Loading…
Loading…
17,317 results • Best match
Maintenance And Repair Of Roads And Cds Including Bt Patch Repair By Paver Finisher Improvement Of Shoulders Jungle Clearance Road Marking Painting Km Stone Point Stone Etc Works As Per Requirement On Roads Under District Sub Division No. 2 Ind
Zonal work of Maintenance, Patch repair of roads in P.W.D. Division No. 1, Narmadapuram (For F.Y. 2025-26). 1st Call, PAC Rs. 50.00 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 365 days i/c rainy season.
Zonal work of Maintenance, Patch repair of roads in P.W.D. Division No. 1, Narmadapuram (For F.Y. 2025-26). 1st Call, PAC Rs. 80.00 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 365 days i/c rainy season.
Zonal work of Maintenance, Patch repair of roads in P.W.D. Division No. 1, Narmadapuram (For F.Y. 2025-26). 1st Call, PAC Rs. 50.00 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 365 days i/c rainy season.
Development work and construction of internal roads, laying sewage lines, Construction of 2 Nos. Septic Tank and 2 Nos. Borewells etc. For Border Security Force (BSF) Campus at Badarkha, Bhopal - (Package-I) SH : Providing service of MTS/Peon for the office of Assistant Engineer-II, CPWD, Bhopal (From Outsourcing)
B.T. Renewal work on Bandrabhan approach road, Shivpur to Talkesri road, Simrodha to Khairi road. 1st Call, PAC Rs. 39.90 Lacs on Road Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 90 days ex/c rainy season.
Levelling ground approach road transportation of material at Helipad ground, Seoni Malwa Sub Division. 1st Call, PAC Rs. 16.33 Lacs on Road and Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 60 days i/c rainy season.
CD repairing on Mahuadhana to Surajpur, Pipaliya approach road, Pipaliya to Zamani, Nandarwada Koylajhir, Lokhartalai to surajpur road under FDR. 1st Call, PAC Rs. 17.85 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 90 days.
Making platform for parking of Continuous Miner machine near incline mouth, levelling and concreting on open area opposite canteen for vehicle parking, and repairing of pot holes on approach road to Tawa-II Mine of Pathakhera Area
Making Shoulder with approved material and using vibratory roller of 80 to 100 KN static weight to meet requirement of approach road to connect PWD Road to coal stock yard at Rampur Batura OCP under Sohagpur area
Construction of Approach Road Eklavya Model Residential School Sohagpur -Dhurwar to NH-43 Road at Eklavya Model Residential School Sohagpur and Eklavya Model Residential School Shahdol -Harri to NH-43 Road at Eklavya Model Residential School Shahdol
All types of renovation work for weigh bridge and boom barriers of both mines with widening of approach road by P.C.C. in front of boom barrier near Baherabandh Mine gate under Bijuri Sub Area of Hasdeo Area.
BT Renewal of Riyana approach road 0.55 km, Hata Badoda road 1.10 km, Beeja Badoda road 1.00 km, Sahsan Padariya road 2.40 km., Ujrod app. road 0.70 km., Natwara Bamhnoda road 1.85 km total length 7.60 km
Construction of Pipra Canal to Tierra Higher Secondary School Length 2.50 kms , Tiara Dakshin Tola to Bilaspur approach road Length. 2.40 kms ,Siddhikhurd Giddakhadi Ramlalit Bais Shop to Sangamlal Bais Marg. 4.40 kms Total Length. 9.30 kms
Construction of Superli to Berakhedi approach road length 3.20 Km. under Seoni Malwa Sub Division. 1st Call, PAC. Rs. 299.39 Lacs on Road Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 300 days i/c rainy season.
NIT SCHEDULE FOR CONSTRUCTION OF SLAB CULVERT AT GRAM PANCHAYAT PACHAUR GOVAR KUNDI MAHALLA ON KUDIYA NALLAH SUB DN DEOSAR DISTT SINGRAULI 1NO SINGLE SPAN 3M 01 NO DUBLE SPAN 8M PCC APPROACH ROAD AND RETAINING WALL
Construction of Approach Road from Punjab Petrol Pump Navghatkhedi se Shri Charukeshwar AshramTak Swikrat Marg ko Shri Jagatguru Ramanandachry Swami Shri Ram Rajeshwarachary ji Mouli Sarkar ke Ashram Tak Total Length 0.40 Km. under Sub Div. Barwah
Cement Concrete Work at Bicholi Mardana Pahadi Tekri Opposite Gopal shree Academy Star Land Academy Side in front of New Krishna Bal Mandir and Bundela Ji Lane Approach Road in Ward No. 76 under Zone No. 19
Annual maintenance of ash dyke phase-II and ash pond management for pollution control works and operation and maintenance of shaft and approach road around ash dyke-I and II and other work assigned at SGTPS, Birsinghpur
B.T. Renewal Work on Rest House Pohari, Rannod, Kolaras, Badarwas and Padora Approach Road Length 2500 M and B.T. Renewal Work on Meghona Madwasa Road Under AR Maintenance Work In Kolaras Length 3.50 KM Distt. Shivpuri (M.P.)
