Loading…
Loading…
17,317 results • Best match
Construction of Footpath, Laying of Storm Water Line and Cement Concrete Work after Main Road Widening, at Vrindavan Colony in Ward No. 09 under Zone No. 01 Third Call
Construction of Boundary Wall Removed in Road Widening and other Necessary Civil Work from Antim Chouraha to Parmanad Hospital In Ward No. 06 under Zone No. 02 Third Call
Construction of Boundary Wall Removed in Road Widening and other Necessary Civil Work from Antim Chouraha to Parmanad Hospital In Ward No. 06 under Zone No. 20 Fourth Call
Construction of Roads, Storm Water Drain, Sewage Collection Network, Water Distribution Network, Street light in Industrial Area DMIC Vikram Udyogpuri, Ujjain (Second Call)
CONSTRUCTION OF ROAD AND DIVIDER AT SOHAGPUR
CONSTRUCTION OF ROAD SHOULDER WARD 02,09 BIJAWAR
Construction of Road at Semra to Doshpur
Repair re-carpeting of Perimeter Bituminous Road from Main Gate to Watch Tower No. 18 and internal Roads of GMP 1230 to GMP FB, Main Gate to IEs Gate area and NG-MM at O. F. Itarsi
Ward 20 CC Road Work Tarkeshwari colony different places
CC ROAD WORK OLD BUS STAND TO DP CHAURAHA
Construction of road from village Salaiyapamar via Palothar tribal camp Block Datia Distt. Datia
Repairing of CC road, drain side shoulder and improvement of left turn and approach road of various internal road under Huzur vidhan Sabha area of Bairagarh, Bhopal
CONSTRUCTION OF PUBLIC PLATFORM NEAR PANCHSHEEL NAGAR GATE NO 1 LINK ROAD NO 2 WARD 47 ZONE 06
Construction of CC road and drain from Montu ji house to Mandav Link Road in ward number 11
Office of Executive engineer Light machinery and E/M Div, Kolar irrigation colony link Road no-3 Bhopal
Construction of C.C. Road in sanjay nagar AB Link Road, ward 15, File no.162/21x3/6. 2ndcall.
B.T. Renewal work on Pooranpura Link road Gali No. 5 to Ahmadpur road length 1.80 km. IIIrd Call.
wn 33 const of paver block interlocking road at ashok nagar colony in front of idga link road
Re-surfacing of Bituminous internal road of Bangwar Colony, Amlai colony and RRRT Colony of ABD sub area in Sohagpur Area
SPL REPAIR TO INTERNAL ROAD AROUND JCO/OR MD ACCN UNDER AGE B/R-II MORAR CANTT GWALIOR UNDER GE GWALIOR
SPECIAL REPAIR TO INTERNAL ROAD ALONGWITH CONNECTED WORK IN 436 COY ASC (SUP) TYPE A AND DEPOT PREMISES UNDER GE BHOPAL
Construction of CC Road (strengthening of existing CC Road) and Paver-block work at different wards of Nagar Parishad Mhowgaon under Kayakalp Yojna 2.0
REPAIR OF ROAD AND RELATED MISC WORKS AT MD OTM ACCN AT ZONE B DHAR ROAD UNDER GE A DHAR ROAD
Construction of Cement Concrete Road at at Bhavani Nagar Road near Gail India Company to Bhavani Nagar Kankad Approach Road in Ward No. 18 under Zone No. 17
Repairs to coal transportation road (CTR) from Lakha Banjara to Tawa-I Mine, Repair of patches of Chhatarpur CTR, Approach road to Tawa-II Mine of Pathakhera Area.
Construction of 50 Bedded Hospital Building Civil and Electrical work including Lift, 06F, 06G, 06H Type Staff Quarters, Approach Road and Development Work at CHC Budni District Sehore.
B.T. Renewal of Parai Approach road 4.00 km. , Boda To Khuta Road L. 1.70 km. Total Length 5.70 km. at Sub. Division Chitrangi Distt. Singrauli (M.P.) GRUP-5
Construction of Production Unit Shed including Internal Electrification and Sanitary Fitting, Precast Boundry wall and Motarable Approach Road at Survey No. 202/2, Village Malwai Distt Alirajpur (M.P.)
