Providing civic amenities on the eve of Bonalu festival (2025) by Laying CC road at the approach road of Bangaru maisamma temple in Indira Nagar under Asif nagar-72, Mehdipatnam Circle-12, KZ, GHMC (Item No.6) (Reserved for SCs Reservation Only)
Laying of CC Patch from H.No: 20-5-588 to 20-6-106 approach road to Masjid-E-Takiya Zahoorsha in view of Ramzan in Gazibanda, Shalibanda div-48, Circle-09, CRZ, GHMC (Reserved For All SC Individuals/ Proprietorship Firms/Partner Ship Firms)
Laying of VDCC ROAD and Repairs to damaged catchpits on approach road to Osman-e-Ghani,Masjid-e-Jasmeen,Masjid-e-Heera khana, Masjid-e-Gulistan-e-Rahmat in view of Ramzan Festival 2021 under Golconda-67,Ward-9,Cir-13, KZ, GHMC
Providing street lights along the approach road from TSIIC boundary to R&B Sangem road, Trunk road from Chinthapally Railway Stn to Rainnikunta village and MR2 roads at Kakatiya Mega Textile Park, Shyampet(V), Geesugonda(M), & Chinthalapally(V), Sangem(M), Warangal rural District
Laying of Cc Road Widening from H.No. 3-7-270/1 to 3-5-309/3 Burial Ground Road and Church to 3-7-335/10/2/3 and 3-5-248 to 3-5-82 in Division No. 42 in Khammam Municipal Corporation
Shifting of 0.7KM 33KV, 1.56KM 11KV, 1.62KM LT lines present at left side of yellamma temple to DB Metal for road widening work carried out by R&B Department, Siddipet in Op. Section Siddipet Town-II, Siddipet town Subdivision of Siddipet Division and Circle
Laying of HDPE pipelines on the hyderbad road (right side) between from R&B culvert to kotirampoor in the balance portion of R&B road widening stretches under market reservior limits of Municipal Corporation, Karimnagar Estimate cost of Rs. 188.00 Lakhs Under CM Assurence Grants
Shifting of 0.8KM HT/LT line present at left side of OLD bus stand to kanchit 'X' Road for road widening work carried out by R&B Department in Operation Section Siddipet Town-III of Siddipet town Sub-division of Siddipet Division and Circle
Laying of HDPE Pipe lines on the Siricilla Road (Both sides) in the balance portion of R&B Road widening streches between Adepu Jairam Hospital & Geetha Bhavan Under Court Reserviour Limits of Municipal Corporation, Karimnagar Estimate cost of Rs. 93.50 under CM Assurance Grants.
Estimate for shifting of 2Km 11 KV & 2Km33KV line poles coming across road widening from pragnapur (V) to Jagadevpur road(V)in Gajwel Division in Siddipet Circle as per the request of DY. Executive Engineer (R&B) sub division Gajwel, under 100 % Contribution Works.
Shifting of HT and LT lines along the main road from Peerzadiguda Kaman to Old Municipal Office for road widening works in Peerzadiguda Municipality of Peerzadiguda Section in Ghatkesar Sub Division of Keesara Division in Habsiguda Circle under DC Works. (Reserved for SC Category)
Shiftng of 0.8KM HT/LT line present along the left side of Kanchit'X' Road to Musthabad'X' road for road widening work carried out by R&B department in Operation Section Siddipet TownIII of Siddipet town Sub-Division in Siddipet Division and Circle(Reserved For SC)
Laying of HDPE pipelines on the busstand road (both sides) between I town PS & Geeta bhavan chowrastha in the balance portion of R&B road widening stretches under market reservior limits of Municipal Corporation, karimnagar estimate cost of Rs. 175.40 Lakhs under C.M. Assurence Grnats.
