Loading…
Loading…
473 results • Best match
769 Designing Construction Fabrication Erection, Testing Commissioning of 2 Nos 250 KLD capacity PLC controlled MPS and Sewage Treatment Plant STP including with 5 years O and M at Village Bursham Block Israna Distt. Panipat.
Customized AMC/CMC for Pre-owned Products - RPNC265025 ANNUAL MAINTENANCE CONTRACT FOR EMERSON PLC SYSTEMS AT PNC COMPLEX FOR 3 (THREE) YEARS; M/s EMERSON AUTOMATION SOLUTIONS INTELLIGENT PLATFORMS PRIVATE LIMITED; Annual Maintenance Contract (AMC); ..
Custom Bid for Services - 25 26 1008 Annual Maintenance Contract AMC of Siemens make PLC system installed in B and P machines and Jumbo bag machine installed at Polymer Terminal Panipat Similar Category Support Services
33 kV Bay Creation along with SCADA Integration
Annual Maintenance of Water Supply Scheme 115 Nos. Census villages, District Mohindergarh. Operation and Mtc. of 2 Nos. Water Treatment Plant Unit 14.25 MLD 7.00plus7.25 capacity with SCADA system, pumping machinery of Raw water and Clear Water at Ca
768 Designing Construction Fabrication Erection, Testing Commissioning of 2 Nos 250 KLD capacity PLC controlled MPS and Sewage Treatment Plant STP including with 5 years O and M at Village Urlana Kalan Block Matlauda Distt. Panipat.
B2)-O and M of 21 MLD CETP (Ph.-II) in Sec-29 P-II, Panipat-with maximum disch. 21 MLD (appx.) with tertiary treatment, all Civil Works, EandM Installations, DMF with Online SCADA with PLC, Centrifuge, OMS, switch yards, valves, gensets, transformers
PLC 250mm SN8 DWC Sector-11, Panipat.
PLC of 300mm SN8 Sector-11 Panipat.
Annual Running Contract for Operation and Maintenance of Automated PLC controlled comprehensive Hydro Pneumatic both wet and dry and vacuum based Ash Handling System including Ash silos and Ash water recovery system of AHP RGTPP Khedar Hisar
Integration of 132 KV I/C of 220/132 KV 100 MVA T/F T4 and 33 KV I/C of 220/33 KV 100 MVA T/F T5 Bay with existing SCADA System at 220 KV Sub Station Batta
Conversion of Existing Overhead 11 kV and LT electric lines to trenchless underground 11 kV and LT cable system and installation of Compact Sub-Station (CSS), Ring Main Unit (RMU), Feeder and Service Pillars compatible with SCADA etc. from Meerut Cho
PF of testing and commissioning of online Ultrasonic flow meter 500mm dia and 700mm dia alongwith data transfer SCADA system Turbidity meter residual chlorine meter PH meter operation and comprehensive mtc for 2 years complete in all respect at 3
REFURBISHMENT OF WATER SUPPLY OF TYPE-II QUARTERS AT NSG MANESAR, GURGAON (SH:- EXTENSION OF EXISTING BD ELECTROCOM MAKE SCADA SYSTEM AND AUTOMATION WORK FOR WATER SUPPLY INSTALLED AT TYPE-II QUARTERS TO TYPE-III QUARTERS AT NSG MANESAR (BALANCED WORK)
Design Supply Installation Testing and Commissioning of 2x25kV 50Hz AC High Rise OHE Power Supply System and SCADA including ROCS in connection with laying of New BG Double Railway Line from Prithla to New Harsana Kalan Appx 320TKM of HORC Project
SCADA Integration of 100MVA 220 132KV T5 TF HV and LV bay in the existing SCADA system as well as with SLDC at 220KV station Chhajpur.
SUPLLYING INSTALLATION TESTING AND COMMISSIOING OF PUMP HOUSE PLANT AUTOMATIZATION AND MANAGEMENT SYSTEM WITH MICROPROCESSOR BASED CONTROL PANEL ONLINE MONITORING WIRELESS CONNCETIVITY WITH COMPLETE SCADA SOFTWARE AT PUMP HOUSES AT PUMP ROOM NO 5 AT OLD AND NEW RESDL COLONY NH IV FARIDABAD
Operation, running, Maintenance and watch and ward of PLC Operated 77 MLD (45MLD WTP plus 32 MLD WTP) including RW and CW pumping machinery and electrical equipments, Dosing of Alum, Dosing of Chlorine at Sector-1, Panchkula, including repair Sapr
REPAIR MAINT OF SPLIT WINDOW TYPE AV COOLING APPLIANCES AND AC PLANT 3X35 TR AT NTS AND REPAIR PERIODICAL SERVICES TO DG SET PCC 3.3 PLC APFC AMF PANELS AND OTHER CONNECTED WORKS AT NTS NCN UNDER GE AF GURGAON
Execution of SAS/SCADA Integration work of 132 KV and 33 KV Bays at 132 KV AIS Sub Station Hansi against the left out work to be executed departmentally at the risk and cost of M/s Gupta Industries Dehradun awarded on turnkey basis.
