Loading…
Loading…
22,493 results • Best match
Selection of Service Provider/Agency/Contractor / Company for Operation and Maintenance of FSTP in Vedaranyam Municipality for the period of three years
Selection of Concessionaire for Design-Build-Operate-Transfer of a 10 KLD FSTP for 3 years office and maintenance in Nalbari Town
Installation Of Inline Transformer For Electrical Supply For FSTP plant situated at waste collection plant Survey No 265 For Municipal Council Jalna
Construction of Chian link fensing on Bhumapan No. 49 as compounding for FSTP at SWM site at Nagar Panchayat Kuhi, Dist. Nagpur.
Construction of 3.0 KLD Facal Sludge treatment plant (FSTP) at Kotmaira Pahariwala Upper Panchayat Block, Khour District, Jammu under SBM 2.0 component
Proposed Construction of Cement Concrete Road Upto FSTP Under the Solid Waste Management Project At Ward No. 06 For Newasa Nagarpanchayat, Newasa
PROPOSED CIVIL WORKS OF FECIAL SLUDGE TREATMENT PLANT (FSTP) UNDER SWACHHA MAHARASHTRA MISSION FOR MANMAD MUNCIPAL COUNCIL MANMAD DIST NASHIK TAL NANDGAON
Selection of Service Provider Agency Contractor Company for Operation and Maintenance of FSTP in Attur Municipality for the period of three years
Selection of Concessionaire for Moving Bed Bio Reactor (MBBR) technology based project of a 15 KLD FSTP for 3 years in Jorhat
SELECTION OF SERVICE PROVIDER AGENCY CONTRACTOR COMPANY OF OPERATION FOR MAINTENANCE OF FSTP IN SIRKALI MUNICIPALITY FOR THE PERIOD OF THREE YEARS
LAYING OF CC ROAD IN DUMPING YARD FROM DRCC SHED TO TILL FSTP IN MCGP UNDER MUNICIPAL PATTANA PRAGATHI GRANTS 2021- 22.
LAYING OF CC ROAD IN DUMPING YARD FROM ENTRENCE GATE TO TILL FSTP IN MCGP UNDER MUNICIPAL PATTANA PRAGATHI GRANTS 2021-22.
Selection of Concessionaire for Design-Build-Operate-Transfer of a 10 KLD FSTP for 3 years in Golaghat Town, Ward No. 01
Proposed Cost Estimate of STBT and C.C.Road in FSTP center to water purification center Area For Amalner Municipal Council, Amalner Dist Jalgaon
Annual Plan SO 877/2026-Anual Plan 2025-26 Thrissur corporation Vilvattom Zonal construction Toilet in Mattampuram FSTP plant-General Civil Work
Removal of Garbage,Levelling,sectioning,Providing water Supply and power supply facilities to the FSTP site beside Dumping yard of Narsipatnam Municipality
Supply Installation O and M of ERP Remote Online Monitoring Software at 225 MLD STP Jamalpur and 60 MLD STP Balloke Ludhiana at District Ludhiana.
M/o STP (Supply and Fixing of Light Arrangement, LT, HT armoured Cables and other related Electrical works at STP -54 Compound) NOIDA (Two Years)
O/M of STP (Repairing and maintenance of submersible motor pump and starter for Dewatering system form sump at 50 MLD STP Sector-168) Noida
M/o various Bio-diversity Park under South Zone. SH - Supply of STP water through tankers from STP Mehrauli to Tilpath Valley Bio-Diversity Park.
M/o STP -54 (Two Year repair of PVC/M.S. Irrigation lines in different park and green belt of connected Sectors for STP-54) Noida.
Repair and Overhauling Service - STP CABLE LAYING (INCLUDING INSTALLATION WITHIN CABLE TRAY/CONDUIT); STP CABLE LAYING (INCLUDING INSTALLATION WITHIN CABLE TRAY/CONDUIT); Yes; Buyer Premises
Improvement of link road to STP Malyana Shimla H.P.( SH C/O Retaining Wall and earth work and improvement of link road to STP Malyana)
Work contract for repair and maintenance of STP/ETP and WTP and operation of STP/ETP at B.M. Airport Ranchi for the Year 2024- 2026.
