Loading…
Loading…
1,04,030 results • Best match
Noorpur Nai Dilli Pal basti Link road km 2 me 2x3x3 mtr RCC Box culvert and Approach road in Distt Jaunpur
Construction of 3x5.00x5.00 mtr Minor Bridge (Box Culvert) and Approach road of Orai Churkhi to Riniya link road in Km -2
REPAIR OF THE APPROACH ROAD TO THE CAUSEWAY AND CONSTRUCTION OF A RETAINING WALL ON THE ITWAN TO SINGHAUTI LINK ROAD
Construction of 1x6 M Span RCC Box Culvert , Approach road and Protection Work on Gram Panchayat Maheshpur link road KM 2
Special Repair of Bridge and Approach road Situated on Tedhi River at km 3 of Jagtapur Link road in Distt. Gonda
Repair and protective works on the approach road to the minor bridge located at Km 02 of the Paigapur Link Road
Construction of Box culvert approach road and protective work of km-2 m span of Karaundi link road in Deoria district
Repair of Approach road and protection work of Minor bridge at Hadaha Khutha link road of Km 3 on Maurahi river
Repair of Approach road and protection work of Minor bridge at Kulwagadha Bethar link road of Km 4 on Local Nala
Repair work of the damaged culvert and approach road located at km 1 on the Nai Bazar Gayghat Daudpur link road
Construction of 3 Cell 3x3.00mtr Span Box Culvert, Approach Road Protection Work at Barahiya Link Road in Financial Year 2025-26
Protective work on the approach road of 2 x 5 meter span bridge located at kilometer 1 of Rakba Dulma Patti via Manjharia link road from Kushinagar district, Dumahi link road
Construction of Road From Khakshish to Dhanja via Mahatwani link road.
Construction of Road in Primary School Saibansa Block Manda Link Road
RENEWAL OF APPROACH ROAD TO ISAN NADI NEAR GULALPUR VILLAGE KM 1,2(500)
STRENGTHENING OF ROAD (P/L DBM , BC WORK 0N 75.00 MTR WIDE ROAD HANUMAN MURTI U-TURN TO DSC ROAD, SECTOR-50 AND 51 MANAV RACHNA SCHOOL TO SECTOR-50 VENDING ZONE, INTERNAL ROAD SECTOR-49 P/L BC ON INTERNAL ROADS IN SECTOR-41 AND P/L BC AND DBM ETC.
28 Block Gajraula in villege Moharka link road construction of brick soiling and culvert from kabrishtan to kankather railway station side damar road
S.R. work of 1-Hirasoti link road 2-Pakdiyar East Patti link road 3- Dudahi Barwa Patti to Gobarha 4- Khalwa Bedupar bridge approach road 5-Khudra link road 6-Latvajit link road 7-NH-28 Katharia 8-Dudhi Barwa Patti to Vichapatwa in Kushinagar by HMP
In district Bijnor at Goyali to Bhoorapur road Construction of Box Culvert at Paavdohi River and on its branch, approach road and additional approach road.
Km-1(500) of Sahasarai link road and Km.-1(500) of Hasanpur Sagoda link road. Repair and Renewal work in
CC ROAD CONSTRUCTION ON THE SHUKLAN PURVA LINK ROAD
CC ROAD CONSTRUCTION ON THE RAMNAGAR NISK LINK ROAD
Strengthening of Road (DGBM and BC work in 45.00m wide road between Sector-138, 90 and internal road Sector-90 and 138) Noida
Strengthening of Road(P/L DBM and BC work in Peripheral and Internal road in 5 PERCENT Abadi plot in Sector-45)Noida
Repairing and Maintenance of Link Road Gram Iteliya Baza Ka internal Road C.C. Work Under Mandi Samiti Rath.
C/o STP (R/o Internal road work at Sector-123) Noida
S.R. work of 1-Pagra Padri link road 2-Padrauna Kubersthan Turkpatti to Patehara link road 3-PMGSY to Basantpur Harichal Rai link road 4-Basdila Mahanth link road and 5-Rajapakad Karmaini km-6 to Saphi link road in Kushinagar district By HMP
Construction of CC road Work in Village Dharmai from field of Jawahar Lal Saraswat to Nagla Radhe Aswai Link Road.
Construction of CC road Work from Aatepur-Urawar Link Road (Bamba Culvert) towards Village Dohiya (house of Ajay alias Anna)
Construction CC road work towards house of Indra Kumar on Bamba track from Ukhrend Urawar link road in village Sujanipur.
Construction work of Machhandar Baba Palhari link road from Km 26 left of Bhadai Arar link road PMGSY via Kharwar Chero township under Kodai cluster
Reconstruction work of link road from village Barbai Tamora link road to village Chanikala Chanage 0.00 to 1.90 km.
Repair work of 4 x 27.00 m span long bridge and approach road located at Km-01 of Prajapatipur Mudadiha to Nakaha road (rural road)
Road Repair work on Chinhat-Juggaur Road to Nandpur Link Road KM-1
Improvement of road work from 13-block jhulela Under Ward-48 Zone-5
Improvement of road work infront prathmik swasthy kendra Under Ward-53 Zone-5
Improvement of road work Indian Oil to Nahar Under Ward-57 Zone-5
Improvement of road work from panki thana side Under Ward-57 Zone-5
STRENGTHENING OF ROAD( STRENGTHENING OF SERVICE ROAD AND DRAIN ALONG PLOT NO. 3CA SECTOR-129 ON 45.00M WIDE ROAD BETWEEN SECTOR-132 AND 129) NOIDA
Under District Bahraich, Construction of road from Gram Panchayat Revali Ghazipur link road to Marauthi link road, Lot No 2
General Repair and Renewal with PC on Badhahor PMGSY to Suresh Yadav of Homes link road
Jhakahiya Kathela PMGSY to Sonauli nankar ki basawat Baharandeeh link road via Gaurdeeh Km 1 (300)
Construction of Jariyari Me PMGSY Road To Anushuchit Basti Via Thakur basti tak Link Road (31)
SR Of Lumbani Duddhi Road Km-169 Hote Hur Ghurahupur Chauhan Basti to PMGSY Link Road
Jhakahiya Kathela PMGSY to Sonauli nankar ki basawat Malhadeeh link road via Gaurdeeh Km 1 (350)
Special Repair of Dariyapur PMGSY Road to Surwar Bujurg Chowdhary Choura Babaganj via Sheetalganj Link Road
RAMAVAPUR BELAWA PMGSY MARG KE KM 5 SE SEMARA KI BASAWAT BHARANVDEEH BHARDEEH TAK LINK ROAD.
SR of Ved bihari pokhra Rajwaha PMGSY road to Pratappur hote hue Gangauli tak link road
SR of suhaval PMGSY to sugawaliya hote huye malsa utarauli link road (Including 5 year maintenance)
Renewal of Link road from Badhni pitched road to Badhni PMGSY. (Lot No 60 of 94)