Supply of Software License keys of GE Make SCADA (KYB9) not supplied by the previous contractor M/s IKE Electric Pvt. Ltd. and integration of 33kV GIS, BCUs (ABB make) with GE make SAS at 220kV GIS S/stn. Roj-ka-Meo. (Against Risk Purchase).
Radaur Town Supplementary estimate for Renovation Upgradation of water supply UNDER AMRUT2.0 Laying of D.I pipe line, Providing fixing Functional Household Tap Connection,, IoT based Monitoring, Automation for existing 15 nos tubewells machinery etc.
Maintenance and repair -rectification of SCADA system at 220kV S-Stn. Chormar
Implementation of SCADA and DMS/OMS in Gurugram under RDS Scheme in DHBVN
Customized AMC/CMC for Pre-owned Products - Non- Comprehensive AMC of Safety PLC of ABB make and allied MB Lal works for 1 year at Rewari Terminal under Delhi State Office; ABB; Annual Maintenance Contract (AMC); As per scope of service in tender doc..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PLC Controlled automatic Eng Compressure Wash Unit; PLC Controlled automatic Eng Compressure Wash Unit; As per Scope of Work
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Automotive Test Agency; Upgradation of AVL Make Existing Engine Test Bed with PUMA Automation System (ETL-7); Service Provider
Prov. and fixing of level sensor measurement for SCADA operation in 7.50 MLD STP
Cyber Security Audit of SCADA andassociated Systems of NTAMC Upgrade Project during FAT and SAT
Supply of 24V/10A Power Supply/SMPS For ALLEN BRADLY PLCwith Rail Mount for NTPC Faridabad
Supply, Installation & Commissioning of PLC Based Auto Purging Unit at Piyala LPG Plant (Q3)
Supply, installation, testing and commissioning of SIL3 PLC based system and associated equipments f
Special repair of Misc. items at 9.50 MLD STP Kalanwali Town. Machinery and Scada System etc.
Integration of existing SAS I and II at 132kV Substation Dhudiyanwali with SLDC SCADA center Panipat
Integration of existing SAS I and II at 132kV Substation Khairekan with SLDC SCADA center Panipat
Integration of existing SAS I and II at 132kV Substation Kurangawali with SLDC SCADA center Panipat
Estimate for installation of gaseous chlorination system with automation system in 17 No Water Boosting Stations of Various Water Supply Schemes. i.e. Bhulwana, Pingaltu, Gorota, Maroli, Jalalpur Maufi, Dakora, Banswa, Aurangabad, Mitrol, Dee
E-TENDER FOR supply, installation, testing and commissioning of PLC based 3 head automatic evacuatio
Repair of old Water works, Const. of 8.00 MLD WTP scada based structures, Const. of S S tank Brick lining, Const. of 15.00 MLD WTP scada based, 3 no clear water tank, Raw water s s tank, pump chamber, Pumping machinery etc. work
Creation of 1 No. 132 Kv line bay at 132kV S-Stn Kurangawali to accommodate second ckt 132Kv Chormar- Kurangawali line- Work for SCADA integration of 132Kv Chormar- Kurangawali line bay second with existing SAS-1 and SAS-2 with SLDC SCADA Panipat.
Creation of one number 132 KV line bay at 220kV S-Stn Chormar to accommodate second ckt 132Kv Chormar- Kurangawali line - Work for SCADA integration of 132KV Chormar- Kurangawali line bay with existing SAS-1 and SAS-2 with SLDC SCADA Panipat
Implementation of SCADA and DMS/OMS works in Faridabad and periphery of Gurugram Under Revamped Distribution Sector Scheme (RDSS)
SCADA integration of 33 KV Dhottar bay at 132 KV S/Stn. Khairekan, District Sirsa - work for SAS integration
Expert Services of UOP India for troubleshooting and fine tuning of PSA PLC units installed in PRPC
PROJECT OF ETHANOL PRODUCTION FROM PSA OFF GAS OF HGU (76 and 77 UNITS) AT PANIPAT REFINERY PETROCHEMICALS COMPLEX
Supply, installation and commissioning of DWLRs with water quality probe and telemetry including security arrangements, establishment of data acquisition system and its maintenance for real time ground water monitoring.
Estimate for installation of gaseous chlorination system with automation system in 11 No water Boosting Stations of various Urban water supply schemes Hodal Town Garhi Patti Bedha Patti. Under PHED No.3 Palwal Distt. Palwal. Urban WS 4215 0
Bay integration of 132 KV Sitamai-Kaul Ckt-II and 33 KV Chakda feeder with SCADA at 132 KV Substation sitamai
Design Supply installation AND commissioning of SCADA system for data transfer of Sealing machine RQC VCWE Purging etc at Karnal BP
SCADA integration of 100MVA, 220-33kV T-F bay with existing 220kV bus bar protection system at 220kV S-Stn. Chormar