Loading…
Loading…
16,543 results • Best match
Periodical maintenance of 5 year completed PMGSY Road from PWD Road to Saradhapur (Package No.OR-24-ADB-03) under Khariar Block in the District of Nuapada for the year 2020-21.
Annual Maintenance Plan for 5 years Completed PMGSY (POST DLP e-MARG Module) roads such as (a) Malipada to Hadapada for the year 2024-25 under Package No. PM / BBSR / 67
Periodical Renewal of 5 year completed post DLP PMGSY (a) L045-Manduki to Olara Road, (b) L 47 to Ratanpur for the year 2023-24 under Package No. PM/NIMAPARA/08.
Repair and renovation of pipe line damaged due to construction of PMGSY Road project for PWS to Badapadu and Khambapadu GP Ralegada under Pottangi Block of Koraput District under DWSM Deposit
Approach road from main road near blind school, Palashpalli to the extreme end of boundary wall of Airport (plot no-A-31 to Plot no-C-78, plot no-C-91 to Plot no-A-31 and Plot No-B-1 to B-4) in Ward no-53
Providing barbed wire fencing, exterior color, cycle stand, ventilator glass top and bottom, shutter repair, floor and road repair work at SWC Nagenpali
Repair of Drain with cover plate and paver road work at Athagada sahi ,in ward No- 10
TENDER DOCUMENT FOR ROAD WORK INSIDE FACTORY AND TOWNSHIP AT TALCHER FERTILIZERS LIMITED, TALCHER, DIST. ANGUL, ODISHA
Improvement of traffic related road work at different locations of Gandhanardan Mines in the district of Keonjhar
Completion of balance road work from Transformer Chhak to Biswa Ranjan Das Jagatpur in Vard no-49
Improvement to road work on OAE No. 77(B) on Mahanadi left embankment from Tartol to Anoli
SUPPLY OF NALCOs POND ASH TO DESIGNATED ROAD CONSTRUCTION AND NEAR BY AREA
Construction of Roads, Paths and Street Lights for various completed & on-going projects/Building for effective utilization of assets at GC CRPF Sambalpur, Odisha. SH: Providing Miscellaneous Services for O/o Executive Engineer-Sambalpur and other sub-ordinate Offices, CPWD, Sambalpur-Recall
Canal bank service road improvement work
Road improvement work of river embankment
Road improvement work on canal embankment
Canal bank service road improvement work
Road improvement work on saline embankment
Canal bank service road improvement work
Construction of road from Kanchapada Maliksahi to Serpur roadunder CMRL in the District of Balasore for the year 2022-23
Construction of road at Nijar Ali house back side and Ram kumar lane road drain repair at ward No.5
CONSTRUCTION MAINTENANCE OF ROAD CD WORKS FROM 1. GAIKANPALI TO KHAJURBANIA IN TAPARIA G.P AT CH-0.00K.M TO CH- 0.510K.M, 2. PMGSY ROAD TO GOURPADA VIA NUAPADA IN HEMGIRI G.P AT CH-0.00K.M TO CH-1.280K.M, UNDER DMF SUNDARGARH PACKAGE-14
Improvement such as widening and strengthening of link road for a length of 1.880 km of Bandalo Enderpada road at 14.670 Km in the district of Jajpur under state plan for the year 2024-25
Improvement road from NH-5 at Nirgundi Junction to Link road junction to Nh-42 at Choudwar from 0/000 km to 3/735 km in the district of Cuttack for the year 2023-24
S/R to Nandahandi to Nabarangapur Basic school Link road road such as SDBC, Berm maintenance and CD maintenance at Ch 0/000 to 2/200 Km in Nandahandi Block for the year 2025-26
Electrical maintenance / repair of road lighting and all electrical points / fittings of GM Complex, BTI Complex and Hostel, RCSB and other electrical related works etc. of GM Office, Lakhanpur Area
Repair of road and drain from Purna Chandra Behera house to Ganesh Villa, kalandi Sasmala house to Agadhu Pradhan house at Bank colony Gopal Sahi, Bidanasi in Ward No. 2.
