Loading…
Loading…
4,481 results • Best match
RWD/RANCHI/22/ STPKG/05/2023-24 Strengthening of Road From (1)Lota to Goradih via Nagedih (Length-9.10 Km.) (2) Patka to Damandih (Length-1.8 Km.) (3) Kariadih to Aral Nawadih (Length-1.975 Km.) (4) Koiladih to Ajaygarh (Length-3.60 Km.)
RWD/HAZ/STPKG/04/2023-24 Strengthening of Road from (i) N.H.-33 to Dangi via Sijhua (ii) T06 Rud More to Gwal Tola (iii) Babhania to Karan Tand (iv) Kutumsukari More to Gunja (v) NH-33 Nagwa to Ichak Police Station
RWD/HAZ/STPKG/06/2023-24 Strengthening of Road from (i) P.W.D. Road Salhara to P.W.D. Road Partapur(ii) Katamba to Parsatari(iii) Suji to Daihar(iv) P.W.D. Road Salhara to P.W.D. Road Darjichak(v) P.W.D. Road Karipahari to P.W.D. Road Brinda
RWD/RANCHI/ 36/STPKG/22/ 2024-25 Strengthening of Road from (1)Kathitanr Katharkocha Chowk to Kathitanr Chowk via Sabji Dukan Sisha Dukan (Length-0.30 Km.) (2) Ratu REO Road Chhotka Tikra to Deshwali via Gobind Oraon House and Ita Bhatta (Length-1.1
RWD/RANCHI/32/ STPKG/03/2023-24 Strengthening of Road from (1) Soso Rahe Road to Bundiyaru Nischitpur via Darha (Length-4.20 Km.) (2) Nawadih to Basantpur via Pogra (Length-3.10 Km.) (3) Sataki Road Nawatoli to Serengdih via Ramdera (Length-4.80 Km.
Consultancy Services for DPR Preparation for Widening and Strengthening of Road 2-lane with paved shoulders in km 12.00 to 36.100 (Govindpur to Dumri) of NH-143B under NH Division, Gumla in the State of Jharkhand including LAP, USP, FDP and RRP.
Strengthening of Road from (i) L024 - P.W.D. Road to Baghmanwa (L-2.900 Km.), (ii) Pipra to Nimiya (L-1.800 Km.), (iii) L035 - P.W.D. Road to Tona (L-3.300 Km.), (iv) L075 - P.M.G.S.Y. Road Suludag to Lohdaga (L-5.500 Km.), (v) Kulhi to Panchayat
RWD/GARHWA/30/SRPKG-01/,Specail Repair of Road from Pakage No-- RWD/GARHWA/36/SRPKG-01/2022-23 NH-343 MUKHYA PATH KHARDIHA TO TENUDIH (L-7.500Km.)
Strengthening of Road from Panduwa to Kodankel (L-15.100 Km.)
11/2022-23/RWD/CHATRA Construction of Road From Guriya Main Road to Siddiki Panchayat Sachiwalaya under DMFT
SPL REPAIRS OF INTERNAL ROAD DISTANCE 2 KM WITHIN REGT OF MED REGT AT NAMKUM POCKET AND SPECIAL REPAIR TO RAOD, PATH, PAVER BLOCK NEAR AGE B/R-II OFFICE UNDER GE RANCHI
Making of approach road from starting point to OB dump area via working place with the help of cutting and filling by JCB as well as tree felling by marking of 1225 nos. of tree for approved scheme of Chapapur-II OC Patch.
Hiring of 01 no. 12 KL capacity water sprinkling from pit office to Pindarkom main Road including approach Road to 03 nos. Road weighbridges and Tasatbar Petrol pump, Balumath to Murpa more, Balumath for 01 (one)year i.e 300 days Excluding Rainy sea
Restoration work of Foundation Guard Wall and Approach Road in Hazaribag Barkagaon Tandwa Khelari Bijupara SH-07 Rd HL Bridges Situated in ch 9065 ch 28238 and ch-2045 Under RCD Road Division Hazaribag For the Yr-2025-26 Under Non Plan)
Providing a retaining wall for cable trench, strengthening of earthing system of ATR and SST, erection of surge arrestor (132 kV) and VCB (SST) and approach road for repair and maintenance of 220/132 kV, 150 MVA ATRs at GSS, Adityapur-II (RCP)
Const. of bamboo made temporary 5 nos Toilet set with 1leach pit covering by plastic sheet etc. leak proof and approach road by suitable distance all complete for whole mela period in kanwariya Path during Shrawani Mela 2026 Gr. No. S Mela 1
Construction of Road from Barki Koiya Dobaat to Bheda Nadi Pool (L-1.630Km.)
