Loading…
Loading…
17,317 results • Best match
Road Repair Related Work (WMM, BT Patch, Retaining Wall) Guard wall, Shoulder And CD, Risk And And Other All Road Repair And Immediate Helipad, Barricade Work for VVIP Work Under P.W.D. Sub. Division Sabalgarh
CONSTRUCTION OF SLAB CULVERT (1X3.0M) AT GRAM PANCHAYAT KARI PMGSY ROAD KODWAHI APP. ROAD (ADIWASI BASTI) BLOCK DEOSAR, DISTT- SINGRAULI (M.P.)
Remaining work of gravel road from Takhatpura (PMGSY Road) to Semli Kankar under CMGSY scheme Block Khilchipur District Rajgarh (Biaora) M.P
CONSTRUCTION OF PMGSY JOGIYANI TO HATKA ROAD VIA BODARA TOLA ROAD L- 4.50 KM. UNDER SUB. DN. WAIDHAN, DISTT- SINGRAULI (M.P.)
Construction of Road in Bhagat Singh Ward Goswami Atta Chakki to RaghuwanshiJi Punour Wale ke Ghar ke Aage. Construction of Road in Rajendra Ward Beside Prabhat Pathak House to Virendra Mohta House.
Construction of C.C. Road and Drain Work at Village Lakhnautikla Approach Road Govind Jatav House to Govt. School and Ramsingh house and Various Streets Zone no. 25 ward no. 66. File No. 622/23X3/6.
Group-B Bt Renewal Of 1. Baldevgarh Rest House Road 2. Baldevgarh Nowgong Road 3. Nanhi Tehri Talmau Road 4. Majna Digora Road 5. Maharajpur Approach Road 6. Tikamgarh Banpur Road 7. Bamhori Mohangarh Road
Construction of Karaundiya Uttar tola (CMIT Collage) to Karaundiya Dakshin tola Morrison School Approach Road, Length- 1.00 Km., Under PWD Sub Division. Sidhi, Distt-Sidhi (M.P.) PWD Road and Bridges SOR w.e.f 25-03-2022
Bridge and Culvert Repair Work on Various Road Jail-2 Sub Dn. Bhopal Barkheda Pathani Laharpur Bagroda Road, Misrod Amjhera Road, Bilkhiriya to Kankali Road,Semri khurd Approach Road and Semri to Bamulia Dangi Road.
Construction of Widening of AcharpuraIndutrial Area approach Road fron SH-10 ( Eitkhedi Road), Bhopal Length 3.00 Km. PAC Rs. 755.93 Lacs First Call on Road and Bridge SOR 25-03-2022 work period 450 days
Restoration work for damage portion of Raisalpur approach road from N.H. 69 due to heavy rains. 1st Call, PAC Rs. 4.00 Lacs on Road and Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 90 days.
Laying of Material for Solution of Mud Problem and Road Leveling on Revati Village Area, Bardari Bhawrasla, B.S.F. Tekri Plantation Place Approach Road at Ujjain-Sanwer Road in Ward No. 18 under Zone No. 17
Special Strengthening of Nipaniyakhurd approach raod to Arniyakala kotharikala road, Dhabla Ghonsi approach road, Dinglakhedi to Murawar road, Heerana to Bhelkheda road and Polaykala to Ranayal via Nayapura road Total Length 19.95 k.m.Under Sub Divis
CONSTRUCTION OF BITUMEN APPROACH ROAD WITH CDS 1) FROM KARONDIYA_KHAPRKHEDA MAIN ROAD TO DHANARAJS AGRICULTURE LAND, 2) FROM NISARPUR_BHAWARIYA MAIN ROAD TO AGRICULTURE LAND, 3) RETAINING WALL NEAR AGRICULTURE LAND OF RADHESHAYAM and OTHER FAR
Construction of Panchi Murela road to Badi Mureli and Neshkala to choti mureli road Total Length 7.60 K.M., Construction of Bagraj approach road including culvert via Kherkheda devpura road Total Length 2.80 K.M. (4th Call)
CONST. OF CHABUTRA-SHED AND P-F PAVING BLOCK AT JATKHEDI SHAMSHAN GHAT AND CONST.OF C.C. ROAD AND WBM APPROACH ROAD TO 55 JHUGGI AREA JATKHEDI FROM SHAMSHAN GHAT Z-13 W-53 Z-13
Work of providing chain link fencing from LVUP to Stage-I silo gate towards both side of newly constructed approach road and providing 9.0 M wide MS gate at SSTPP, Stage-II, Dongalia Distt. Khandwa.
