Loading…
Loading…
10,878 results • Best match
Const of and MT link road Harijan Basti Lower Lohara km 000 to 1250 SH CO 900mm dia RCC HP culvert at RD 0210 and 0430 and PL GSB WMM and Tarring between km 0050 to 0550 under SCCP
C/o Dharti Link road in K.M. 0/00 to 0/380, F/C in 5/7 mtr. wide road at R.D. 0/00 to 0/150 and C/o, B/Wall at R.D. 0/020 to 0/045
Construction of link road from NH-88 paisa Chowk to Harizan Basti Balugaloa in Distt Kangra (HP) Under SCSP Head (SH-Providing and laying WBM grading-III and cement concrete pavement road at RD 1/020 to 1/170).
A/R M/O link road from Nirmand to Johad via Ambika Mata Temple at Nirmand km. 0/00 to 4/435. (SH- C/O PCC drain between km. 0/00 to 1/495) under deposit of Telecom department)
Job 10 Construction of Bye pass under bridge to connect link road from Galua to Upper Arniala and IPH Rest House Una Sub Head P.L C.C Pavement RD 0-0 to 0-090 Km including Retaining Wall Under MMSY
Construction of link road from NH-303 to Lahru wala temple in Gram Panchayat Jhikali kothi in Distt Kangra (HP) MMSY Head (SH-Providing and laying Grading-III and cement concrete pavement in Km 0/125 to 0/255).
CO link road from LR to Mohalla Choi Bala 4 ward No 7 Village Kaloh in Gram Panchayat Kaloh SH Construction of 275 500 mtr wide Jeepable road Cutting Filling between Km 000 to 0240 Under MMSY 2025 26
Restoration of rain damages on link road Jole to Kaint via Bhooran , Amroh, Dhrun,Kuhroo ,Sanjot road at Km. 0/0 to 14/255 (SH. C/O Retaining wall at RD 13/700 to 13/713) Against DC Deposit.
Const of link road Kalu Di Bar Bhararbar road to Mohalla Wadle Dhiman Basti and Mahashian Basti km 000 to 2050 SH Const of Retaining wall at RD 0280 to 0302 LHS and 0345 to 0360 LHS under SCCP
Construction of Link road to village Ghutnu Km. 0/0 to 1/600 (SH Construction of PCC Retaining wall at RD 1/045 to 1/095 and Construction of PCC Breast wall at Rd. 1/020 to 1/070)
C/o link road Sangla Mandir to Sangla Bridge Km 0/00 to 0/350 (Sub Head- P/L 80 mm thick C.C paver block and M.S Grating over Drains at RD 0/00 to 0/350 ) Under BADP
C/O Link road Plau to Bharan Via Kathli road KM 0/00 to 6/50 (SH ROFD in KM 1/00 to 2/00 and Formation cutting 5/7 mtr wide in KM 2/00 to 2/510).
