Loading…
Loading…
10,878 results • Best match
Construction of road from Karian bridge to village Tadgram Km. 0/0 to 1/200 Formation cutting, R/wall and B/wall
Raising the level and construction of road from Amravati towards Phase 3 Chowk R/D 0/540 to 0/720 mtr , Baddi
Construction of road and road side drain from Main road to M.S. Vision Industries at Ind. Area Kala Amb, Distt. Sirmour (HP).
Construction of road protection Retaining wall along-side Sukhna Nala infront Dushera grround to manage the flood in heavy rain MC Parwanoo
Raising the level and construction of road from Amravati towards Phase 3 Chowk R/D 0/180 to 0/360 mtr , Baddi
Restoration of rain damages (SH Removal of slips Construction of road side drain and Construction of edging etc ) in ward No 19
SRMO road from PWD road to pump house at I.A Nagri, Distt. Kangra (HP). (SH- Construction of road with interlocking pavers tile)
Construction of MT on link road Repoh Piplu to Sundhari Karap Gondpur Baroh Basuni Mairi Gurudwara link road from km 000 to 10665
Construction of MT link road to Harijan Basti Repoh to Kuchha via Palahar km 000 to 3000 SH PL GSB WMM Tarring km 1500 to 1930 1970 to 2000 and CO CC pavement 1930 to 1970 under SCCP
Balance work Construction of link road Tanda Pantehar towards Sh. Tanuj Sharma and other houses (SW- P/L CC work at RD 0/00 to 0/042, 0/043 to 0/080 andtowards Narender Sharma house (MC Deposit)
Annual Maintenance Plan for the year 2025-26 MDR Road on Ghumarwin to Talai road km 0/00 to 4/00 SH Providing and laying 25mm thick Bituminous Concrete including repair of road
Repair of road from Banal road to Shiv mandir in Jhikla Moch G.P Sunet Under MLALAD Deposit work SH Providing patch work on various depression and pot holes in Km. 0.0 to 0.400
Special repair of Mule road from Malkota to Bharmani Mata road Km 0/00 to 2/220 ( SH Repair of road at various RD i.e. R/Wall C.C foot path and railing work.
Repair of road from Chakwari to Railway Line Toward Barchh Near Rajeshwer etc ke Ghar tak SH Construction of Cement Concrete Pavement at RD 13.135 to 13.240 and 13.390 to 13.510 under NDRF
Periodic Maintenance of Aweri to Lachhun under (PMGSY Road) (HP 0411 VR002412301) (Revalidation 2022-23) (SH- Providing and laying G-II, Tack coat, Premix carpet with seal coat in Km 0/00 to 1/150)
Upgradation of Raja Ka Talab to Panjasra road km 0.0 to 1.700 Under PMGSY Batch 1 2018 .19 World Bank RRP II Package No. HP.04.269 SH Routine Maintenance of road after completion of work
Annual Maintenance Plan for the year 2020-2021 (PMGSY) on Laraghat to Bholi road Km. 3/0 to 4/0 and 5/0 to 6/0 (SH- Providing and laying 30mm thick bituminous concert) VR0032
Annual Maintenance Plan for the year 2024-25 on Panjot Bagwara road (VR-090) km. 0-0 to 1-00 and 3-00 to 4-00 (SH Providing and laying 25mm thick BC) (under PMGSY
Periodic maintenance of Nihargalwa to Barana road (HP0408VR0091) under AMP (PMGSY road) for the year 2022-23 in Distt Kangra (HP) (SH-Providing and laying Bituminous concrete pavement at Km 3/000 to 4/000)
Annual Maintenance Plan for the year 2022-2023 (PMGSY Roads) Laraghat to Bholi Road Km 0/0 to 3/00 ,8/00 to 10/500 (SH- Providing and laying 30mm thick bituminous concrete (VR -0032)
Periodic maintenance of Nihargalwa to Barana road (HP0408VR0091) under AMP (PMGSY road) for the year 2022-23 in Distt Kangra (HP) (SH-Providing and laying Bituminous concrete pavement at Km 2/000 to 3/000)
Periodic maintenance of Samloti to Sarotari road (HP0408VR0003) under AMP (PMGSY road) for the year 2022-23 in Distt Kangra (HP) (SH-Providing and laying Bituminous concrete pavement at Km 0/000 to 1/000)
Periodic maintenance of Mangrella to Har road (HP0408VR0063) under AMP (PMGSY road) for the year 2022-23 in Distt Kangra (HP) (SH-Providing and laying Bituminous concrete pavement at Km 0/000 to 1/000)
Periodic maintenance of Nihargalwa to Barana road (HP0408VR0091) under AMP (PMGSY road) for the year 2022-23 in Distt Kangra (HP) (SH-Providing and laying Bituminous concrete pavement at Km 0/000 to 1/000)
Periodic maintenance of Nihargalwa to Barana road (HP0408VR0091) under AMP (PMGSY road) for the year 2022-23 in Distt Kangra (HP) (SH-Providing and laying Bituminous concrete pavement at Km 4/000 to 5/000)
Periodic maintenance of Mangrella to Har road (HP0408VR0063) under AMP (PMGSY road) for the year 2022-23 in Distt Kangra (HP) (SH-Providing and laying Bituminous concrete pavement at Km 4/000 to 5/530)
Periodic Renewal of Fatehpur Deothi Road Under Annual Maintenance Plan of PMGSY ROADS for the year 2024.25 SH Providing and laying 25mm thick Mix Seal Surfacing Type A from Km. 9.0 to 12.0 3.00 kms.