Engage of Hitachi , Tippers, CC Breaking Machine and Cutter Machine for Dismantling of Road effected houses Both sides Ward No.25,33,32 and 29 in Road Widening Works From KDR Polytechnic College to LIC Office at Kurnool Road Under Municipal General Funds in Wanaparthy Municipality
Repairs and Maintenance to Internal Roads by Laying of Cement Concrete Roads alround the godowns, Removing of damaged AC Roof & Re-Roofing with 0.5mm thick Galvalume sheet to G.No.1,2, Repairs and Maintenance to G.No.1,2,3, Extension of Office Building and Construction of Parking shed to hamalies with toilets at TSWC Huzurabad, Karimnagar District
Laying of UGD line with 300mm dia from plot no 10 to plot no 40, plot no 60 to plot no 50, plot no 91 to plot no67, plot no 24 to plot no 18 and internal roads of sai colony,Gowlidoddi of ward no.105 Gachibowli, Circle-20, Serilingampally zone,GHMC (Item No.9)
Supply of Street lights, 3Cx2.5Sqmm Copper Cable, 6A 1P MCBs, HDPE Pipe, Automatic Street light controllers and Aluminium Lugs for providing street lighting from Main road to the entrance at CE-Type, SE-Type Quarters area and internal roads of CE-Type, SE-Type Quarters and Hostel building at Yadadri Thermal Power Station (5x800MW)
Laying of internal roads in Sesha Sai Nagar in Ward No.28-Uppal, Uppal Circle-9, GHMC
Beautification to the Newly erected Cental lighting Octogonal poles From Miyapur Metro Station (Mahindra Show Room) to Hyder Nagar Link Road in 123-Division , Kukatpally Circle-24, Kukatpally Zone, GHMC.
Engaging of Water tankers of Samantha nagar and Nizampet link road central median for (12) months in circle-24, Kukatpally, Kukatpally Zone, GHMC during the year 2020-21(1st recall)
Construction of Road Dam Across Stream along Allampally Gurrmadhira Road at Kaddam Mandal in Nirmal District
Balance work construction of Road from Nakkalapally to Thondalvai via sabbidigudem of Narketpally Mandal, Nalgonda District
Construction of Road from Kareemabad road (Flyover) to Gavicherla Cross Roads in GWMC under Smart City
Construction of Road Dam at Dumping Yard in Narayanpet Municipality under 14th FCG 2018-19 Grants.
Improvement of Road safety by providing guard railing and road safety measures in Km 510.0 to 524.0 on Pune Hyderabad section of NH 65 in the State of Telangana under Road Safety Annual Plan 2021 22
Improvement of Road Safety through provision of Vehicular Underpass and Service roads from Km 20.000 to 21 .150 on Hyderabad Bangalore section of NH 44 in the State of Telangana under NH O on EPC mode.
FDR-Package-1-HZB-repairs of rural roads (3 Works) in Huzurabad Mandal Est.Cost.36.10 Lakhs 1). Road from Chinnapapaiahpally to PWD in Huzurabad (M) of Karimnagar District Est.Cost.Rs.11.60 Lakhs 2) Road from Chelpur to Madipally in Huzurabad (M) of Karimnagar District Est.Cost.Rs.12.90 Lakhs, 3) Road from Thokalapally to Sirsapally in Huzurabad (M) of Karimnagar District Est.Cost.Rs.11.60 Lakhs
Package No.1 - Consists of 10 CC Road works with an Est. Cost Rs.45.00 Lakhs in Mandamarry Mandal of Mancherial District
Package No.2 - Consists of 10 CC Road works with an Est. Cost Rs.45.50 Lakhs in Mandamarry Mandal of Mancherial District
Package 1 BT Renewals for Road Works 03 Nos in Kandukur Mandal of RangaReddy District 2nd call Est cost Rs 438.00 Lakhs
Providing Car Parking, Road works, including Drain and Utility Works for the proposed Expansion of Centre for Good Governance (CGG) at Hyderabad.