Const of link road Kaloh Bumbloo to ward No3 up to NH03 km 00 to 1500 in GP Kaloh SH Const of 4 mtr span slab culvert at RD 0390 PL GSB MT km 000 to 0190 under MMGSY
Job 5 Construction of link road to Raipur Harijan abadi from Bangarh Nangran road km.0-0 to 1-500 Sub Head Construction of Cement Concrete Pavement and interlocking paver block km.0-0 to 0-551 Under OTMNP
C.O LINK ROAD RAKKAR SHANTLA FROM HOUSE OF PARDHAN SANSAR CHAND VIA KOUD BASTI SITPAK NIHARI ROAD I.C BRIDGE KM 0.0 TO 3.0 SUB HEAD C.O 8.00 METER SPAN RCC SLAB VULVERT AT RD 0.810 I.C BOTH SIDE APPROACHES
Job 2 Construction of link road from Bazigiran Mohalla to Harizan Basti via Desi Moh. 0-0 to 2-0 Sub Head P./L GSB, WMM, BC and side drain at RD. 0-0 to 0-230 Under OTMNP
Construction of link road from Mohalla Gujjran Pukhru to Swan RiverTatha Wad from km 000 to 4580 SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and Vshape drain etc including five
Const and MT link road from Panjoa to Kuthiari road Km 000 to 0981 SH Const of 900mm dia RCC hume pipe culvert at RD 0840 and PL GSB WMM and tarring between Km 0345 to 0981 Under MMGSY
Job 9 Construction of link road from Jankour Lamlehra road to Bhandari Mohalla G.P. Jankour FC 5-7 mtr. wide road, C.O Retaining Wall, Breast wall and P.L CC Pavement in Km. 0-0 to 0-110 Under MMSY
Annual Maintenance Plan for the year 2022-23 On link road Karyas to Ghangeet road Km 0/0 to 2/300 SH Providing and Laying 20mm thick premix carpet in Km 1/00 to 2/00 Road Number HP0205VR02407102
CO link road Chil Kawali to Mohalla Kabirpantian and Harian Basti in GP Ghangret km 000 to 3800 SH CO Formation cutting between km 0225 to 0960 and CO Retaining wall in km 3225 to 3270 LHS under SCCP
Construction of link road to village Sanaogi Km 0/000 to 5/000 SH Construction of PCC R/Wall at various RDs and construction of 900mm dia Hume Pipe Culvert at Rd 2/305 3/030 and 3/315
C/o link road Khad Samethan Neem Wala Baba Mandir to Harijan Basti Chokata in G.P. tarsooh Km. 0/0 to 3/0 (SH- Formation cutting including Retaining wall and C.D. work in Km. 1/0 to 2/0).
Annual Maintenance Plan for the year 2022-23 On link road Mahalu Nallah to Chowki Bazar Km 0/0 to 1/00 SH Providing and Laying 20mm thick premix carpet in Km 0/00 1/00 Road Number HP0205VR005307302
C.O 20.00 METER BRIDGE OVER JADLA KHAD AT RD 3.900 ON LINK ROAD JADLA PRATHAM TO NARA DUKKI KM 0.0 TO 8.0 SUB HEAD P.L FILTER MEDIA DRAINGES SPOUTS STRIP SEAL DRAIN RD 0.0 TO 0.200 UNDER VKVNY MLALAD
c.O LINK ROAD FROM MAIN ROAD TO SASNA BASTI GP SAKRI KM 0.0 TO 1.00 SUB HEAD FORMATION CUTTING PROVIDING AND LAYING GSB g.ii AND c.O HUME PIPE CULVERT WITH WING WALL AT RD 0.095 TO 0.450 AND 0.760
Construction of link road to village Kohla Plasari Km 0/0 to 1/300 (SH P/L GSB,Wet Mix Macadam and 25mm thick BC in km 0/0 to 1/300 and Retaining wall, V-Shape drain etc.).
Job 2 Improvement and widening and Construction of link road from NMT road to Mohlla Brahmna, Harizan Mohalla to Shamshanghat in Village Bharolian Khurd and from Una Santokhgarh road to Shamshanghat Jankour to Sunehra Bridge via Saini Mohalla fro
Job 9 Link road Butt Kalan to Harijan basti km. 0-0 to 1-400 Sub Head Providing and Laying GSB , wet mix and BC and Hume Pipe culvert 900mm dia RD.0-0 to 0-360 Under MMGSY
Job 1 Improvement and widening and Construction of link road from NMT road to Mohlla Brahmna, Harizan Mohalla to Shamshanghat in Village Bharolian Khurd and from Una Santokhgarh road to Shamshanghat Jankour to Sunehra Bridge via Saini Mohalla fro
Construction of link road from Rajpur to Dighali km. 0/0 to 1/300(SH-Providing and laying WBM G-11, G-111, bituminous concrete 30mm thick and road marking in km. 0/0 to 1/050)under SCSP
C/o link road from Kaloha to Kakad Badh Harizan Basti Km. 0/0 to 1/000 SH P/L GSB WBM-G-II G-III Premix carpet Seal coat from RD 0/398 to 0/650 under MMGSY
Annual preventive maintenance of roads using micro surfacing technology SH Providing and laying typeIII 6 8mm thick micro surfacing layer using specialized micro surfacing paver on link road Baba Pindi Ashram km 000 to 0500 Kuthiari Thathal km 0500
Annual Maintenance Plan on link road Bachari Bhatoli Matyal Dehlwin road km 0/00 to 6/460 village road for the year 2026-27 SH Providing and laying 30mm thick Bituminous Concrete in km 4/00 to 6/460
R/R Damages on Link road from Tahu Pump house to Rehaldhar via Mehta Nagar K.M. 0/00 to 4/200, C/o, R/Wall and B/Wall at various RDS between in K.M. 0/00 to 2/00
Job 3 Periodical maintenance of link road Ispur to Pandoga via Kyarian km. 0-0 to 2-180 Sub Head Patch work , 30mm thick bituminous concrete, zebra crossing in km. 0-0 to 2-180 VR150 Under State Head
Construction of Link road harizan basti shaya Chabron km 0/00 to 0/550 (SHConstruction of PCC R/wall at Rd 0/023 to 0/033, C/o edge wall at Rd 0/00 to 0/023 and parapets).
