Loading…
Loading…
3,487 results • Best match
Repairing /reconstruction of damaged approach road near inlet chamber of Yamuna Vihar STP PH-II.
Repair and strengthening of RCC platform of 37 MGD plant at Okhla STP. (RE-Invite)
Repair / Renovation of air flow system at Aeration of 20 MGD STP Keshopur. (Re-invited)
Improvement and maintenance of STP water lines under network No.1 to 4 in Dwarka.
Removal of Blockage of effluent channels emanating from Kondli STP to Ashok Nagar (Re-Invite)
SH Operation and comprehensive maintenance of Taurace make STP Plant system based on MBBR Technology
Running Maintenance and Operation of STP and RO System at NSSC Jasola and Sukhdev Vihar.
Deployment of staff for operation and minor maintenance of 40 MGD STP Keshopur (RE-Invited).
Hiring of Excavator Loader and dumper for shifting of material and Grit at STP Okhla.
Repairing of Secondary Clarifier No. 2 and other allied works at 16 MGD STP Okhla.
Hiring of Excavator Loader and Dumper for shifting of material and Grit at STP Okhla.
SITC of 03 Nos. motor starter panels at aeration chamber of 12 MGD STP Okhla.
Supplying and Applying of DJB STP Water in the park through water tanker at site.
Engagement of Contractual staff of operation and maintenance at Vasant Kunj 3 0 MGD STP
Running Maintenance and Operation of Swimming Pool, STP and RO System at Dwarka Sector-17.
Improvement of standard make APFC Panel installed at Phase I and II STP Coronation Pillar
Providing/ fixing of lighting system of bar screen (New room) at 45 MGD STP Okhla.
Renovation/Strengthening of FST (Final Settling Tank) with allied works at 12 MGD STP Okhla.
Renovation/ Strengthening of PST No. 2 with other allied works at 16 MGD STP Okhla.
SITC of main LT panel of Return Sludge Pump House at 37 MGD STP Okhla.
Repairing of Helical Gear Box Aerator No. 16 and 19 at 16 MGD STP Okhla.
Renovation/Strengthening of PST (Primary Settling Tank) with allied works at 12 MGD STP Okhla.
S/I/T/C of CCTV surveillance system in Lab and Dispensary at STP Okhla.
Providing/ fixing of Cable Trays and Clamps at Aeration unit of 45 MGD STP Okhla.
Hiring of Excavator Loader and Dumper for shifting of material and Grit at STP, Okhla.
Repairing of Control panel for aerators installed at aeration unit of 16 MGD STP Okhla.
Deployment of staff for running, operation and maintenance of Effluent Pump House at STP Okhla.
Improvement of power factor with allied works in APFC panel of 37 MGD STP Okhla.
Repairing of leakage of 300 mm dia Raw Sludge Line of 45 MGD STP Okhla.
Hiring of Excavator loader and Dumper for shifting of material and Grit at STP, Okhla.
Renovation/Strengthening of grit removal unit with allied works at 37(15) MGD STP Okhla.
Engagement of un-skilled staff for cleaning of bar screens at 12,37,45,16 MGD STP Okhla.
Running Maintenance and Operation of STP and RO System at Dwarka Sports Complex Sector-17
Deployment of staff for running, operation and maintenance of Effluent Pump House at STP Okhla.
Operation and Maintenance of existing HDPE STP Water Pipeline from Jasola Village to Sarita Vihar
SITC of digital water level indicator at SPS Sector -26 Rohini
Deployment of staff for operation and minor maintenance of Eand M equipment at Sector -26 SPS.(Re-invite)
Improvement of power factor at Sec.23 SPS, Rohini
SITC of static capacitor Banks for 11/3.3KV 2000 KVA Transformers at Sec-35 SPS, Rohini.
Deployment of staff for operation and maintenance work at Sec-25 SPS
Deployment of staff for operation and Minor maintenance of EnM equipments at SPS Sector-35 Rohini Re-invite
Deployment of staff for operation and Minor maintenance of EnM equipments at SPS Sector 25 Rohini, Barwala SPS and Raja Vihar SPS
Repair Renovation of NRV of set no. 3 and set no.6 and set no.4 installed at Sec-23 SPS, Rohini
Supply and installation of varous sign boards at SPS Sec-35 and SPS Sec-23 Rohini.
Deployment of staff for operation and maintenance work at Sec 23 SPS
Repair Renovation of WH Bready make EOT Crane at Sec-25 SPS, Rohini
Repairing of dismantle joint of 450mm dia. Set no. 05 at Rohini Sector 23 SPS Re-invite
Repair Renovation of Johnson make 2 nos Bar screens and filling of gap between screens and wall at Sec 35 SPS, Rohini
Repair Renovation of 06 nos . existing 90 KVAR fixed capacitor banks of make standard Capacitor at SPS Sector -26 Rohini .
Deployment of staff for operation and maintenance work at Sec-23 SPS