Loading…
Loading…
836 results • Best match
Operation and Maintenance STP for 1 Year
CONST OF WALL AT STP W.NO. 01
De silting of Pond Adjoining with STP
STP Ami Chand PKG-3 Patr-B
Rehabilitation of 11 MLD STP at Kharar
Protection to boundary wall near IWD STP
Rehabilitation of 04.00 MLD STP at Banur
STP raising the boundary of the roadside ditch
Construction of Pulli Near STP at MC Garhdiwala
Providing lining to the package unit STP (80KLD)
Repair of 11 KV VCB in STP Jamalpur.
Construction of STP 2.00 MLD at Hariana Town.
Repair of 120 HP motor at STP Jamalpur.
Construction of STP 3.00 MLD at Rahon Town.
Providing lining in the STP tanks (120 KLD)
Construction of STP 3.00 MLD at Rahon Town
Construction of STP 0.5 MLD at MIGC Raikot
Construction of STP 3.00 MLD at Garhshankar Town
Annual Maintenance of 25 MLD STP M.C. Kapurthala.
Construction of STP 3.00 MLD at Garhshankar Town.
Construction of STP 2.00 MLD at Garhdiwala Town
Construction of STP 4.00 MLD at Balachour Town
Annual Maintenance of 25 MLD STP MC Kapurthala.
Construction of 0.5 MLD STP at MIGC Tanda
Earth filling at Bain site from STP N.P.Bholath
Providing and fixing Pavers in STP at Nangal
Repair of 90 HP motor at STP Jamalpur.
Path leading to STP (Hostel 6 and 8)
10 KLD STP PLANT AT BHATINDA LPG PLANT
Rehablitation and Repair of STP MPS at Zirakpur
Pr./fx of Fire Hydrant at STP Plant
Annual Maintenencae of 25 MLD STP MC Kapurthala
Special Repair of 27 MLD STP based on SBR Technology Mechanical, Electrical and Instrumentation, Components and all other woeks contingent thereto complete and cons. building of store for STP 27 MLD STP at Bukanwala Road Moga
Const. of Composting Centre at Basti Peer Daad STP.
Supply of Manpower for STP, IPS and water works
Construction of Street from STP Road to Ropar Road
Operation Maintenance of STP 8 MLD Capacity at Zira
Air Blower Pipe at 25 MLD STP, Abohar Town
Construction of Metalled Road of Main STP Road, Hoshiarpur
Supply of Labour for STP Plant for one year
Annual Maintenance of 25 MCD STP at MC Kapurthala.
Construction of MRF Shed near STP at MC Patti
O and M of 4 MLD STP at Banur
Operation and Maintenance of 4 MLD STP MC Derabassi.
REPAIR OF STP MACHINERY AND OTHER WORK, ADHRERA ROAD
Rehabiliation of 5.5 MLD STP at Morinda Distt Ropar
Laying of UGPL HDPE mm for utilization of treated wastewater from STP Mahilpur and Construction of RCC Sumpwell and Pump House with all electric motors and other electric works
Supply installation operation maintenance of ERP Remote Online Monitoring software for integrating multiple PLC based STP on a single portal and monitoring their performance For 50 MLD STP SBR Technology Bhattian 105 MLD STP SBR Technology Balloke 3
Combine the Electrical connections of 25.00 MLD STP, 12.00 MLD STP, Primary Disposal and Soil Conservation in the premises of 25.00 MLD STP at Village Kumbhra and all other works contingent thereto at Mandi Gobindgarh District Fatehgarh Sahib.
Running and Maintenance of 10 MGD STP at Sector 83, S.A.S.Nagar from 01.05.2023 to 31.03.2024 or whenever new STP becomes operational (whichever is earlier)