Loading…
Loading…
22,490 results • Best match
NIT No. 07 (2025-26)/EE(C)DR-III (Re-loaded)
Manning and Operation of packaged Type STP at ARCH, Shokhuvi (Nagaland)
udge from 80mld stp deenapur sludge drying bed to suitable place
Investigation, Design & construction of Physical Infrastructure and Social Infrastructure in EWS layouts at Eluru, Jangareddygudem, Kovvuru, Nidadavolu, Tanuku ULBs in West Godavari district and Design, Supply, Construction, Installation, Testing and ... (8) Sewage Treatment Plants (STPs) ...
Providing Sewage Treatment Plants (STPs) at the locations of 1) M.R Apparao colony II 1.30 MLD in Nuziveedu ULB, 2) P.T Kotturu I 0.40 MLD, 3) P.T Kotturu II 0.40 MLD, in Tiruvuru ULB 4)Gurukulapathasala 1.60 MLD in JaggaiahpetaULB, 5) Hanumanthupalem II 0.20 MLD in Nandigama ULB, 6) Gemini School II 0.90 MLD 7) Gandigunta II 0.30 MLD 8) Raghava Estates II 0.10 MLD in Vuyuru ULB, in Krishna District (Total 5.20 MLD) of Deputy Chief Technical Officer, Guntur Circle, APTIDCO, Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Years basis (including Defect Liability Period of two years from the Date of Completion of Project)
Providing Sewage Treatment Plants (STPs) at the locations of 1) Bala Balaji 0.30 MLD, in Tanuku ULB (2) Indiramma Colony II 0.20 MLD in Tanuku ULB(3) Markendeyapuram II 0.40 MLD in Jangareddygudem ULB, 4) Tirugudem II 0.50 MLD in Nidadavolu ULB 5). Pedathallapunta II 0.30 MLD in Kovvuru ULB 6) Ponangi road 2.50 MLD and 7) (Kotturu road II) 0.20 MLD in Eluru ULB in West Godavari District Total 4.40 MLD of DCTO, Rajamahendravaram Circle, APTIDCO Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Year basis (including Defect Liability Period of two years from the Date of Completion of Project) (3rd call).
Providing Sewage Treatment Plants (STPs) at the locations of 1) Bala Balaji 0.30 MLD, in Tanuku ULB (2) Indiramma Colony II 0.20 MLD in Tanuku ULB(3) Markendeyapuram II 0.40 MLD in Jangareddygudem ULB, 4) Tirugudem II 0.50 MLD in Nidadavolu ULB 5). Pedathallapunta II 0.30 MLD in Kovvuru ULB 6) Ponangi road 2.50 MLD and 7) (Kotturu road II) 0.20 MLD in Eluru ULB in West Godavari District Total 4.40 MLD of DCTO, Rajamahendravaram Circle, APTIDCO Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Year basis (including Defect Liability Period of two years from the Date of Completion of Project) (3rd call).
Investigation, Design & construction of Physical Infrastructure and Social Infrastructure in EWS layouts at Nuziveedu, Tiruvuru, Vuyyuru, Jaggayyapeta ULBs in Krishna, Addanki, Giddaluru, Kanigiri, Ongole ULBs in Prakasam, Tadepalligudem, Bhimavaram, ... (15) Sewage Treatment Plants (STPs) ...
Providing Sewage Treatment Plants (STPs) at the locations of 1). Bala Balaji 0.30 MLD, in Tanuku ULB 2) Indiramma Colony II 0.20 MLD in Tanuku ULB 3).Markendeyapuram II 0.40 MLD in Jangareddygudem ULB, 4) Tirugudem II 0.50 MLD in Nidadavolu ULB 5). Pedathallapunta II 0.30 MLD in Kovvuru ULB 6). Ponangi road 2.50 MLD and 7) (Kotturu road II) 0.20 MLD in Eluru ULB in West Godavari District Total 4.40 MLD of DCTO, Rajamahendravaram Circle, APTIDCO Developed Affordable Housing Projects in Andhra Pradesh on Design, Engineering, Construction, Supply, Installation, Testing, Erection and Commissioning and thereafter Operate and Maintain the STPs for 5 (Five) Year basis (including Defect Liability Period of two years from the Date of Completion of Project).
Construction for sewerage Treatment plant (STP) at TBS Dharampur Distt Solan(SH Site Development of STP at TBS Dharampur)
Construction of Cement Concrete Road at Old Calcutta Road Bye Lane Near STP in Ward No.16
Improvement of Vasant Kunj STP by desilting of drying beds(Re-invite)-1
Annual operational and Maintenance Contract of STP having capacity of 1000 KLD situated at Sector-A of GC CRPF Pallipuram
Provision of machinery, Automation setup, Overhead conveyors, drive units etc. and allied equipments for STP facility at Delhi Bottling Plant
STP Bitumen Felts for Water-Proofing and Damp-Proofing length, STP Bitumen Felts for Water-Proofing and Damp-Proofing length upto 10 meter
STP Bitumen Felts for Water-Proofing and Damp-Proofing length, STP Bitumen Felts for Water-Proofing and Damp-Proofing length upto 10 meter
M/O STP (S/F 500 KVA DG Set with shed and Platform for 54 MLD SPS in STP- Compound, Sector-54)Noida
Nagercoil Corporation Supply Delivery installation and Commissioning of Online Effluent STP Analyzer (BOD, COD, TSS, ph as per TNPCB Guildelines) at Valampurivilai STP
COMPREHENSIVE OPERATION AND MAINTENANCE OF 66 KVA AND 11 KVA SUBSTATION AT STP DIGGIAN MOHALI. CH. TO ANNUAL MTC. OF STP DIGGIAN MOHALI.