Construction of Submersible Bridge Across Bina River in Km 11/6-8 on Bina-Barodia-Kaithora-Kurwai Road at Barodiaghat Including Approach Road and Protection Work. Distt. Sagar
Construction of Jasguwn kala to Surajpura Khurad Road Tigdda Length 3.00 Km and Singrampur Pradhanmantri Road to Ranital Approach Road Length 3.40 Km under PWD sub division, Bijawar
CONSTRUCTION OF PRIMARY HEALTH CENTER (PHC) INCLUDING (1 G AND 1 H TYPE QUARTER), BOUNDARY WALL, TUBE WELL AND APPROACH ROAD AT AMRAVAD BLOCK BARALI DISTT.RAISEN)(SECOND CALL)
BT Renewal Work on Himmatpur Badarkha Road Length 2.60 KM and Dulhai Approach Road Length 2.20 KM Total Length 4.80 KM Under Sub Division Pichhore Distt. Shivpuri (M.P.)
Construction of Work PHC Building Including 1 G and 1H Type Ouarters Boundary Wall,Tube Well and Approach Road at Village Sachet Block Sanchi District Raisen (Second Call)
BT RENEVAL OF AMAD APPROACH ROAD LENTH 1.80 KM CH 0-2/80), KUNDLALIYA CHIKLI GUJRAT ROAD LENTH 2.80 KM CH 0-3/80) TOTAL LENGTH 4.60 KM
Patch Repair works of Lambakheda to Islam Nagar Road L 4.00 KM. Lambakheda to Pipariya Baj kha Road L 05.00 KM. Pipariya Sewaniya Approach Road L 1.50 KM.
Special Repair of Flush Causeway in Km 1/8 and Retaining wall in Km 1/2 on Bharroli Approach Road under PWD Sub Division Ashoknagar Distt. Ashoknagar (MP )
B.T. Renewal Work on (1) Rajpur Lachhi Budra Morani Ranipura Gothaniya Saktipani Junajhira Road Length 3.00 Km (2) Agalgaon Approach Road Length 2.00 km Total Length 5.00 Km
Construction of entry gates, parking, approach road, restaurant, dormitory, workshop sheds, boundary wall, painting and landscaping works for setting up of Craft Tourism Village at Kukshi, distt, Dhar.
Repair of balance coal transportation road from boom barrier along with approach road to new weigh bridge at Sharda OCM of Burhar Sharda Sub Area of Sohagpur Area
BALANCE WORK OF STRENGTHENING OF TINMAGHARIYA TO KOTIYA APP ROAD LENGTH-3.50 KM, KOYALKHUNTH TO BAHERI APPROACH ROAD LENGTH-2.50 KM TOTAL LENGTH-6.00 KM DISTT.-SINGRAULI (M.P.)
Balance Work for the Construction of High Level Bridge across Chambal River including approach road at Usaid Ghat on Ambah-Pinhat road in km 24/2 District Morena.
Development of Ram Sagar Pond in Gram Padri along with construction of stairs, Sheds and approach road to the Pond at Block B Area (CSR Activity 2022-23)
Repair of cross drainage work and approach road from weigh bridge to bunker around bunker under etc at Damni u.g. mine under ABD Sub area of Sohagpur Area
Construction of Approach Road From Phunga Semariya Km 11 2 to Pateratolla, Bartolla,Dindori tolla village roadTotal Length 6.00 Km B.T.5.50 C.C.0.50Km Under Sub Division Anuppur
Necessary Maintenance on Approach Road and Nearby Garden for Plantation to Host the Smart City Shikhar Summit in Ward No. 32-34 under Zone No. 07 Second Call
Berm Filling on Rehda approach road under Seoni Malwa Sub Division. 1st Call, PAC Rs. 4.11 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 60 days.
ANNUAL REPAIR WORK FOR CONSTRUCTION OF APPROACH ROAD OF HIGH LEVEL BRIDGE ACROSS PHALKO RIVER ON GUBARA KATAV MAJHOLI SIHORA ROAD AT KM 30 4 6 DISTT JABALPUR
CONSTRUCTION BOUNDARY WALL, CEMENT CONCRETE APPROACH ROAD, RCC HUME PIPE CULVERT, DRILLING OF TUBEWELL, WATER HARVESTING AND OFFICE GREENRY WORK AT DIC OFFICE BUILDING SHEOPUR DISTRICT SHEOPUR (M.P.)
Shri Singaji TPP Khandwa- Works of repair, maintenance and strengthening of damaged stone pitching of embankment of approach road to Intake well of SSTPP, MPPGCL, Dongalia Distt. Khandwa.
Construction of Slab Culvert work of Choubaradhira Eklera Road km 2/2 and 6/2 and Construction of Box Culvert work of Padliya Approach Road km 2/4