Tender for Construction of Sidhbaba Approach Road Length 1.50 Km. and Sidhghat Approach Road Length 3.40 Km. under Sub-Dn. Keolari.
CONSTRUCTION OF C.C. ROAD WORK AT GALI NO 01 FROM MR. SALIM MECHANIC TO KAMLESH MADAM IBRAHIMGANJ WARD 17 ZONE 04
Strengthening of road from km 15/8 to 19 and 55/6 to 66 Total 16 KM NH 43 Extn Gulganj Amanganj Pawai Katni Road on EPC mode Under NH Division Sagar in the state of Madhya Pradesh
Strengthening of road from km 9 to 43 Total 35 KM NH 86 (New NH 934) Sagar Chhatarpur Road in the State of Madhya Pradesh on EPC mode Under NH Division Sagar in the state of Madhya Pradesh
CONSTRUCTION OF CEMENT CONCRETE ROAD WORK NEAR DARGAH/WELL (PART A) AND CEMENT CONCRETE ROAD WORK NEAR EXISTING SHEDS (PART B) AT MANDI YARD BERASIA(IIND CALL)
CC road repair work in ward number 09 from Prakash Medhe house to Naja Qureshi house
Zonal tencer for Road repair and Maintanance for Damage in Reainy Seson Under PWD Division Jhabua
Ward No. 01 CC road repair work from Chandrika Prasad Upadhyay house to the main road.
Road repair work at various places in Purani Basti and Shankar Nagar under Ward No. 73
CONSTRUCTION OF DRAIN AND CC ROAD REPAIR FROM MAHARAJPURA AND BANPURDARWAJA AT WARD NO 05 TIKAMGARH
construction of Cement concrete road work at various places in WARD NO. 03
Renovation and repairing of Accountant, Electrician, Head Mali, Lashkar line, Police gard line, Coach house, Power house, approach road, Temple, Bird house, Astabal at Raj Bhawan Campus, Pachmarhi. 2nd Call, PAC Rs. 110.27 Lacs Bldg. SOR 01.12.2020.
B.T. Renewal on Chandla Sarvai Gourihar Mantondh Road Km 8 to 10 and Km 16 to 24 Total Length 12.00 Km and Jail and College approach Road Lengh 0.30 KmTotal length 12.30 Km under Sub-division Luvkushnagar
Survey Investigation And Preparation Of D.P.R. For New Road Works of Various Roads in SubDivision Morena (SECOND CALL)
Survey Investigation And Preparation Of D.P.R. For New Road Works of Various Roads in SubDivision Ambah (SECOND CALL)
Miscellaneous Civil Electrical Water Supply and Road works at Various Industrial Area of MPIDC, R.O. Ujjain II Call
Construction Of CC Road Work At Agar Road Udhoydpuri In Ward - 18
Soil filling and Construction of CC road work at Superintending Engineer Office PHE Campus Khargone
Construction of road and Drain under CM infra 4th phase Add on second call
Under work Nagar Palika Parishad Sarni area P.K-2 Mines to Driling Camp Pathakhada sarni. In Ward no. 17,23,24,25,26,27 and 28 too B.T Road Strengthening Renewal Coat and Road located culverts Constriction work.
CONSTRUCTION OF C.C. ROAD WORK RAMCHARAN VISHAWKARMA TO WATAR TANK AT SABRI NAGAR W- 72 Z- 16
CC ROAD WORK AT WARD 02 FROM KALESHWAR MANDIR TO RAILWAY STATION BOUNDRY UNDER KAYAKALP ABHIYAN 2.0
Cement Concrete Work from Opposite MPEB Sub Station to Krol Bagh Link Road at Kumedi Village in Ward No. 19 under Zone No. 17 Second Call
Construction of shoulder on road of Smart Park to Akashwani Square at Shyamla Hills (Link road No.1) under City Sub Dn. No.2 PWD Bhopal.
CONSTRUCTION OF C.C. ROAD AND PROVI. AND LAYING BLOCK BEHIND SANTOSHI MATA MANDIR NEAR LINK ROAD NO 03 RAHUL NAGAR WARD NO-29, ZONE NO-18.
CONSTRUCTION OF RCC DRAIN AND HUME PIPE CULVERT ASHOK SONI HOUSE TO DR. DISHA CHOURASIYA HOUSE TO LINK ROAD AND OTHER LOCATION IN CHANDRASHEKHAR WARD BETUL
CM Infra Phase III scheme second call At ward no.10 CC Road construction work for Siddheshwar Temple approach road. Municipal Council Billowa Dist Gwalior
W12 ME CHANCHAL KE MAKAN SE RAJBAHADUR TAK CC ROAD WORK
Ward 02 Manish Vishwakarma to Rajkumar Rai house cc Road work
CONSTRUCTION OF EIRTH ROAD WORK WAY OF NAIGUA TEMPIL AT LIDHORAKHAS