Operation, running and maintenance of 15 MLD STP with TTP, providing and fixing of CCTV Camera in 15 MLD STP Sector 28, Panchkula
M/o STP (Supply and Fixing of Light Arrangement, LT, HT armoured Cables and other related Electrical works at STP-123 Compound) NOIDA
M/o STP (Supply and Fixing of Light Arrangement, LT, HT armoured Cables and other related Electrical works at STP -50 Compound) NOIDA
SPL REPAIR TO STP AT DGIS STP IN THE AREA OF AGE U WS NO III UNDER GE U WATER SUPPLY DELHI CANTT10
M/o STP (Supply and Fixing of Light Arrangement, LT, HT armoured Cables and other related Electrical works at STP -168 Compound) NOIDA
C/o STP (Supply and fixing of fully Automation Electrical Operated tower crane (EOT crane) for 50 MLD STP at Sector-168), NOIDA
M/O of STP (Supply and Fixing of Sluice gate for discharge chamber of 50 and 100 mld STP at Sec-168) Noida
M/o Tilpath Valley Bio-Diversity Park. SH - Supply of STP water through tankers from STP Mehrauli to Tilpath Valley Bio-Diversity Park.
M/O STP (S/F 500 KVA DG Set with shed and Platform for 54 MLD SPS in STP- Compound, Sector-54)Noida
M/O of STP (Repairing of Internal CC Road and Construction of Store Room Civil work in Compound of STP Sec-54) Noida
M/o of STP (Reclamation facility of Treated water at existing pond after strengthening and converting into Wetland at STP Sec -54) Noida
Removal of Wet silt in Wet Well at STP-1 near CPI Colony for Maintenance of Sewerage Treatment Plant (STP) in Tadipatri Municipality.
Removal of Wet silt in Wet Well at STP-1 near CPI Colony for Maintenance of Sewerage Treatment Plant (STP) in Tadipatri Municipality.
Tender for Annual operation and Maintenance Contract for 1.2 MLD MBR STP, 10 & 8 KLD SBR STP at Electronics City, Bangalore - 560100, Karnataka.
STP Limited Bituminous compound for water-proofing and caulking purposes used Steel drum Packing MaterialBrand : STP Limited as per Gem Contract GEMC-511687764738055
Custom Bid for Services - 1 Comprehensive maintenance of half MLD capacity automatic waste water recycling plant enable with PLC (Exion-type) Comprising of Automatic Coagulation Plant enable with microprocessor As Mentioned In Scope Of Work And ... Effluent/ Sewage Treatment Plant Operation ... Effluent/ Sewage Treatment Plant Operation ... Effluent/ Sewage Treatment Plant Operation ... Effluent/ Sewage Treatment Plant
REPAIR/REPLACEMENT AND MAINTENANCE OF SEWAGE TREATMENT AND ASSOCIATED INSTALLATIONS INCLUDING REPAIR TO JOINERY, FLOORING ETC AND REPAIR/MAINTENANCE OF WATER SUPPLY INSTALLATIONS SYSTEM (B/R AND INTERNAL ELECTRIFICATION WORKS) AT INSIDE FORT WILLI
Package WB 5 Balance Work of Sewerage Collection, Sewage Treatment and Sewage Disposal System for Bhairunda (Nasrullaganj) town. Sehore District of Madhya Pradesh and Operate and Maintain the Entire Built System for 10 years
PROVIDING E AND M WORK SERVICES AT HAF GHAZIABAD SH RUNNING OPERTION AND MAINTENANCE INCLUDING CONUMABLES MATERIAL OF SEWAGE TREATMENT PLATN OF 125 KLD 300 KLD AND 700 KLD AT AF STATION HINDAN GHAZIABAD
Interception AND Diversion of Nallahs with STP works Project of Obedullaganj town under SBM 2.0
Laying of treated STP water reuse Line in the Campus of New District Jail, Rewari
Deweeding of STP Channel from km 14.330 to km 20.000 and from 20.900 to 26.680
Remedation of legacy waste dumping site near STP, Ramgarh Shekhawati
Civil and Interior works at STP II Building 4th Floor
Repairing of Park boundary wall and other boundarys around SE (SDW)-IVOffice at Okhla STP under EE(C)Plant SDW S/E
THOROUGH REPAIRING AND ROOF TREATMENT OF MAIN PUMPING STATION BUILDING WITH OTHER ANCILLARY WORKS AT BANGUR STP UNDER S AND D DEPTT.
Laying of UGPL HDPE mm for utilization of treated wastewater from STP Mahilpur and Construction of RCC Sumpwell and Pump House with all electric motors and other electric works
STP. 75 HP 20 kl tank suitable for petroleum multiproduct dispensers, STP 1.5 HP 20 kl tank suitable for petroleum multiproduct dispensers, STP 1.5 HP 70 kl tank suitable for petroleum multiproduct dispensers
STP CABLE LAYING (INCLUDING INSTALLATION WITHIN CABLE TRAY/CONDUIT)
BUTTERFLY CONTROL VALVE FOR STP TREATED WATER PIPE (Q3)
Const. of Composting Centre at Basti Peer Daad STP.