Loading…
Loading…
836 results • Best match
Operation and Maintenance of 15 MLD Sewage Treatment Plant including O and M and Rehabilitation of Excisting Main pumping Station at Basti Peer dad , Jalandhar O and M of Civil, Electrical, Mechanical and Horticulture for five years UNDER AM
DNIT FOR OPERATION AND MAINTENANCE OF 95 MLD SEWAGE TREATMENT PLANT AND MAIN PUMPING STATION AND 2 NOS INTERMEDIATE PUMPING STATIONS BASED ON ACTIVATED SLUDGE PROCESS TECHNOLOGY NORTH ZONE YEAR 2024-25 01-05-2024 to 31-03-2025 11 MONTHS
Operation and maintenance of 08 MLD sewage treatment plant based on SBR technology in BBMB colony at Talwara Township during the year 2025-26 01 04 2025 to 31 03 2026 or from the date of actual start of work
OUTSOURCING FOR MAINTENANCE AND OPERATION OF SEWAGE TREATMENT PLANT PUMP SET AT PUMP HOUSE NO 4 AT KANDRORI AND PUMP HOUSE NO 7 AND 10 AT KAUNTERPUR AREA AND PUMPSETS DG SETS AT PUMP HOUSE AND SEWAGE PUMP HOUSE UNDER GE S PATHANKOT
Hiring of Consultants - Milestone/Deliverable Based - Site survey of Provision of Md Accn Offrs JCOs and OR Provision of Sewage Treatment Plant for Suri Envlave Provision of Solid Waste Management Plant and Provision of UG Ops Room at Mil Stn Beas; G..
Providing and laying of High Density SEWAGE TREATMENT PLANT LALRU
Operation and Maintenance of Sewage Treatment Plant 16MLD Capacity on SBR Technology at Jagraon for the period of 01.09.2020 to 31.03.2021 for 7 Months
Survey, Soil Testing, design, Supply and Construction, Installation, Commissioning of 2.00 MLD Capacity Sewage Treatment Plant cum upto 5 KLD FSTP at Sri Kiratpur Sahib District Ropar based on open technology including other appurtenant works on turn
DNIT of the Special Repairs of Civil Mechanical Electric Instrumentation at 95 MLD STP AND IPS North Zone at Amritsar At Risk and Cost of Ms SPCL Mumbai
Construction of 50 MLD Sewage Treatment Plant (STP) and Providing and Fixing of 3 Nos Horizontal Split Casing Centrifugal Pumping Sets Electrical Panel etc in Existing Main Pumping Station (MPS) Near Village Khapper Kheri in South Zone including its
Operation and Maintenance of Sewage Treatment Plant 7MLD capacity on SBR Technology at Sahnewal Town for t he year 2023-2024 period 01.09.2023 to 31.03.2024
Operation and Maintenance of Sewage Treatment Plant 16MLD capacity on SBR Technology at Jagraon for the year 2021-2022 period 01.07.2021 to 31.03.2022 for 9 months
Operation and Maintenance of Sewage Treatment Plant 16MLD capacity on SBR Technology at Jagraon for the year 2023-24 period of 01.04.2023 to 31.03.2024 for 12 months
Repair and Servicing of OCMS at sewage treatment plant under GE (W) JRC
Part-A Prov. Sew. Sch., restoration of Roads, Const. of MPS, STP cum FSTP, R/main and Offtake chamber at Bilga Town Distt. Jalandhar (under Swachh Bharat Mission 2.0). Part-B STP 1 No. capacity 2.00MLD cum 6KLD FSTP.
Part-A Prov. Sew. Sch., restoration of Roads, Const. of MPS, STP cum FSTP, R/main and Deep Manhole cum screening chamber at Bhogpur Town Distt. Jalandhar (under Swachh Bharat Mission 2.0). Part-B STP 1 No. capacity 4.00MLD cum 12KLD FSTP.