Periodic maintenance of Nihargalwa to Barana road (HP0408VR0091) under AMP (PMGSY road) for the year 2022-23 in Distt Kangra (HP) (SH-Providing and laying Bituminous concrete pavement at Km 1/000 to 2/000)
ROFD C/o retaining walls breast walls Crate walls C/O missing CD work P/L GSB MT CC pavement road side drain road side parapets W Metal Beam crash barriers PMGSY information board sign boards kilometer stones 200mtr RD stones etc i/c five year maint
ROFD C/o R/Wall B/Wall Crate walls C/o missing CD work P/L GSB M/T CC pavement road side drain road side parapets W-Metal Beam crash barriers PMGSY information board sign boards kilometer stones 200mtr. RD stones etc. i/c five year routine maint.
C/o PCC Wall, Drains, Septic Tank, Steel railings and road Work at Market Yard at Shilaroo, Distt. Shimla, H.P.
Installation of 16-00 meters high mast light system near at kuhani mourh/Junction point at link road from Shri Naina Devi ji Ghuwandal chowk to Kollan Wala Toba for Temple Trust Shri Naina Devi Ji, District Bilaspur, (HP).
Improvement of black spot on link road to Villages Shiaso Km. 0/00 to 5/200 (SH- Providing and laying of hot applied thermoplastic road marking paint on edge line both side from RD. 0/00 to 5/200
RESTORATION RAIN DAMAGES LINK ROAD FROM PRIMARY SCHOOL TI UPPER KURU KM 0.0 TO 1.200 SUB HEAD P.L CMENT CONCRETE PAVEMENT AT RD 0.330 TO 0.370 AND 0.560 TO 0.660 AND C.O SOLID CAUSEWAY AT RD 0.470 TO 0.490
Job 4 Restoration of rain damages on link road to Village Kuthar Beet from Gondpur Baliwal road Tehsil Haroli Distt. Una km. 0-0 to 2-500 Sub Head C.O 6.00 mtr. span RCC Culvert at RD 0-800
Construction of link road from Sera to Chhanwar including bridge over Dharoon khad in G.P Sera Thana in Distt. Kangra (Himachal Pradesh). (SH Construction of Sub-Structure, Super Structure for 25.00 mtr. span foot bridge alongwith both side approache
Improvement of Link road to Tharolla Dhalona in K.M. 0/00 to 1/800, ROFD from 0/035 to 0/055 and C/o Culvert at R.D. 0/090, 0/180 and 0/350 with both side wing wall
R/R damages to link road from Paonta Sahib to Rampurghat road km. 0/0 to 5/0 (SH-P/L Interlocked tiles 80mm.thick from RD. 1/040 to 1/140 Right side berms portion)(Under Digging charges Deposit).
R R Damages to Link road Jiskoon km 0 00 to 8 00 SH Hiring of Tipper for carriage of muck Stone filling of gravel material in various portion in Kawar Sub Division Portion 4 00 to 8 00
Restoration of rain damages on link road from Bharwain to Aranwal Km 000 to 5000 SH Const of Retaining wall at RD 1700 to 1715 LHS RD 1697 to 1720 RHS and HP Culvert at RD 2055 Against PDNA2023
C/O Link road Nohradhar to Galion km. 0/00 to 3/130 (SH C/O 900mm dia RCC HPC at RD. 2/700 and P/L WBM G-I from km. 2/00 to 3/00 ). Under MNP
Job 5 Construction of link road Nagnoli Harijan Basti to Rajputtan Mohalla km. 0-0 to 0-350 Sub Head P.L G.S.B. WMM, M-25 in RD 0-0 to 0-040, 0-070 to 0-350 UNDER MMGSY
Job 3 Construction of link road to Village Baliwal Mohalla. Harijan, Nayian, Rajputtan and Jattan 0-0 to 1-465 Sub Head Providing and Laying WMM, Prime coat, and BC at km 0-0 to 1-400 Under OTMNP
Repair and Restoration of Rain Damages on Link road to Village Tatehra in GP Tatehra km 000 to 2250 SH Re laying Metaling and Tarring due to road crust damage and Drain Km 0200 to 0500 Under PDNA 2023
Restoration of rain damages (PDNA) on link road from Kankani to Pakche in G.P. Nako Km. 0/00 to 2/110 (SH- Providing and laying Grading-I, Grading-II and Grading-III from Km. 0/00 to 2/00
C/O link road to Village Nasrali km 0/0 to 5/00 (SH Soling in km 1/00 to 3/00 and C/O 900mm dia hume pipe culvert in Km 2/00 to 3/00) Under SCCP
Job 1 Restoration of rain damaged on link road to Village Lamlehra from Jankaur 0-0 to 4-040. Sub Head FC, C.o Retaining wall, Breast wall and P.L C.C Pavement in approaches km 0-070 to 0-110
Annual Maintenance Plan for the year 2022-23 On link road Karyas to Ghangeet road Km 0/0 to 2/300 SH Providing and Laying 20mm thick premix carpet in Km 2/00 to 3/00 Road Number HP0205VR02407103
Construction of Link road from village Ratwa to kuna via Tholla Kulyari jarna Balaina km 0/00 to 6/500 (SH C/O Hume pipe culvert at RD. 1/810,1/930,2/490,2/515, 4/585 and 5/105) MNP
Job 2 Restoration of rain damages to link road from Jhalera Swan bridge to Una via Lower Lalsingi km. 0-0 to 4-340 Sub Head C.O Retaining wall towards Swan Nadi at RD 0-0 to 0-016