Loading…
Loading…
1,04,030 results • Best match
General Repair and Renewal with P.C. on PMGSY marg se raigatola link road (Plastic waste used)
Renewal of Dr Ram Manohar Lohiya digree collage to chouthi bandh Sagapali PMGSY tak link road
Renewal Work of Umri Manohar PMGSY Road ke KM-1 to Jhiriri Chauraha Tak Link Road.
Lot No 52 Renewal of Gopalpur Baranagar PMGSY Road to Bhadaura Hote Hue Jharkata Link Road
General Repair with renewal of PMGSY Road to Orgai Road via Naugaon Kushwaha Basti Link road
S.R of PMGSY Road to Domanpur Faiju Kha Ka Purwa Link Road under Isuli assembly constituency
Construction of PMGSY Road Bhatti To Pirupur Road KM 4 To Adampur Mushlim Basti Link Road
Renewal of Karmaini to Barwa Raja Pakad to Deoria Circle Link Road (PMGSY) in Dist Kushinagar
Spacial Repair with P.C. on Pokhara to Tendual link Road and 5x3.00M span Culvert (PMGSY Road) .
R.R. of Hasanganj to Sai River Bridge Add. Approach road in Km-7, Unchdwar Link road in Km-1, 2 ,3-750
Construction of 3x5 mtr. RCC Bridge approach road at NH28C to Tapesipah via durgapur Link road in Km. 1 at Natural Nala.
Construction 2x6.00 M Span R.C.C. Box cuvert and Approach road on Sarai Rajai Dhandar kol link Road KM-2 at Dhandar Nala
Construction of Karwi Devangana Hawai Patti approach road in Km-3 (Sonepur Hospital) to Kumiyan Tola Taraunha link road at distt Chitrakoot
Special Repair of Bridge and Approach road Situated on Tedhi River at km 5 of Ramapur Bangaon Link road in Distt. Gonda
Construction of 5X4.00X4.00 M Span RCC Minor Bridge and Approach Road on Neri-Sidhauli-Mehmoodabad Marg (Km-41) to Raghunathpur link road
Repair of Approach road and protection work of Minor bridge at Lala Kheda Shivrajpur link road of Km 1 on Local Nala
Repair of Approach road and protection work of Minor bridge at Satan Kharuli Ranipur link road of Km 2 on Maurahi river
Repair and protective work of the approach road of Faguia bridge located at km 02 of Allahnagar Faguia Dhobaha Ghat link road.
Construction work of 3x3.00x3.00 meter RCC box culvert and approach road on the drain of Gram Sabha Pyarepur Tendua Bhasada link road.
Construction of Box Culvert (5x5)Meter Span,Approach Road and Protection Work at Basahi Link Road KM-4 in Dist- Lakhimpur kheri.
Construction of 4 Cell 5X5 Meter Span Box Culvert and Approach Road On Shardanagar Canal Road to Gulripurwa Link road Km 01.
Construction of NH-27 to Gudariya ka dera link road work.
Parsiya to Adhmalpur Link Road Abadi Bhag me CC Road work
M/O Road (Construction of C C Pavement Roads in Block B and C internal Roads sector 19) Noida
Strengthening of Road (Resurfacing on 24.00M wide road from A-01 to India TV and Mastic work from Mahatma Gandhi Rotary, Hyundai Showroom T-Point, Illabans T-Point in Sector-85) Noida
Improvement of road, nali and Pootpath internal road of Kurmachal nager Liverty coloney sarvoday nager Ghosi purva Lal bahadur 2nd ward
Strengthening of road (P/L DGBM and BC on Internal road on P.K Pocket (5 Percent Abadi) and outer road in Sector-121) Noida
Strengthening of Road(C/o Service Lane Near Lotous Panchi Appartments and Improvement of BDS Markets and Other Internal Road in Sec-110)Noida
Improvement of road work from e-465 to 437 Under Ward-53 Zone-5
Strengthening of Road (Construction of RCC footpath and Central Verge work in Sector-84), Noida
RESURFACING OF ROAD UNDER AGE BR-I GE BABINA
Resurfacing of road in various place inside OCFS Factory
Construction of Remaining CC road Work in Village Sujanipur from Ukhraind-Urawar Link Road to house of Indra Kumar on Bamba embankment
Special Repair of Bahlolpur Tirauli SC Basti Link road
SPECIAL REPAIR TO APPROACH ROAD TO 194 MED REGT AND INTERNAL ROAD AT UNIT LOC OF 75 MED REGT UNDER GE (N) MEERUT CANTT
Repair and Renewal work in Km-1(600) of Ugoo Rural Road and Km-1(100) of New Kheda Link Road
CC ROAD CONSTRUCTION ON THE KHOHI TO KOLBASTI LINK ROAD
Road Construction Work 0f Daulatpur Link Road to Ghasiram Purwa
Maintenance of Road ( Improvement of Road Patries and Making Tree Thawla of Internal and External Road in Sector-116), Noida
Strengthening of Road (Repair of drain, Fixing of RCC Cover and P/L Interlocking tiles in Sector-140) Noida
Proposed Construction of Parking and Tourist Facilitation Centre at Namisharanya, Sitapur Link Road, Sitapur
RENEWAL OF GOVINDPUR LINK ROAD TO HARISINGH ROAD
Renewal of nahili to nagla mansha link road
RENEWAL OF NAGLA DUNDE TO TIKONA LINK ROAD
Construction of Approach Road and Protection Work on Kishni Bhanwat Mainpuri Aunchha Jasrana Road MDR 177W in Km. 9
Construction of Small bridges and approach road on Barshati Nala situated in km 2 of Jhabbapuri to Kunda link road in district Meerut
Repair of Sthaniya Nala 2x4 Meter Old Small Bridge Approach road on Kotwa Link Road Km 1 Vikas khand Bhetua in District Amethi
Repair and protective work of the approach road of the small bridge located at km 02 of the Chaidih Fakiri Bankat link road.
Construction of 3 Cell 3x3.00meter Span Box Culvert, Approach Road and Protection Work on Bhawanipurwa (Bhanpur) Link Road in Financial Year 2025-26.
Repair and protective work of the approach road of the small bridge located at km 02 of the Tedua to Rachhauda link road.