Loading…
Loading…
17,317 results • Best match
Special Repair of Roads / Culverts (Flood Damage)
Special Repair of Roads / Culverts (Flood Damage)
Special Repair of Roads / Culverts (Flood Damage)
Special Repair of Roads/ Culverts (Flood Damage)
Repair of Road Work in Km. 42.6.8, 43.10 and 44.8 on Ghat Portion on NH135B
Laying of Paver Block from M.R. 9 to Link Road at Veena Nagar A Sector in Ward No. 22 under Zone No. 05
Estimate for Installation of 100 KVA additional DTR near Dr. Rathi link road Under Betul T zone - 2 in OandM Dn Betul S
Cement Concrete Work from M.R. 10 to Link Road at Ashish Vihar Colony in Ward No. 38 under Zone No. 19 Second Call
To provide cafeteria/canteen services on rent for a period of three years at Van Bhavan, Tulsi Nagar, Link Road Number 2, Bhopal
Balance work of approach road, cable tray and other civil work for new 33/11 kv S/s at village Pipalpani, under Khaknar DC, O and M Dn. Burhanpur, O and M Circle Burhanpur.
Extra Widening of Existing Stage, Construction of concrete Hellipad and Cement concrete road in air ambulance, Renovation of Amar Jawan Memorial, Construction of Pared Inspection and VIP Approach road at Police Pared Ground Rajgarh
Construction of Kushalgarh to Akatwasa Approach Road Length 4.10 Km, Semalkhedi to Pingrala Road Length 2.75 Km, Manyakhedi to Gondidharmasi Road Length 2.20 Km Total Length 9.05 Km Including External Electrification Work. DISTT Ratlam
B.T. Renewal Work of (1) SH-22 Sahawan Road Length 1.20 K.M. (2) Pipraiyakala to Usray Road Length 2.95 K.M. and (3) Mau Approach Road Length 1.00 K.M. Under Sub. Division Gadarwara. (3rd Call)
Construction of Approach road infront of New Library building in Govt. Home Science College, Narmadapuram. 1st Call, PAC Rs. 7.97 Lacs on Road and Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 60 days.
B.T. Patch repairs on Superly approach road, Dhamasa to Temla road and Narayan Colony to Aypa road. 1st Call, PAC Rs. 10.13 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 120 days.
Patch Repair works of Sukhi Sewaniya to Agariya Mugalia Road Length 10.50 KM. Mugalia Kot to Islam Nagar Road Length 2.95 KM., Khejda Approach Road L 2.50 KM. , under Jail Sub Division -1, Bhopal
BT Renewal and work of Tarana road DONTA JAWASIYA ROAD, KANIPURA TARANA KARANJ BYEPASS ROAD, TARANA HOSPITAL ROAD, TARANA OFFICE COLONY ROAD, TARANA TAHSIL APPROACH ROAD at Sub division TARANA Dn. Ujjain. (Third CALL)
B.T. Patch repair work on Kesla Taku road, Pipaliya Kalan approach road under Sub Dn. Seoni Malwa. 1st Call, PAC Rs. 10.00 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 120 days.
B.T. RENEWAL WORK ON SAMNAPUR-BAJAG ROAD LENGTH 6.00 KM. (AMOUNT 60.48 LAKH), KUDA-CHANDRANI ROAD LENGTH 7.30 KM. (AMOUNT 54.40 LAKH) AND DHURRA APPROACH ROAD LENGTH 1.20 KM. (AMOUNT 9.27 LAKH) (1ST CALL)
B.T. Patch Repair on Bhisampur Devri Kumahari Pathra Road L.- 5.50 km, Kharmseda Kirhari Road L- 7.80 Km, Bartona Approach Road L- 3.40, Kharmseda to Jariyari Road L- 2.60 km Under Sub Divison Amarpatan
Construction of Cement Concrete Road and Approach Road at House No. 43 Rikki Khandelwal House and House No. 301 to 266 at Shradhhapuri Colony in Ward No. 85 under Zone No. 14 Second Call
Construction of Padokhar to Dihiya Bansi road, Madwa Chauraha to Rewa Sidhi via Premnagar road, Padaria approach road via Madhi Mahula And Ondhki Tiraha to Padokhar via Lakshya International School Total length 8.50 km.
