Loading…
Loading…
19,094 results • Best match
1/ Improvement of road from Railway Station to Zorawar Singh Chowk, Jammu 2/ Improvement of road from Ambedkar Chowk to MAM College, Jammu (Under Action Plan 2022-23 for Potholes Free Roads Programme)Under Action Plan 2022-23 for Potholes Free Roads
Construction of road from link road from Jambo Kote to Kotli road to Mohalla Kalki by way of construction of R wall Providing and laying 4 no 1.00 mtr dia HPC In km 1st Rd 0 to 500 under state plan 2nd call
Construction of road incl. designing of RCC deep drain, culvert and R/wall on link road to Christian Colony Kot Bhalwal from the house of Sh. Hans Raj to Main J-A road near Central Jail, Kot Bhalwal incl. Kot to Kaink link.
Balance work for construction of road from Christ School Muradpur to link road near Govt. High School by way of Construction of R B wall , pacca drain WMM 100 mm thick, 25 mm thick OGPC in km 1st Rd 0to Km 3rd RD1000.
ARM of Internal Road for the year 2021 22 at 47th Bn ITB Police Samba J K
PROVN OF INTERNAL ROAD AT RLT VIHAR AT P 39 TO P 43 UNDER GE NORTH AKHNOOR
PROVN OF INTERNAL ROAD AND OTHER CONNECTED WORKS OF INF UNIT AT RAJOURI UNDER GE 862 EWS
1/ Improvement / up-gradation of link road to Kotli Rayian 2/ Improvement / up-gradation of link road from Shahidi Gate Chowk to Kotli Rayian in stretches (Under City and Town Programme for the year
1/ Improvement / up-gradation of link road to Gujjar Basti at Magowali 2/ Improvement / up-gradation of link road to Kotli Muffi to Biaspur (Under City and Town Programme for the year 2022-23)
1/ Construction and up-gradation of link road Extension to Main road Bermini. 2/ Improvement and up-gradation of link road from Girls Madrassa to City Hospital Bathindi Under C and T 2022-23
STAGE CONTRACT FOR Bheja to Thanalla link road, Katyara to Kansar via Haddal, Katyara to Kansar via Upper Haddal, Katyara to Kansar via House of Rattan Lal, Katyara to Sherekhi via Dhanwah link road
Construction of roads Chak Bhalwal pond to Langer Mohalla Ramdassia Bhagtian Mohalla Under City and Town Programme 2022-23
Construction of roads in Lane No. 27-A at Greater Kailash Jammu (Part-B) (Under Capex Budget) (2nd Call)
Construction of link road from Soker Gali to PMGSY road Panihad via High School Soker Gali by way of earth work in cutting, construction of R B wall 12 no, 1.00 mtr dia HP Culvert providing and laying WBM Gr-II 150 mm thick in two layers 75 mm thick
Balance work for Construction of road from Bhargi to Kunan JK04-282, Phase-X, Stage-I, Balance work for Constt and Maintt of road from L034-Bhargi to Kunan, JK04-502, PMGSY Regular Batch-I 2018-19, Block Bhallessa, District Doda
Construction of road from PMGSY road to Jabra via High School Bachianwalii Dachanwali Surankote by way of balance Earth work in Cutting,Cross Drainage,Walling and Providing and Laying 75mm thick WBM Grade-II in Km 1st and Km 2nd.
Construction of road from PMGSY road to jabra via H/S Bachanwali Dachian wali by way of construction of 2 meter span RCC Culvert and P/L Laying of WBM Grade-II,P/L Hume pipe 900mm dia.tehsil surankote distt poonch
Construction of road from Middle School Dhand Sayeedan to Mohalla Gahi Sanai in Km 2nd RD 0 -1000 upto PMGSY road by way of Earth Work in Cutting Walling ,Providing and Laying 900mm dia Hume Pipe Culvert in different location
Construction of road from PMGSY road Dalehar to Mukhayala Zairat, Length 2.00 Kms by way of balance Earth Work in Cutting, Walling, X-Drainage, Protection Works 150 mm thick WBM Gr-II,75mm thick WBM Gr-III 25mm thick OGPC.
Repair of Road from main road to Bai Nalla w.no.03
Repair of Road with P/Work Ex-Sarpanch Mohalla W.no 07
Repair of Road Jinda Peer to Shoket Mohalla W No 04
Permanent restoration of PMGSY Road from L023- Dumber to Hawal District Kishtwar under UT Capex
Restoration work of damage slided portion of Adit-III approach road at various RD (as mentioned in Tender Documents) at Sewa-II Power Station (CW-708)
Construction of 1x30M Span Trussed Girder Bridge across Grumtoo Nallah on Mahipora Rekhama Road, PMGSY-III (Batch-II, 2023-24) Package No. JK183008B1, Stage-LSB, Block Pombay, PMGSY Division, Kulgam.