CONSTRUCTION OF APPROACH ROAD WITH CD and SLAB CULVERTS FROM VILLAGE CHANDANKHEDI TO UNAFFECTED LAND OF 1) HINGLI BAI, NANSINGH and OTHER FARMERS AGRICULTURE LAND, 2) AMARSINGH , and OTHER FARMERS AGRICULTURE LAND, TEHSIL KUKSHI DISTRICT
CONSTRUCTION OF (1) LALPUR JAKHI APPROACH ROAD TO SAYLO MAUHARI ROAD LENGTH 3.60 KM. (2) HOUSE OF GOPIMAN SINGH TO KUKARHAI CHHATARI VILLAGE PATHRAUNDHA ROAD LENGTH 2.00 KM. TOTAL LENGTH 5.60KM, UNDER SUB DIVISION NAGOD.
Restoration work for damage portion of Raisalpur approach road from N.H. 69 due to heavy rains. 2nd Call, PAC Rs. 4.00 Lacs on Road and Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 90 days.
Shifting and heightening of 11 KV Line and LT Line due to construction of approach road for farmers at vill.- Katnera Teh. Kukshi Dist. Dhar including material, labour, charges, transportation and testing etc. complete work.
Construction of Approach Road with Cement Concrete and Replacement of Sewage line including repair of manholes, gully trap etc and miscellaneous maintenance works of office building and residential quarter at ISPW Arera Hills, Bhopal(M.P.)
Servey Design and Construction CC road work under Chief Ministers Adyostructure fourth phase
Construction of Asphalting Road work at Ram nagar gitti khadan Basti Approch Road in Ward no. 01.
Construction of PCC Road Work From Shameem Bhai House to Akhtar Bhai House at Ward No 11
Construction of CC Road Work at Dangi Dharamshala gali And Gali no. 01 in ward no. 12.
Construction of CC Road work at Behind Mohan jaiswal ji House indira nagar in ward no. 05.
Construction of CC Road Work at Joshi ji House to Mangesh ji House in ward no. 05.
Construction of CC Road Work at Rishi verma ji House to Garden EWS in ward no. 05.
CONSTRUCTION OF C.C. ROAD WORK AT ASH0K VIHAR GURJAR HOUSE TO SAHU HAOUSE W-64 Z- 15
Construction of Road and Drain Covering from Ashok Pasnani to Ghanshyamdas and Ramesh House to Shyam Soni House, Ward No. 39
Repairing of Footpath and Cement Concrete Work on Damaged Road From L.I.G. Link Road to Kankad Corner Ward No. 43 under Zone No. 10
Construction of Pawai to Hirnoda (Missing Link) road length 0.50 km. Adiwasi Basti (Dabra) to Kwetan River length 0.40 km. total length 0.90 km.
Cement Concrete Public Contribution Work on link Road from Ring Road to M.R. 3 Main Road in Ward No. 37 under Zone No. 08
One time Improvement of Existing Link Road on NH-135 Mauganj town Portion From Km 167.700 to 174.300 in the State of Madhya Pradesh
B.T. road construction from Badi village towards Bhils hut asphalt road construction work length 1.01 km district neemuch
SPECIAL STRENGTHENING OF ROAD BHONDIYA CHHIND TO PIPARIYA KARANSINGH BAGALWADA and various roads LENGTH 22.70 KM. PAC Rs. 808.93 lacs First Call on Road and Bridge SOR 25.03.22 work period 450 days I/c rainy season
ASPHALTING OF ROAD WORK AT FROM MAIN ROAD TO NRI COLLEGE NEAR GILL DHABA RAISEN ROAD W-62 Z-15
Special repair of internal roads of hospital premises, OTM Accn and JCOs/ OR Govt MD Accn at Nar Bahadur Enclave of MH, from HR-89 (Tech Block) to 2 Coy Gate 1 TTR, 1 STC and at 54 COY ASC (SUP) type C under GE (W) Jabalpur
Repair of Road Work in Km. 37.200 to 41.1000 , 5.00Km. on NH-135B Sirmour Dabhoura Road
CC road construction work from Vikas Colony to Christian Kabrastan
Construction Of Cmenrt Concrete Road Work At Vallabh Nagar In Ward - 43
Construction of CC Road work Near Baypass Tirahe Safed Chabutra in Sheopur
Construction of road from Main Highway in Gram Panchayat Udaipur to Neem Parvat via Singarpura (from NH-44 towards Shobharam Pulia to Sheesham Neem Parvat to Swagat) 3.00 km. Block Morar Distt. Gwalior
Repair of Roads in Factory and Township Area
REPAIR OF ROADS IN FACTORY AND TOWNSHIP AREA.
W.B.M. Patch repair of Road Under Sec. Madwas, Sub Dn. Majhauli, Distt. Sidhi, PWD Road SOR date 25-03-22
Supply of Road Material for WBM and BT Patch Repair of Road Under Sub Division Shahdol Section Rest House Shahdol.
CONSTRUTION OF RCC DRAIN AND REPAIR OF ROAD AT KUMHAR MOHALLA AND BAIRAGARGH CHICHLI WARD 81 ZONE 19. SECOND CALL
Construction of CC Road Work at Birajpura, Sanghmitra marg, paras nagar And Siddhwat marg in ward no. 01.