Construction, Supply Installation AND Commissioning of Sewage Treatment Plant of 2 MLD Capacity based on Conventional Extended aeration Technology at Raja Sansi Town Distt Amritsar and all other works contingent thereto including 5 year operatio
STP KAPURTHALA REPAIR WORK
Design, Construction, SITC of Sewage Treatment Plant of Capacity 250 KLD based on MBBR Technology including Operation and Maintenance of three years after successful trial of three months at District Jail Roop Nagar
PROVIDING AND INSTALLATION OF PUMP AND MOTORS DI K7 PIPE DRYING SLUDGE PLATEFORM AND ALL OTHER WORKS CONTINGENT THERETO UNDER SPECIAL REPAIR AT 95 MLD SEWAGE TREATMENT PLANT NORTH ZONE GAUSABAD AT AMRITSAR
SEWERAGE SCHEME and SEWAGE TREATMENT PLANT FOR 60 MONTHS AFTER COMMISSIONING IN VILLAGE GHUMAN DIST GURDASPUR
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Residential; Sewage Treatment plant; Service Provider
Main Pumping Station Sewage Treatment Plant in Various Station (MPS Jabbowal and Machhi Jowa at Sultanpur Lodhi) at Under Division No.2 Jalandhar
Operation and Maintenance of Sewage Treatment Plant 7MLD capacity on SBR Technology and Main Pumping station 40MLD Disposal Works at Sahnewal Town for the year 2024-25 period 01.04.2024 to 31.03.2025 for 12 month
as per title
Design Constn SITC of Sewage Treatment Plant of Capacity 250 KLD based on MBBR Technology including Operation and Maintenance of three years after successful trial of three months at High security Prison Village Gorsian Kadar Baksh, Ludhiana
Augmentation Upgradation Retrofitting of existing UASBR based Sewage Treatment Plant 0.75 MLD to 1 MLD on MBBR Technology and Construction of ETP for 20 bedded hospital at CRPF GC Sarai Khas Jalandhar Operation and Maintenance SH Providing Services of office Attendant MTS Computer Operator and Motor lorry driver for site inspection vehicle etc in JSD 1 at CRPF Campus Sarai Khas CPWD Jalandhar
Custom Bid for Services - Operational cost of ACWP plant at ASR, CIA (Per Coach Rate), Custom Bid for Services - Operational cost of ACWP plant at FZR (Per Coach Rate) Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant ... Effluent/ Sewage Treatment Plant
REPAIR OF SEWAGE TREATMENT PLANT AND CHLORINATION SYSTEM AT NO. 01 AREA INCLUDING CONNECTED ITEMS AT AIR FORCE STATION PATHANKOT
DNIT for Providing Sewer, Construction of Main Pumping Station, Restoration of Roads, Rising Main DI K9 and 6 MLD STP Cum 18 KLD FSTP etc Proven Biological Technology Complete in all respects and all other works contingent thereto at Jandiala Guru
SUPPLYING OF TWO NO ROBOT INCLUDING 05 YEARS ANNUAL MAINTENANCE FOR FAECAL SLUDGE MANAGEMENT DE-SILTING AND CLEANING OF SEWERAGE MANHOLES FOR RURAL SEWERAGE SCHEMES OF DISTRICT SRI MUKTSAR SAHIB
Part-A - Providing Sew. Scheme Const. of MPS, STP (2.00MLD), R/Main and Deep Manhole cum Screening chamber at Alawalpur Town Distt. Jalandhar (under SBM 2.0). Part-B - Const. of 2.00MLD STP cum-FSTP 6KLD capacity.
Construction of boundary wall around sump well and motor room at STP makhu with main door
Providing and Laying Sewer work and Construction, installation, Commissioning of 3 MLD Capacity STP cum 9 KLD FSTP at Badhni Kalan Distt Moga Under SBM-2
Providing and Laying Sewer work and Construction, installation, Commissioning of 3 MLD Capacity STP cum 9 KLD FSTP at Kot Ise Khan Distt Moga Under SBM-2
Survey, Soil Testing, Design, Supply and Construction, Installation, Commissioning of 3 MLD STP cum 9 KLD FSTP, RCC NP3 Sewer and MPS at Dhanaula under SBM 2.0
As per tender document
Comprehensive Annual Maintenance (CMC) and operation of 20 KLD SBR Technology- Sewage Treatment Plant cum Effluent Treatment Plant for CIAB at Sector-81, Mohali
Providing Installing and Commissioning of Online Continuous Monitoring System for Parameters COD BOD TSS and PH including real time data transmission at CPCB PPCB server with calibrations services Complete in all respect as per requirement of CPCB PP
Prov. Inst. and Commissioning of OCMS for Parameters COD, BOD, TSS and pH, including real time data transmission at CPCB/ PPCB server with calibrations services, complete in all respect as per requirement of CPCB/ PPCB including OandM for 12 months.
Main Pumping Station Sewage Treatment Plant in Various Station (MPS at 8 MLD North, 20 MLD North, 8 MLD South Phagwara, 2.6 MLD North, 3 MLD South Phillaur, Goraya, Bholath, Begowal and RCF Kapurthala) at Under Division No.2 Jalandhar
Supply, Installation, Commissioning and Maintenance of Pumps and Motors at Irrigation Projects from Sewage Treatment Plants along with electrical panel and components complete in all respects at various locations in Punjab State.
Construction, Installation, Commissioning of 2.00 MLD STP cum FSTP at Bhadson based on any suitable sustainable and proven technology including other appurtenant works on turnkey basis as per DNIT including Operation and Maintenance for 60 months
Prov and Laying Sew. Const of MH Chambers, Intake Chamber/MPS including Pumping Machinery Pipes and Specials Rising Main Hatch Box Vertical Shaft and Const. of 2.50 MLD STP Cum FSTP (06 KLD) based on any Proven tech.at Devigarh
Providing and Laying of RCC NP-3 pipes Sewer, UPVC pipe sewer, Rising Main and Construction of MPS, STP cum FSTP and all other works contingent thereto complete in all respects at Kot Shamir Distt. Bathinda. (Under SBM 2.0)
Desilting of STP
Material for STP
STP 1.5 HP 150 INCH, STP 1.5 HP 125 INCH, STP 0.75 HP 125 INCH
Operation and Maintanance of sewage treatment palnt of 7.00 MLD Capacity ( MBBR Technology) at Gidderbaha for 16 Months 11 Days period 20.11.2025 to 31.03.2027