Tender for renewal and replacement of existing tubelight fixtures with LED street light fixtures from Bassi P H to Link Road Bassi, Zero point Shanan HPSEBL Colony Shanan Civil Mtc Sub Division surrounding area at Shanan under BPHD JNR.
R R damages to link road village Kiterwari km 0 00 to 2 300 SH B Wall in R R Masonary at RD 1 015 to 1 045 R Wall in Masonary at Rd 0 00 to 0 015
C/o link road from Kulani to Spedu including bridge over Awa Khad at RD 11/300 (SW - C/o Existing bridge approaches, drain, parapets and M/T work towards Kulani side at RD 11/197 to 11/430).
Improvement of Black spot on link road from Kalpa to Roghi Km. 0/00 to 6/365 (SH- P/F W-metal beam crash barrier in essential reaches from Km. 4/500 to 5/00 (Under road safety funds)
R/R Damages on Link road from Matlu Sarah Baghal Roa dto Village Lower Sarah in K.M. 0/00 to 0/500, C/o, R/Wall at R.D. 0/265 to 0/272 and 0/275 to 0/285
R R Damages to Link road Jiskoon km 0 00 to 8 00 SH Hiring of Tipper for carriage of muck Stone filling of gravel material in various portion in kawar Sub Division Portion 0 00 to 4 00
Installation of steel crash barrier on link road from Gattadhar to village Sangna km. 0/00 to 3/690 (SH P/F W Metal beam crash barrier at RD. 1/700 to 1/850 along with 25mtr edge wall)
C/o link road Manjher to village Panga Km. 0/0 to 2/0 (SH- C/o Retaining wall, C/o 900mm dia hume pipe culvert and C/o 3.00 meter span R.C.C. slab culvert at RD 0/480).
A/R and M/O of link road from NH-07 to village Ballu wala km. 0/0 to 1/0(SH- P/L balance ISI marked interlocking concrete paver tiles 80mm. From RD 0/0 to 0/170).
Job 4 Construction of link road from Harijan Basti Nagnoli via Rajputan Mohalla, Tehsil Haroli District Una km. 0-0 to 1-500 Sub Head FC, CD, GSB, WMM and BC RD 0-600 to 0-960 Under OTMNP
Repair and Restoration of Rain Damages Link Road Chintpurni Amlehar Road via Dhalwari Km 8500 to 12000 SH Strengthening of Damaged Existing Road Providing laying GSB WMM and 30mm thick Bituminous Concrete from RD 11200 to 12000 Under PDNA
R/R damages on link road Chhachi kanani bayla Chamara Bisiya phadi chikni road in km 0/0 to 10/00 (SH C/o 900 mm dai NP2 HPC at Rd 8/940, 9/00,9/300 and 9/500).
Job 4 Construction of Link road from Jongpur Chowk to GSSS Gondpur Bulla Tehsil Haroli Distt. Una Sub Head C.O 80mm thick. Paver block in RD. 0-020 to 0-170, U- shape drain and edge wall Under MMGSY