PATCH REPAIR ON VARIOUS INTERIOR ROADS KHANDWA SECTION UNDER DISTRICT SUB DIVISION NO. 1 INDORE UMARIKHEDA APPROACH ROAD 0.60 KM MOROD NEHRUVAN ROAD 2.00 KM SAHARA CITY BYEPASS DUDIYA ROAD 3.10 KM (VIITH CALL)
DEVELOPMENT OF SATNA AIRPORT FOR 19 SEATER AIRCRAFT. SH Re-Surfacing of Runway, Construction of Apron, Blast Pad, GSE Area, Link Taxiway, Approach road from Fire Station, City side roads and Car Park etc.
Metal Patch Work for Solution of Mud Problem in Rainy Session at Ganesh Nagar, Arjun Singh Gohar Approach Road and other places as required in Ward No. 23 under Zone No. 05 Second Call
Special strengthening work Majhaganwa Town Road, Semaria Dharkundi Road, Paldev Posalha Road, Podi Mankahari Road, Chaubepur Kharha Approach Road, Patna Patni Road, Hirauni Kuldari Road, Birsinghpur Chakra Road, Karigohi Kathara Road, total Lt. 25.78
SURVEY, INVESTIGATION AND PREPARATION OF D.P.R. WORK OF UNCHEHARA PARASMANIYA DUREHA ROAD LENGTH-5.00 KM., SATNA ATRA ROAD LENGTH-2.80 KM., SHYAMNAGAR APPROACH ROAD LENGTH-3.20 KM, TOTAL LENGTH- 11.00 K.M. UNDER SUBDIVISION NAGOD.
Road Repair Related Work (WMM, BT Patch, Retaining Wall) Guard wall, Shoulder And CD, Risk And And Other All Road Repair And Immediate Helipad, Barricade Work for VVIP Work Under P.W.D. Division Morena
1) Construction of Harijan Basti chungar Fatak to CMHO office road Length 1.40 Km. (2) Police line-Rajghat Tiraha Junction NH Road Length 0.880 Km. (3) Kamrari to Rajak ka dera road Length 0.710 Km
Construction of CC From jhanda chok to masjida to jawhar chok to santoshi mata gali and ward 09 puliya to manohar jat house and ward 15 selana road to yadav mohalla
WARD 09 CC ROAD WORK MAHAL COLONYAT DIFFERENT PLACES
W15 ME DP SE MARGHAT TAK CC ROAD WORK
Survey and Investigation for road work under division Dhar
subhash chock to kali mata mandirtak bituminous road work
subhash chock to kali mata mandirtak bituminous road work
Construction Of CC Road Work At Dhanchabhawan Ward-17
WARD 09 CC ROAD WORK NISHKA SALES-LALARAM KUSHWAH
Survey and Investigation for road work under division Dhar
Ward 09 CC Road Work Ramle Bali gali main
W15 MAIN ROAD SE DP TAK CC ROAD WORK
SUPPLY OF MINERAL AGGREGATE FOR WBM PATCH REPAIR OF ROAD UNDER SECTION KARTHUA SUB DIVISION CHITRANGI DISTRICT SINGRAULI MP
Repair of Road from Welcome Gate to Karkati ByPass Tiraha (near Crusher On Burhar Khairha Road) of Sohagpur Area
SUPPLY OF MINERAL AGGREGATE FOR WBM PATCH REPAIR OF ROAD UNDER SECTION BAGAIYA SUB DIVISION CHITRANGI DISTRICT SINGRAULI MP
Renovation of Entry gate and patch repair of road at Umaria mine of Umaria Sub Area of Johilla area.
Repair of Road from Bemhori village trijunction to Sangma Siding trijunction with cross drainage work through ABD Sub Area
SELECTION OF CONTRACTOR FOR DESIGN, CONSTRUCTION OF ROADS, CULVERTS, SIDEWALKS, PHE WORKS, LANDSCAPE, MULTI DUCT ON SMART ROAD CONCEPTS UNDER SAGAR SMART CITY LIMITED, SAGAR, MADHYA PRADESH PHASE II
Bitumen road work at Ward 15 Nai abadi Jain Dadawadi to Hanuman mandir and Utkrisht school Runija road Nagar Parishad Suwasra
Strengthening of road Jhirniya Karariya Andiya Sounther road and multiple roads total length 11.93 km. PAC Rs. 743.37 lacs First Call on Road and Bridge SOR 25.03.2022 work period 240 days I/c rainy season
Construction of Cement Concrete Road Widening, laying of Storm Water Line and Construction of Footpath from M.P.E.B. Zone Via Sangam Nagar Ram Mandir Main Road to Gomti Tiraha in Ward No. 13 under Zone No. 04
Road repair work at different places in Ward No. 01 to 25 (IInd Call)