Loading…
Loading…
473 results • Best match
SPECIAL REPAIR/REPLACEMENT OF WATER SCADA SYSTEM INSTALLED AT AF STN SOHNA ROAD UNDER GE (AF) GURGAON
Design & Drawings for Installation of SCADA at SP & SSP. (As per Para-1 of Schedule-A attached.)
ANNUAL MAINTENANCE CONTRACT OF ELECTRIC PLC PANNEL OF CENTRIFUGAL MACHINES FOR THE SEASON, 2020-21
Two Years AMC for Honeywell make DCS and PLC installed at TPS, UCR and OMS
Rectification of existing PLC based AMF Panels for DG sets at unattended locations in NRPL
Design, supply, installation and comissioning of 3 nos plc based safety cap malleting units at Karnal BP
Piping and instrumentation work and all other works contingent thereto including Operation and Maintenance for 12 months during defect liability period after trial run of 3months and 5years thereafter in village Kohand Distt. Karnal
Defect Rectification work Obtaining of CTO and conducting 3 months of successful trial run including performance test results complying with HSPCB standard of 1000KLD sewerage treatment plant on turnkey basis based on sequencing batch reactor (SBR) ... with PLC SCADA system ...
Contract for the repair and maintenance along with testing and trials of Co-gen Plant automation (DCS-SCADA)
Custom Bid for Services - CRN 4200 CONTRACT FOR UPGRADATION OF STORM WATER PUMP HOUSE PLC HMISCADA
Non comprehensive Annual Maintenance Charge of projectile Velocity Measurement System supplied by MS instruments Plc. UK
Non Comprehensive Annual Maintenance Contract of 2 years for Triconex PLC at IOCL Panipat Naphtha Cracker.
Non Comprehensive Annual Maintenance Contract of 2 years for Triconex PLC at IOCL Panipat Naphtha Cracker.
Services for Integration of existing Rim Seal Fire Protection System PLC system with ABB make DCS
Repair and Overhauling Service - cars; REPAIR OF RESISTIVE DUMMY LOAD (PLC BASED) 600KW; Yes; Buyer Premises
based on Sequential Batch Reactor technology complete in all respect including disposal of treated effluent through RCC pipes NP-3 by gravity, storm water/sewerage system in plant campus, Staff quarters, approach roads, boundary wall, land scaping, M
Supply , Erection and Commissioning of Temperature Control Automation on Super Heated Wash water System for PLC machines.
Two years Annual Maintenance Contract (AMC) for Honeywell make DCS and PLC installed at PR and PNC
Replacement of SMPL PLC IO communication system from S908 coaxial bus with Ethernet based IO communication system
Supply, Installation and Commissioning of PLC IO panel for simultaneous delivery at Rewari for JPNPL and PRPL.
PABRA Providing and fixing of PVC PIPE Line From PlC CANAL TO BRAMANI AND SHERE WALA POND
Fan fail-temperature unit along with 1 meter sensor cable for PLC cabinet panel in BS plant
AMC of PLC Based cubical type synchronization Panel for DEA Sets for IDC at MTE DLF Faridabad
Aannual Maintenance Contract (AMC) for Modicon PLC installed in Raw Water Treatment Unit (RWTP) of UCR Area.
Annual Maintenance Contract for Siemens make PLC systems in Panipat Refinery for a period of 2 Years
Supply, installation, testing and commissioning of additional OPD (Open Path Detectors) in tank dyke along with new PLC and integration of existing HCDs with new PLC and allied cabling works along with 5 years CAMC after completion of warranty period
Custom Bid for Services - RPNC253013 Two year Annual Maintenance Contract for Field PLC installed at CMU PNC Item 10, Custom Bid for Services - RPNC253013 Two year Annual Maintenance Contract for Field PLC installed at CMU PNC Item 20, Custom Bid for ... Field PLC installed ... Field PLC installed ...
COMPREHENSIVE ANNUAL MAINTENANCE AND OPERATION FOR WATER SCADA SYSTEM INSTALLED AT AIRFORCE GURGAON UNDER GE (AF) GURGAON
ANNUAL MAINTENANCE CONTRACT OF TELEMETRY DATA AND REAL TIME MONITORING OF GRID CONNECTED RENEWABLE 24 MW GENERATOR WITH REQUIRED MATERIAL FOR THE SEASON, 2020-21 (MAKE ENERGY ELECTRICALS)
Establishment of main control room centre room at SDO OP DHBVN, Manesar for implementation of SCADA under IMT Manesar Area
Operation and maintenance SCADA based Automation and online Monitoring (existing) of Sewer waterdisposal at Ward No.39, Div-IV, Ballabgarh.
