Loading…
Loading…
836 results • Best match
Annual Operation and Maintenance of Sewage Treatment Plant at SGRDJ International Airport, Amritsar for 02 years (2022-24).
Operation and maintenance of 0.2 MLD capacity Sewage Treatment Plant for Power Colony-1 Patiala for three years.
DNIT for Constuction of 30 MLD Sewage Treatment Plant STP MPS including its 5 years O and M and 1600mm dia outfall sewer at Batala town UNDER AMURT
CONSULTANCY SERVICES FOR PROVISION OF SEWAGE TREATMENT PLANT AND PREPARATION/ DESIGN/ UPGRADATION OF SEWAGE NETWORK AT UNCHIBASSI
Operation and Maintenance of Sewage Treatment Plant of 16 MLD capacity on SBR Technology at Jagraon (01.04.2024 to 31.03.2025)
Operation and Maintenance of Sewage Treatment Plant of 27 MLD Capacity at Bukanwala Road at Moga (01.04.2024 to 31.03.2025)
Operation and Maintenance of Sewage Treatment Plant 10 MLD Capacity on SBR Technology at Samana period (01.04.2026 to 31.03.2029).
Upgrading 1 no STP 1 no ETP and Supply erection commissioning of 1 Sewage Treatment Plant STP with Phytoremediation with warranty period of 2 years of STP of capacity 10 KLD in 8 hours at Indane Bottling Plant Bhatinda
Providing, Installing and Commissioning of Online Continuous Monitoring System complete in all respects at 06 Nos. Sewage Treatment Plants in Ropar Division.
SURVEY, SOIL, TESTING, DESIGN, SUPPLY AND CONSTRUCTION, INSTALLATION, COMMISSIONING OF 2.00 MLD CAPACITY SEWAGE TREATMENT PLANT CUM 6 KLD FSTP AND RISING MAIN AT AMARGARH BASED ON ANY SUITABLE TECHNOLOGY AS PER APPROVED DNIT.
DNIT for Operation and Maintenance of Sewage Treatment Plant of 4 MLD Capacity at Banur for the year 2020 2021
Operation and maintenance of Sewage treatment plant having 0.2MLD capacity based on MBR technology for Power Colony No. 1, Patiala
Survey Soil testing design supply and construction installation and Commissioning of Sewage Treatment Plant of 3 MLD Capacity at Amloh
CONSULTANCY SERVICES FOR PROVN OF 200 KLD SEWAGE TREATMENT PLANT AT BHADURIYA COMPLEX AND CONSULTANCY SERVICES FOR REPLACEMENT OF 360 KLD BER STP WITH 600 KLD CAPACITY STP AT 167 MH DHANGU UNDER GE (SOUTH) PATHANKOT
Providing Installing and commissioning of Online continuous Monitoring System complete in all respects at 10 No Sewage Treatment Plants at Patiala Circle PWSSB
DNIT for Survey, Soil Testing, Design, Supply and Construction, Installation, Commissioning of 1.00 MLD Capacity Sewage Treatment Plant cum upto 3 KLD FSTP at Maluka, Distt. Bathinda based on suitable Sustainable proven biological technology includin
Operation and Maintenance of Sewage Treatment Plant of 25 MLD capacity at Abohar for 36 months from period 01.7.2020 to 30.06.2023
DNIT for Operation and Maintenance of Sewage Treatment Plant of 4 MLD capacity at Banur for the year 2021 and 2022
Construction of 500 KLD sewage Treatment Plant based on sutiainable Eco Friendly approach including Operation and Maintenance of MPS and STP for a period of 24 month at Bassi Ise Khan Banur
Part-A Prov. Sew. Scheme Const. of MPS, R/Main and Deep Manhole cum Screening chamber at Mehatpur Town Distt. Jalandhar (under SBM 2.0). Part-B Const. of 2.00MLD cum upto 6KLD FSTP Sewage Treatment Plant.
O and M OF SEWAGE TREATMENT PLANT 7.5 MLD CAPACITY (MBBR TECHNOLOGY) AT RAMPURA PHUL FOR 12 MONTHS PERIOD 01.04.2023 TO 31.03.2024.
Operation and Maintenance of Sewage Treatment Plant 12 MLD Capacity on SBR Technology at Jagraon Distt. Ludhiana for the year 2025-26
Operation and Maintenance of Sewage Treatment Plant 25 MLD Capacity on SBR Technology at Mandi Gobindgarh for the year 2023 to 2024
Operation and Maintenance of Sewage Treatment plant of 14 MLD Capacity (MBBR Technology) at Mansa for 12 months period 01.04.2025 to 31.03.2026
Survey Design Supply Construction Erection and commissioning of 1 No Sewage Treatment Plant STP Cum ETP based on MBR Technology of capacity 125 KLD with OandM of 5 years in TB Sanatorium Amritsar
Operation and Maintenance of Main Pumping Station MPS (Town Area and 10 MLD Sewage Treatment Plant STP at Rajpura for 36 months for the Year 2025-28 01.04.2025 to 31.03.2028 for 36 Months
Design and construction of 15 MLD capacity Main Pumping Station (MPS), 10 MLD capacity Sewage Treatment Plant (STP) based on SBR technology and 5 MLD capacity tertiary treatment plant (TTP) at Aerocity, S.A.S.Nagar
Prov. and Inst. of New G.O. Switch 11 KV H.T. termination end kits, steel structures of GO Switch, Copper earthing for upgrade of Sewage Treatment Plant at 8 MLD STP at Hadiabad Phagwara South.