Construction of Road from Chari Rajrappa Road Durga Mandir to Haribandh . (L-1.800Km.)
Construction of Road from Vill. Sankha, Main Road to Last Village Portion via Mandir
Diversion of 6point 6KV overhead line feeder No3 to feeding power to HEMM machine due to dumping of OB and haul road widening of new patch due to safety purpose and replacing of damaged poles and conductor of 440V overhead line of khodovally coloney
01. Strengthening of road from T04 Majhgaon to Barakadal via Gamhariya, Ichamara, Nauka. (Length 8.825 K.M.), 02. Strengthening of road from Kesargadia to Rajabasa. (Length 12.40 K.M.)
Construction of plinth protection around, development work, widening of road with paver blocks laying and other miscellaneous work at various location of Golf Colony, DGMS Dhanbad, Jharkhand during fy 2024 25. SH Construction of boundary walls and installation of concertina coil fencing over the old boundary wall at DGMS, Hirapur, Dhanbad
RWD/GARHWA/21/2022-23, Special Repair of Road from PWD PATH TILDAG KARBLAH TO BAR TOLA MUKHY NAHAR VIA PARIHARA DURGA MANDIR (L-4.50Km.)
Construction of Road from H.O. Vikash Bediya Near Kewattola to Kharajara (L-1.880Km.)
Construction of Road from Atka Bazartand to Damowa (L-2.650 Km.), RWD/GIRIDIH/51/ 2023-24
Construction of road from Pratappur Charak More to Nimtanr Madhurasha via Pandeydih Bejrabad (L-3.70 Km.)
Construction of Road from Tetulia -2, Murlidih Bazar to 5 No. Samshan Ghat (L-2.008 Km.)
Construction of Road from Ashanbona Talitola to Masaniya More via Ashanbona Pradhan Tola (L 2.380 Km.)
RWD/RANCHI/ 59/ 2024-25 Construction of Road from Kotha to Ulatu via Salpatan (Length2.105 Km.)
RWD/EE/GODDA/16/2023-24, Construction of Road from Banjhi to Nawadih (L-1.600 Km.)
RWD/CHATRA/158/ 2024-25 Construction of Road from NAGUDWA NALA TO HARGADWA (L-0.800 Km.)
RWD/EE/GODDA/28/2024-25, Construction of Road from Chanaichak to Sonour (L-4.650 Km.)
Construction of road at Dumaria village play ground to culvert under Rajmahal Area (Length-600 meters).
RWD/JAMSHEDPUR/06/2021-22, Construction of road from Jagannathpur to Bengal Border. (Length- 1.10 K.M.)
RWD/CHAKRADHARPUR/08/2024-25 Construction of Road from Petedhipa Chowk to Bondih (L-3.500 Km.)
RWD/EE/BOKARO/09/2024-25, Construction of Road from Pilpilo to Chotkikudi (L-2.150 Km)
Construction of road from Birsingpur Panchayat Bhawan shiv Mandir to Durlabhdih Gorai tola (L-1.000 Km.)
RWD/JAMSHEDPUR/61/2024-25 CONSTRUCTION OF ROAD FROM HATA KUDADA MAIN ROAD TO NISCHINTPUR, JAMSHEDPUR.
Construction of Road from R.C.D. Road to Village Dhab via Laxmi Mandir, Purani Basti (L-1.500Km.)
Construction of Road from Pakur Barharwa Road to Mahadevpur Village End Via Jaherthan (L-1.650 Km
RWD/RANCHI/ 17/ 2024-25 Construction of Road from Jaratoli School to Baligarha (Length-1.80 Km.)
Construction of Road From Radhanagar Pax Wearhouse to R.E.O. Road Via Shiv Mandir (L-1.200 Km.)
RWD/KHUNTI/13/2022-23, Construction of Road from Kudlum to Ithe Simartoli (L-5.70 Km.)
Construction of Road from Bhawanbagi in Village-Lakura to Bachwariya via Lakura Village (L - 2.700 Km.)
Construction of Road from Ram Mandir Bhatbigha to PWD Road via School Block Chouparan District Hazaribag
RWD/DEOGHAR/18/2022-23, Construction of Road from Behratanr More to Sandubbi (L-1.800 Km.)
Construction of Road from Vill. Pasiyadih, Bajrangbali Temple to Pasiyadih Tongri via Anganbari Center (L-1.500Km.)
Construction of Road from Gopidih Pitch Road to Shakardih (L-2.500Km.), RWD/GIRIDIH/57/2024-25
RWD/EE/SRK/02/2024-25 Construction of road from Telai to Potka. (Length 2.400 K.M.)
Construction of Road from Mundmala R.E.O. Road to Haldi Tola via Jamalpur Field (L-3.500 Km.)