Operation and Maintenance of Existing SCADA System at JLN Canal Pumping Automation for a period of 2 years in Haryana
Supply and Commissioning of Automatic Computerized Rake Test Rig (SCADA BASED) as per ANNEXURE attached. Firm's offered Make/Brand- SELF.
Two years Annual Maintenance Contract for Honeywell make DCS and PLC installed in CPP at Panipat Naphtha Cracker
Work for providing Substation Automation System with software for 100MVA 220/132kV T/F T-5 with allied bays and configuration with local SCADA as well as SLDC at 220KV Substation, Mohana.
High Temperature Insulated Ovens (Q3), Automation System (Q3)
Operation and maintenance SCADA based Automation and online Monitoring (existing) of Sewer water disposal at Ward No.40, Div-IV, Ballabgarh.
Operation and Maintenance SCADA based automation and online monitoring (existing) of sewer water disposal at Ward No.37 Division IV Ballabgarh.
Operation and maintenance SCADA based Automation and online Monitoring (existing) of Sewer water Disposal in Ward No.38, Div-IV, Ballabgarh.
Supply Installation operation and Maintenance of SCADA system for JLN Canal Pumping Automation For IWRD Haryana under National Hydrology Project NHP
Custom Bid for Services - RPRC246315 Non comprehensive AMC for triconex PLC at Panipat Refinery Item 10 1st year PM Charges for PR, Custom Bid for Services - RPRC246315 Non comprehensive AMC for triconex PLC at Panipat Refinery Item 20 2nd year PM ... triconex PLC at ... triconex PLC at ... triconex PLC at ... triconex PLC at ...
Supply of Allen Bradley Micrologix PLC for DG AMF panel, its accessories and DC power supplies for NRPL Panipat.
AMC for Rockwell make PLC installed in DM plus TTPRO, SRU, PTA-ETP and CPP Units of Panipat refinery
Work for providing Substation Automation System with software for 100MVA 220/132kV T/F T-4 with allied bays and configuration with local SCADA as well as SLDC at 220KV Substation, Mohana. The 22
ALLEN BRADLEY - 1756-L81E, ETHERNET DUAL PORT MODULE, ALLEN BRADLEY - 1756-A13, CHASSIS POWER SUPPLY, PLC SLOTFILLER CARD, ALLEN BRADLEY - 1756- IB16, ROCKWELL CONTROLLOGIX RTB TERMINAL BLOCK, ALLEN BRADLEY - 1756-OB16D, ALLEN BRADLEY -1756-IF8, ALLEN BRADLEY - 1756-IF8I, ALLEN BRADLEY - 1756-OF8I, 36 PIN SCREW CLAMP, FLEX IO MEDIA ADAPTER, ETHERNET SWITCH, TESTING and COMMISIONING PANEL, Factory talk view SE Station, WORKSTATION PC, INSTALLATION COMMISSIONING SYSTEM COMPLETE UNIT
Installation and implementation of Supervisory Control and Data Acquisition (SCADA) in Solar Powered Integrated Micro Irrigation site of Kuhl Tapriyan, district Panchkula.
Repair and Overhauling Service - PLC CONTROLLED AUTOMATIC ENG COMPRESURE WASH UNIT; AS PER BUYER SCOPE OF WORK; Yes; Buyer Premises
Customized AMC/CMC for Pre-owned Products - PLC and BMS System of HVAC; Siemens; Comprehensive Maintenance Contract (CMC); Monthly; No
Re-Tender of Providing and fixing of PVC pipe line from pond to PLC canai at village chamar khera (ZP)
M9523626001N - DIGITAL O- P MODULE 1794-OB32P ROCKWELL, M9502626004N - ANALOG INPUT MODULE - 1794-IE8 - ROCKWELL, M9520626006N - DIGITAL I - P MODULE 1794-IB32 - ROCKWELL, M9571626003 - RTD I - P CARD ROCKWELL - FLEX I - O - 1794-IR8, M9516056083 - ... - PLC PROCESR ...