Loading…
Loading…
836 results • Best match
Const. of Sewage Treatment Plants STPs Pumping Stations, ETPs for Dairy Complexes Rehabilitation of existing STPs and Main Pumping Stations for abatement of pollution in Buddha Nallah Ludhiana including O and M for a period of 10 years on DBOT basis
As per tender documents
Air Purification for STP
Fencing of new STP
Irrigation project STP Devigarh
Irrigation project STP Amargarh
Irrigation project STP Bhadson
Const, inst, comm of 12 MLD STP cum 24 KLD FSTP at Mandi Gaobindgarh based on any suitable, sustainable and proven technology including other appurtenant works on turnkey basis as per DNIT. Including O and M for a period of 60 months.
Construction of MPS along with O and M for 60 Months, Main Sewerage Scheme and Construction of 1.00 MLD Capacity STP cum 3 KLD FSTP along with O and M for 60 Months after stabilization at Nadala Town Distt. Kapurthala under SBM 2.0
Prov. Lay. RCC NP 3 pipe sewer Const. of MPS Intake Chamber Brick Masonery MH Chamber Road Cutting and Restoration and Const. and O and M of 3 MLD STP and FSTP all other works contingent thereto at Mahilpur Town under SBM 2
Construction of MPS along with O and M for 60 Months, Main Sewerage Scheme and Construction of 2.00 MLD Capacity STP cum 6 KLD FSTP along with O and M for 60 Months after stabilization at Dhilwan Town Distt. Kapurthala under SBM 2.0
Providing and Fixing OCEMS For STP and open chanel Ultrasonic Flowmeter at outlet of STP
Construction of 1 MLD STP at MIGC Malout and 1 MLD STP at IFP Abohar
Annual Maintenance of Modular STP
Construction of Pulli near STP
Sew.Sch and STP at Mudki
150 KLD modular STP (Q3)
STP 4MLD Irrigation Project, Sirhind
Providing Sewerage Scheme, Screening Chamber, Rehablitation of RCC P1 Rising Main Including Rising Main, DI K9 Pipe, Main Pumping Station and 2 MLD STP Cum 6 KLD FSTP A Complete in all respects and all other works contingent thereto at Khemkaran
STP 0.75 HP 125 INCH, STP 1.5 HP 125 INCH, STP 1.5 HP 150 INCH Bidder Turnover (Last 3 Years) 759 Lakh (s) Experience Criteria 3 Year (s)
Providing and laying of High-Density Polyethylene pipeline Dia 355 200mm, PE-80 4 Kg/ cm2 working pressure as per IS 4984-1995standards including all allied electrical and civil electrical and civil works with material as per DNIT from Sewerage Tre
Replacement of Rising main from MPS to STP and STP to Drain at Bareta distt. Mansa
P L of Inte and Dive Sewer Const of Manhole Chamber Const of IPS Construction of MPS Laying of Rising main Dera bassi Part A Const of STP 3.00 MLD 3.50 MLD and 7.50 MLD including FSTP 9 KLD 10.50 KLD and 22.50 KLD Dera bass
S/O 1 STP Operator, 3 STP Operator Helper, 2 Bill Distributer through contractor for 1 year.
P/L of Intercepting and Diversion Sewer Const of IPS Const of MPS Laying of Rising main and all other works contingent thereto in Lalru Town Distt S.A.S Nagar SBM 2.0 Scheme Const of STP 3.00 MLD and 3.50 MLD including FSTP all other work conting
Cleaning of Silt in STP Drains
Providing lining to the STP (80KLD)
Construction of Boundary Wall of STP
Const. of STP road, M.C. Zirakpur.
Providing Sewerage and STP at Mamdot
Rehabilitation of 8 MLD STP 5 MLD STP Barari and Disposal works all other works contingent at Nangal
PROVN OF OUTSOURCING OF MANPOWER FOR MANNING AND OPERATION OF STP GURNAM SINGH ENCLAVE STP BADLU SINGH ENCLAVE AND STP PIRU SINGH ENCLAVE UNDER GE UTILITY AT BATHINDA MIL STATION
a period of Sixty Months after stabilization period of Three Months and all other contingent thereto at Dina Nagar Town Distt Gurdaspur
Prov and Laying of Sew UPVC and RCC NP3 With HDPE Lining and Rising main Pipe Line DI K9 Const of MH Hatch Box MPS IPS Intake Chamber and STP 2 MLD with 6KLD FSTP and Sixty Months O and M works at Narot Jaimal Singh Town District Pathankot
Prov and Laying of Sew UPVC and RCC NP3 With HDPE Lining and Rising main Pipe Line DI K9 Const of MH Hatch Box MPS IPS Intake Chamber and STP 5 MLD with 15 KLD FSTP and Sixty Months O and M works at Sujanpur Town District Pathankot
Prov. and Lay. Cutting, Jointing and Testing of 500mm and 400mm i/d RCC NP-3 S and S Pipe Inside HDPE lining, 200mm, 315mm o/d upvc sewer, construction of brick masonary manhole chamber, mps and 4 mld stp cum FSTP 12 KLD at Rayya Distt. ASR
CP-PLUS Cat-6 STP for CCTV
DIGILINK (SCHEINDER) Cat-6 STP for CCTV
CP-PLUS Cat-6 STP for CCTV
NETWORK CABLES Cat-6 STP for CCTV
SUPPLY OF OPERATOR AND HELPER FOR STP