Construction of steel footbridge to link the 45 MLD STP and 30 MLD STP in Badshahpur zone over the Buria nallah with all contingent works.
Repair and modification of pipeline from STP to different section or building for use of treated water of STP for Horticulture purpose at Jayant Project.
Construction of 40 KLD STP and Sump Tank in the premises of Taluk Level Hospital in Nanjangudu, Mysore District. (Including STP, ETP, Bio Medical Waste)
M/o various bio-diversity park under south zone. SH - Supply of STP water through tankers from STP Mehrauli to Tilpath Valley Bio-Diversity Park.
Construction of CRS chamber and De-silting of trunk sewer 900mm Dia from Hasan Nagar to 10MLD STP at Miralam under STP Division-II, Goshamahal
AMRUT-Comprehensive Proposal for Infra structure Enhancement of STP at Medical College-Comprehensive Proposal for Infra structure Enhancement of STP at Medical College-Sewerage Work
Providing and fixing of Gear Belts of blowers system at 30 MGD MBBR Thermax at STP Diggian Mohali Chandigarh Ch to A Mtc of STP
M/O of STP (C/o CC Road Parallel to back side boundary wall and Tile Work in CCT at STP Compound Sector - 50) Noida
PROVN OF CHAIN LINK FENCING AND APPROACH PATH AROUND STP PLANT, OUTDOOR TRANSFORMER, DG SET ,CHILDREN PARK AND SHED FOR STP AT SONARI JUNGLE PORBANDAR
MANNING AND OPERATION OF MEENA STP INCLUDING REPLACEMENT OF EXTERNAL RAW WATER SUPPLY LINE AND ASSOCIATED WORKS OF STP UNDER GE NW NOFRA COLABA MUMBAI
REPLACEMENT OF EXTERNAL RAW WATER SUPPLY LINE AND ASSOCIATED WORKS OF STP INCLUDING MANNING AND OPERATION OF MEENA STP UNDER GE (NW) NOFRA COLABA MUMBAI
M/o STP (Two years Maintenance of Irrigation line from UGR, STP-50 to J-Block, Sector 41 and Golf Course to Botanical Garden) Noida
Maintenance of STP laboratory for analysis of sewage samples in 13MLD STP at mudasarlova in Zone-II of G.V.M.C for the period of one year.
Operation & Maintenance of 1MLD Capacity STP based on Activated sludge process and lifting of effluent & safe disposal from 1MLD STP located at RGUKT, Nuzvid Campus
Maintenance of STP laboratory for analysis of sewage samples in 25 MLD STP at Appughar Zone- III of G.V.M.C for a period of one year.
Operation & Maintenance of 1MLD Capacity STP based on Activated sludge process and lifting of effluent & safe disposal from 1MLD STP located at RGUKT, Nuzvid Campus
Operation & Maintenance of 1MLD Capacity STP based on Activated sludge process and lifting of effluent & safe disposal from 1MLD STP located at RGUKT, Nuzvid Campus
Comprehensive maintenance and day to day operation of 50 KLD STP Plant
CONSTRACTION OF CHAMBER AND LAYING OF D.I. PIPE FROM THE MAIN NIKASHI DRAIN TO INLET CHAMBER OF NEW PUMPING STATION AT KEORAPUKUR STP, UNDER BR- XIII
Rewinding and heat varnishing of 7 nos damaged motors of Grit chamber,PST 1,Aeration tank of STP with other allied works at Bangur STP under MDPS.
Strengthening of existing boundary wall adjacent to IUAC University at Vasant Kunj STP(Re-invite)-1
Annual maintenance estimate of 5 MLD STP at Narnaul for the year 2024-2025
STP CABLE ( 1000 meter ) Brand Type Unbranded, SATA CABLE ( 50 pieces ) Brand Type Unbranded
Misc. Civil Works for Commissioning of STP 2.25MLD and 1.25MLD at Chennai Airport, Chennai
Providing and fixing of water flow measurement meter size 300mm i/d at STP
Item 10: M9419056109: ACTUATOR FOR LPBP STP V/V, TYPE: GHZ125: