Loading…
Loading…
3,49,568 results • Best match
Supervision and Quality Control Consultancy of Rural Roads being constructed under MPRCP, PMGSY, ADB and other schemes
Supervision and Quality Control Consultancy of Rural Roads being constructed under MPRCP, PMGSY, ADB and other schemes
Supervision and Quality Control Consultancy of Rural Roads being constructed under MPRCP, PMGSY, ADB and other schemes
Supervision and Quality Control Consultancy of Rural Roads being constructed under MPRCP, PMGSY, ADB and other schemes
Supervision and Quality Control Consultancy of Rural Roads being constructed under MPRCP, PMGSY, ADB and other schemes
Supervision and Quality Control Consultancy of Rural Roads being constructed under MPRCP, PMGSY, ADB and other schemes
Supervision and Quality Control Consultancy of Rural Roads being constructed under MPRCP, PMGSY, ADB and other schemes
Supervision and Quality Control Consultancy of Rural Roads being constructed under MPRCP, PMGSY, ADB and other schemes
SPECIAL REPAIR TO INTERNAL ROADS AT KARZU OFFRS MESS, 400 MTR ROAD FROM UNIT MAIN GATE JUNCTION TO JCO MESS AND INTERNAL ROAD AT LSRC UNDER GE 865 EWS
Renewal of BT Hot mix internal road from Seva Seva Enclave to Beside Padma pujitha sree nilyam apartment and internal roads in Matrusrinagar ward 86 Gajuwaka Zone VI GVMC
Construction of Road and Retaining Wall at Wagheri Internal Road Tal. Mahad Dist Raigad
CONSTRUCTION OF ROAD KAPASHI TO BHUYALPADA INTERNAL ROAD (GRAMPANCHAYAT KAPSHI) TALUKA DAHANU DIST PALGHAR.
Construction of road from Madhav Girane to ganesh Bhosale house internal road, Tal - Palghar.
Construction of Road In Prabhag 3 Sadanand Park Internal Road at Vaduj Tal-Khatav
Construction of Road from Link Road from Lower Menchu (PMGSY) Road via Pratap Primary School to Koti Khar Lower Menchu, Sakyong, Length 3.250 KM, within Kalimpong II Block, Gorkhaland Territorial Administration under RIDF XXIX
Widening and Strengthening of Road Kalpi to Badhauli via Nihoni, Tamnauli (T-01) in Saha Block, District Ambala) (PMGSY-III) Batch-II
RENEWAL OF GOVINDPUR LINK ROAD TO HARISINGH ROAD
Renewal of nahili to nagla mansha link road
RENEWAL OF NAGLA DUNDE TO TIKONA LINK ROAD
Improvement of road cut on Kanheli approach road from km. 0.150 to 2.500 in Rohtak Distt. (Road ID-1778)
Proposed Construction of Parking and Tourist Facilitation Centre at Namisharanya, Sitapur Link Road, Sitapur
CONSTRUTION OF LINK ROADS ON INTERNAL LINKS OF RAJPURA PANCHAYAT, CONSTRUCTION OF INTERNAL ROADS OF PANCHAYAT JASWAN AND KALYANPUR, CONSTRUCTION OF LINK ROAD FROM ARMY GROUND DOMANA TO VILLAGE FLORA INCLUDING LINK ROAD TO SHAMSHAN GHAT AT GUJJAR BAST
Construction of approach Road for MANAKOJI BODHALE MAHARAJ MANDIR and KALYACHA WADA at Dhamangaon Dumala Taluka Barshi Dist Solapur
Construction of Compound Wall Approach Road Paver Block Parking and Electrification At Achalbet Devsthan Turori Tq Omerga Dist Dharashiv
IMPROVEMENT OF ROHANA APPROACH ROAD ( WITH HOTMIX ) VR-19 KM 0/00 TO 1/500 TQ. D.RAJA DIST. BULDANA
IMPROVEMENT OF GARGUNDI APPROACH ROAD ( WITH HOTMIX ) VR-16 KM 0/00 TO 1/500 TQ. D.RAJA DIST. BULDANA
Construction of rain shelter cum bus stop at Chandiya village approach road, Tehsil-Bani, District-Kathua, JK (CSR-387).
CONSTRUCTION OF PENWCHI APPROACH ROAD TO RESEDENTIAL COLONY ROAD LENGTH 1.6 K.M. INCLUDING POLE SHIFTING UNDER SUB DIVISION SHUJALPUR
Construction of Approach Road and Protection Work on Kishni Bhanwat Mainpuri Aunchha Jasrana Road MDR 177W in Km. 9
C/o Of Approach Road To Mailgad At.Village G.P. Umapur Tq. Jalgaon Jamod Dist.Buldhana
Improvement to approach road Hardaf vr-39 km 2/00 to 4/00 Tq.Hadgaon
Annual Plan - Chowannur GP - 2023-24 - (P.No. 178/24) - Chowannur Parempadam Link Road Improvement Works - General Civil Work
Annual Plan-PROJECT NO-68/24-25-Khilariya Nagar -Masthigudda-Illayas nagar link Road Improvement-General Civil Work
Kalikkadavu Eravil Link road Improvement In Pilicode GP under Annual Plan 2022-23-PGP 112-General Civil Work
Annual Plan-PR. NO. 354/25 ARAYAL THARA THOTTY LINK ROAD IMPROVEMENT -PR NO 354-General Civil Work
Improvement of Road from Kartick Manna house to Mohesh Das house under Anandanagar G P
IMPROVEMENT OF ROAD FROM CATTLE POND TO SMASHANBHUMI AT VILLAGE JIGAON TQ. NANDURA DIST. BULDHANA
Repair of roads by pdg. RMC patch work, culvert repair and pot hole repair after monsoon in Dayalpur Ward No. 242, Shah(N) Zone
Constt. and Maintt. of Road L054-(Link Road) Kk road Km 14th to Nagarna Pkg No. JK17-4217, PMGSY-IV, Batch-I of 2026-27, Block-Thakraie, District Kishtwar (Using Waste Plastics -2.600) Length 2.600 Kms Adv. Cost excl. maintt. but incl. of GST
Construction of Road work from the house of Chandrama Yadav of village Sahroja to the Chittu Pali link road via House of Babban Yadav. (Length- 1500 m)
Repair of Road Work in Km. 65.400 to 67.400 2.00 Km. of Garh Town left out portion on NH30 Old NH27
VARANI ROAD WIDENING
Road widening works
Improvement of road work from fazalganj chauraha to bridge Under Ward-20 Zone-5
Improvement of road work from gauridham to kalpi road Under Ward-53 Zone-5
Improvement of road work from bholeshwar mandir to gurudwara Under Ward-07 Zone-5
RESURFACING OF ROAD
IMPROVEMENT TO APPROACH ROAD HULYACHIWADI KM 0/00 TO 3/00 VR-62 TQ LOHA DIST NANDED
Improvement to Tamgaon Approach Road Ch.No. 0/000 to 0/470. ( VR 47 ) Taluka - Sangrampur Dist. Buldana
SPECIAL REPAIRS TO APPROACH ROAD CHILPIMPRI VR-21 KM- 0/00 TO 2/800 TQ. MUDKHED DIST.