SDPT FDR Package No 1 for Special repairs on 3 road works in Jagadevpur Mandal of Gajwel Assembly Constituency in Siddipet District
Package - 24 : Flood Damage Repair for Road works (02) No's. inIbrahimpatnamMandal of Ranga Reddy District.Package Estimated cost Rs.245.00 Lakhs-2nd call
Package No.SDPT.2 for 5 Road works of BT Renewal in Markook, Mulugu & Wargal mandals of Gajwel Assembly Constituency in Siddipet district
Package No.SDF-SDPT.3B for 17 Road works of BT Renewals in Chinnakodur & Nangnoor Mandals of Siddipet Assembly Constituency in Siddipet district
SDPT Package No 8 for 5 Road works BT Renewal in Cherial and Maddur mandal of Janagaon Assembly Constituency of Siddipet district
Package No.SRD.1 for 3 Road works of BT Renewal in Kandi, and Sangareddy mandals of Sangareddy Assembly Constituency in Sangareddy district
Package No.SDPT.7 for 8 Road works of BT Renewal in Chinnakodur & Siddipet Urban mandals of Siddipet Assembly Constituency in Siddipet district
PACKAGE NO.SRD.5 for 2 Road works of BT Renewal in Jharasangam and Kohir Mandal of Zaheerabad Assembly Constituency of Sangareddy District
Package No.SRD.4 for 2 Road works of BT Renewal in Patancheru and Jinnaram Mandals of Patancheru Assembly Constituency in Sangareddy district
Package No: BTR SRPT - SRPT-I (CONSISTING OF 06 road WORKS in Suryapet Constituency Estt Cost Rs. 1003.00 Lakhs under MRR grant)
Combined tender for 2 roads viz; i. Providing Renewal coat to the existing road from service road end point near Goleti township to Goleti cross road in Bellampalli area, Kumram Bheem Asifabad Dist., Telangana State. ii. Providing Renewal coat to the ... and Internal roads at ...
Package No. 4 (3 works) in Nallabelly mandal of Warangal district Pack EC Rs.426.00 lakhs 1) BT to R/F PR road to Lenkalapally via Anumulonipally EC Rs.119.00 lakhs 2) BT to R/F R&B road to Gunturpally EC Rs.147.00 lakhs 3) Improvements to internal roads...
LAYING OF SWG PIPELINE & CC ROAD FROM H.NO 2-10-592 TO H.NO 2-10-677/A AND H.NO 2-10-620 TO H.NO 2-10-612 AND H.NO 2-10-632 TO H.NO 2-10-629, H.NO 2-10-645 AND INTERNAL ROADS IN DIVISION NO 45, MUNICIPAL CORPORATION KARIMNAGAR estimate cost of Rs. 49.00 Lakhs
Formation of gravel road and laying of WBM road from H.No.55-4-539 to 55-4-445 & 55-4-494 to 55-4-324/3 and 55-4-880 to 55-4-511, 55-4-440 to Karimangar road, Mantrapuri colony internal roads at Bheemaram village in Division no.55 (Under General Fund) (Reserved for Waddera)
Laying of CC Road from NTR Statue to Telangana School and from 1-2-Ol004 to 1-2-77/1 and from 1-2-77/9 to Bye pass road (Arunachaleshwara School) and from Mutyalamma temple to Goutam Nagar Community Hall and internal roads at Indiramma Colony etc. in Ward No.3(reserved for SC contractor/firm)
Restoration & damaged road by laying CC Road at Vinayaka Nagar Phase -I, Rd. No. 32, Opp. Community Hall Main Road, H. No. 4-9-518/5, to 4-9-517/2 to Vinayak Nagar Colony 455/1, Plot No. 75 to 72 and internal roads at vinayak nagar Phase -I, Ward No. 12, Mansoorabad, Hayathnagar Cirlce -3, GHMC
ESTIMATE FOR 11.36 ACRES AREA BEAUTIFICATION WITH DEVELOPMENT OF GREENERY , CHILDREN EQUIPMENT ITEMS(FOR 4 NO'S TOTLOTS) AND GYM ITEMS IN 3 NO'S TOTLOTS AND PAINTING AT INTERNAL ROADS AND SCATTERED PLANTING IN ENTIRE AREA OF AHMEDGUDA 2 BHK HOUSING COMPLEX OF KAPRA , CIRCLE-1, OF LB.NAGAR ZONE, GHMC.DURING THE YEAR 2019-20. (RESERVED FOR SC , ST, WLCC'S SOCIETIES)
Improvements to Dichpally-Nizamabad road from km 12/4 to 14/4 in Nizamabad town limits in Nizamabad District with Municipal Funds (Sub-work:- Providing Road safety intervention on Link road)
Maintenance of the greenery under the park flyover at corridor no 23 old Bombay (Leather to Rd. No 45-link road steel bridge, Circle-18, Khairtabad Zone, GHMC for 12 months