Operation and Maintenance of 3 MLD Sewage Treatment Plant at Khanauri town Distt. Sangrur for the period of 12 Months (01.04.2026 to 31.03.2027)
Operation and Maintenance of Sewage Treatment Plant of 7.5 MLD Capacity (MBBR Technology) at Rampura Phul for 27.5 Months Period 15.12.2020 to 31.03.2023.
Operation and Maintenance of Sewage Treatment Plant 7 MLD capacity on SBR technology at Rajpura for the Year 2024-25 (24.07.2024 to 31.03.2025)
Operation and Maintenance of Sewage Treatment Plant 4.00 MLD Capacity on SBR Technology and Main Pumping Station at Patran period (01.04.2026 to 31.03.2029).
Operation and Maintenance of Sewage Treatment Plant 10 MLD capacity on SBR technology at Rajpura for the Year 2024-25 (19.06.2024 to 31.03.2025)
Painting of Civil Structure, Painting, Rose Beds, Fine grassing complete in all respects at 6 MLD Sewage Treatment Plant at Jaitu, District Faridkot
Operation and Maintenance of 4 MLD Sewage Treatment Plant at Bhawanigarh town Distt. Sangrur for the period of 10 Months (01.06.2026 to 31.03.2027)
Providing, Installing and Commissioning of Online Continuous Monitoring System, complete in all respects at 12 Nos. Sewage Treatment Plants at Ropar Division and Ludhiana Circle, PWSSB.
OPERATION AND MAINTENANCE OF SEWAGE TREATMENT PLANTS AT 28 PUNJAB IN THE AREA OF AGE U WS II UNDER GE U WATER SUPPLY DELHI CANTT 10
Providing and Installing of Machinery for Replacement or Repair of existing machinery at 25 MLD Sewage Treatment Plant (STP) Based on SBR Technology and all other works contingent thereto at Mandi Gobindgarh District Fatehgarh sahib.
Replacement or Repair of Transformer at Primary Disposal, SCADA Panel and Module at 25 MLD Sewage Treatment Plant (STP) Based on SBR Technology and all other works contingent thereto at Mandi Gobindgarh District Fatehgarh sahib.
Construction of 5.0 MLD Sewage Treatment Plant (STP), including its 5 Years O M and Rehabilitation of Existing 8.70 MLD 3.50 MLD STP at Ballamgarh Road and 5.70 MLD STP at Jallalabad Road and OANDM of STPs for 5 Years at Sri Muktsar Sahib Punjab un
Operation and Maintenance of Sewage Treatment Plant 04 MLD Capacity on SBR Technology at Patran for the year 2025 to 2026 (01.04.2025 to 31.03.2026).
Operation and Maintenance of Sewage Treatment Plant of 4 MLD capacity at Banur for the Year 2022-2023 (1.6.2022 to 31.3.2023) for 10 Month
Repair of sewage treatment plant including cleaning of MBBR, sewage collection sump and connected items at No 1 area at Air Force Station Pathankot
Operation and Maintenance of Sewage Treatment Plant 04 MLD Capacity on SBR Technology at Patran for the year 2024 to 2025 (01.07.2024 to 31.03.2025)
Operation and Maintenance of Sewage Treatment Plant 10 MLD Capacity on SBR Technology at Samana for the year 2022 and 2023 for 8 months
DNIT for Operation and Maintenance of Sewage Treatment plant of 6.50 MLD Capacity MBBR Technology at Budhlada for 12 Months Period 01.04.2021 to 31.03.2022
Up-gradation of existing 10 MGD STP on UASB technology to 15 MGD Sewage Treatment Plant STP at Sector 83 S.A.S Nagar on SBR with advanced Biological Nutrient Removal Technology along with 5 MGD Ultra Filtration UF based Tertiary Treatment Plant TTP
Operation and Maintenance of Main Pumping Station MPS Focal Point Area and 07 MLD Sewage Treatment Plant STP at Rajpura for 36 months for the Year 2025-28 01.04.2025 to 31.03.2028 is equal to 36 Months
Operation and Maintenance of Sewage Treatment Plant of 27 MLD Capacity at Bukan Wala Road District Moga for 12 Months period of (01.04.2025 to 31.03.2026)
Operation and Maintenance of Sewage Treatment Plant 25 MLD Capacity on SBR Technology at Mandi Gobindgarh for the year 2022 and 2023 for 8 months