Link road from Sathore to Harijan Basti Parwa Lawagu Shakholi road Km 0/0 to 4/00(SH- Construction of 2mtrs Box Cell Culvert at RD 0//250 to 0/460,0/780, 0/985) under SCSP
R R Damage to link road to Jabbal km 0 00 to 6 00 SH P L 80mm thick Paver block at Rd 4 010 to 4 065 and B wall at Rd 4 00 to 4 038
Repair Restoration on link road to village Kharoh km 000 to 3000 SH Const of Retaining wall at RD 0260 to 0274 point 50 1600 to 1610point 50 and UShape drain at RD 1550 to 1670 DC Deposit
C/o Link road Karluhi Athwan Km. 0/0 to 4/600 (SH. C/o RCC slab culvert on Nallah RHS along the road at RD 2/030 and R/wall culvert approach on road Harizan Basti Athwan.
C/O Link Road Village Sail Km. 0/0 to 2/400 (Sh- P/LWBM Grading-l, Grading- II ,M/T, C/O road side Drain in km. 1/800 to 2/400 and C/O essential Parapets).