Periodical Maintenance of 5yr Completed PMGSY Road (A) - Banamahula to Chandahandi Road (OR-22-ADB-13-II) (B) - Banamahula to Dalabeda Road OR-22-ADB-10-II for the year 2020-21
Periodical Maintenance of 5 years completed PMGSY road Mugapala to Balikiari road from 0/0km to 0/524 km including construction of one no box cell culvert for the year 2020-21.
Periodical Maintenance OR-04-PMGSY(PM)-10 to L42-T2 to L42 to Joragadia (Jalhari to Joragadia Road)-OR-0-ADB-33 for the year 2025-26 in the dist of Bhadrak
Periodical maintenance of 5 years completed PMGSY road from Iskinda to Bilaspur such as maintenance and renewal coat with laying of SDBC for the year 2020-21 in the district of Bargarh
Periodical Maintenance of 5 years completed PMGSY Road such as providing SDBC in the district of Bolangir for the year 2025-26 for MRL05 Chanabal Chowk to Chitramunda road under Muribahal Block
Construction of Brigde over Local Nallah on Badroxy-Banko PMGSY Road to Dhunamora Road of Jamudihi G.P. of Koida Block under DMF in the District of Sundargarh for the Year 2019-20.
Periodical maintenance to the 5 Years completed PMGSY roads RD Road to Khudupada Road A PWD Road to Kukurbhuri Road B Attigaon to Kandulguda Road C and Padampur to Talpadar Road D
Construction of Bridge over Saraswati Nallah on Sanpatrapali to Khuntagaon UP School via G.P. Office PMGSY road on Tangarpali block in the District of Sundargarh under BSY for the year 2023-24.
Construction and Maintenance of K. Kamarda JBC Road to Kusuda PMGSY Road via Ahebnagar Patna Pry. School to Kiarda, Barbatia Road in the District Balasore under (TRIP) for the year 2022-23.
Periodical Maintenance of 5 years completed PMGSY roads such as (a) SH-13 to Sunapada,(b) T-7 to Tikarapada,(c ) T-3 to Rainsoll under package No.PM/PURI/40/2022-23
Periodical Maintenance after 5 year completion PMGSY Package No. OR-13-80(A) (RD Road to Solabandi) for the year 2020-21 (from RD0.00 km to 1.500 Km and 1.738Km to 2.548Km)
Periodical Maintenance of 5 years completed PMGSY Road such as providing SDBC in the district of Bolangir for the year 2025-26 for L045- RD road to Salepada road under Muribahal Block
Construction of Const. of PMGSY Road from Dhobani Chhaka- Dhanghera- Tower Chhak via Barada Dihi,, Dhanghera GP, Khunta road under MMSY-TRIP in the District of Mayurbhanj for the year 2023-24.
Periodical maintenance of 5year completed PMGSY road Lakhna to thakpali road such as SDBC from 0/000Km. to 13/800Km for 2020-21 in the district of Nuapada (Package No.OR-24-12).
Periodical Maintenance of 5 years completed PMGSY roads such as (A)L-43(Harachandi) to Sipasarubali(B)PWD road to Nishibaran and (C)NH-203A to Kahalapada under Package No.PM/PURI/31
Periodical Maintenance of 5 years completed PMGSY roads such as (a)Badaberana to Gomapur(b) Niamuhana to Goda via. Chhania(c)NH-224 to Dhanagar Nuagaon Sunalo under package No.PM/BBSR/40
Construction of Bridge over Baraghat Nallah at Ch. 5.70 Km on Lambsory PMGSY road to Dhanakhandi road Barapadar, Jharfesferdi (RD) road in the District of Boudh under BSY (Span 7 x 10.77m)
Annual Maintenance Plan for 5 years Completed PMGSY (POST DLP) roads such as (a) NH-5 to Sarapari Road and (b) NH-5 to Dixitpada Road under Package No. PM / BBSR / 75
Construction of Taradapada Kali temple to Purohitpur Sidhal PMGSY Road via Mohanty Sahi Nanda Gada road under Jspur block in the District of Jagatsinghpur under MMSY-TRIP for the year 2025-26
Construction of Road and Drain from Plot no 695-734 o Plot no 49, BJB Nagar in ward no-56
Construction of road with drain from Jitesh Agarwalla house towards Srikrishna temple via Jagat Agrwalla house in Ward No.20
Construction of road and drain from Kharakhia Baidyanath Temple to Amresh Mishra House Plot No. 1325 in Ward No. 60