Upgradation and Maintenance of Road MRL03-Kremshore to Hayatpora PMGSY III (Batch-III, 2023-24), Stage-U, Length 5.60Km, Carriageway Width 3.75 Mtrs. Package No JK02-3027, PMGSY Division Budgam.
Construction of 1x62M Span Trussed Girder Bridge on Check Noorpora to Tral via Batagund, PMGSY-III (Batch-II, 2023-24) Package No. JK103014B1, Stage-LSB, Block Tral, PMGSY Division, Pulwama.
Upgradation and Maintenance of Road from MRL04-Devpora To Hirpora Road Stage U, length 4.2 Kms, PMGSY III, Package No JK22-3007(Cold Mix Technology), PMGSY-III, Batch-I, Pulwama.
Up-Gradation and Maintenance of Road from MRL01- Degree College Baramulla to Gohan, Waste Plastic, Length 4.9 km PMGSY Baramulla, PMGSY-III, Batch-I 2022-23, Package No.JK03-3017. (Baramulla)
Upgradation and Maintenance of road from T01-Checknorpora to Tral via Batagund, PMGSY-III (Batch-I, 2023-24), Stage U, Length 11.00 Km. Package No JK10-3014, PMGSY Division Pulwama.
Supply, Carriage up to site, Installation, testing and Commissioning for Shifting of HT/LT line along with Substation at Uri-Sultandaki to Dahanimar PMGSY Road of ESD Mohura under PMGSY
Gurah Pattan road Repair of Pot Holes
Raipur Domana road Repair of Pot Holes
Macadamization of internal roads Kalakote Town. Road from main road to Mukhtar Mohalla ward no. 07 and Road from main road to Gian Mohalla ward no .05 under Cties and town roads.
Up-gradation of Internal roads by way of providing and laying Wet Mix Macadam, 50mm thick Bituminous Macadam and 25mm thick premix carpet at Industrial Estate SICOP Kathua 2 (Three Years Maintenance).
CONSTRUCTION OF 40 FT. WIDE INTERNAL ROADS (L7, R4 AND R5) BY WAY OF EARTHWORK IN CUTTING AND FILLING, LAYING WBM GARDE IST AND IIND AT VILLAGE KRANDI, IGC-SAMBA, PHASE-III.
C/o Infrastructure for Transit Camp at BSF Campus, Samba under SHQ, BSF, Indreshwar Nagar. SH: - Development of work (Internal roads, Tubewell with pump House, Substation building, Sentry Posts & DG set etc).
1.Seri to Chattra, JK04295, Length 6.00 Kms. 2.Dhrudu to Manwa JK04526, Length 9.12 Kms. 3.Dhrudu to Gutassa, JK04-296 Length 7.75 Km. 4.Km 4th of Beeru Bhasti to Dugli JK04222 Length 11.00 Kms 5.L039-Bhara Mandir Mohalla to Godha JK04-521
Please Refer BOQ
please refer BOQ
please refer BOQ
Restoration of roads under the Jurisdiction of PMGSY Division Kathua on Emergency basis 2023-24 G3
Restoration of roads under the Jurisdiction of PMGSY Division Kathua on Emergency basis 2023-24 G4
CONSTRUCTION OF ROAD FROM MAIN ROAD TO LALYAL CAMP TO MASTER USMAN KHAN HOUSE VIA KAMAL SHARMA HOUSE TO BABU RAM SHARMA and ALLIED LINKS PANCHAYAT KANACHAK UNDER SAMRIDHI SEEMA YOJANA FOR THE YEAR 2023-24
Please refer in BOQ
Macadamization of roads (i) Link road from Ratnal village to Shamshan Ghat (ii) Link road from Main road to Mohalla Sher Singh at Chak Umara (Under City and Town Programme for the year 2023-24)
Providing and laying wet mix macadam, BM, 25mm thick semi dense bituminous concrete and 25mm thick open graded premix carpet on link road J-A road to Seri Panditan, Bhalwal link road and Amb road
Constt. fo drain from main chowk wno 3 upto link road near H/O harbans lal, Chajju ram and others constt. of C path from link road to H/o Balbir and others wno 2
Up-gradation / Improvement of road in Noorabad Narwal Bala (Part-II) Under Non Plan for the year 2025-26