Surveying Soil investigation design and Supply of all materials labour TP etc complete required for completion of following works of Dostpur Nagar Panchayat Reorganization Water Supply Scheme on turn key basis
Surveying Soil investigation design and Supply of all materials labour TP etc complete required for completion of following works of Amethi Nagar Panchayat Reorganization Water Supply Scheme on turn key basis
Surveying Soil investigation design and Supply of all materials labour TP etc complete required for completion of following works of Nagar Panchayat Kadipur Water Supply Reorganization Scheme on turn key basis
Surveying Soil investigation design and Supply of all materials labour TandP etc complete required for completion of works of Lambhua Nagar Panchayat Water Supply Reorganization Scheme as given in bid document
As per NIT and Tender Document
Survey Soil investigation Design Supply of all material labour T P required for completion Testing Commisioning of Water Suplly such RCC OHT CWR Rising Main Distribution System Pump house Boundary Wall etc
Surveying, Soil investigation, Design, Supply of all materials, labour T P etc. Required for construction, erection, completion, testing commissioning of water supply works such as OHT, Pump House, staff quarters etc Complete
Survey, Soil investigation, Design, Supply of all materials, labour, TP etc. required for Construction, Testing, Commissioning of RCC Over Head Tank, CWR cum Pumphouse, Rising Main, Distribution System and construction of Tubewells.
Hiring of Consultants - Milestone/Deliverable Based - Subject Matter Experts, Consultancy Services for Soil Investigation, Structural Analysis and Design and detailed Cost Estimates for DSC Platoon at Kanpur.; Engineering Design; Yes; Hybrid(As speci..
Survey Soil investigation Design Supply of materials labour T and P etc required for construction erection completion testing and commissioning of water supply works for KANNAUJ NAGAR PALIKA PARISHAD WATER SUPPLY REORGANISATION SCHEME
Survey Soil investigation, Design, Supply of all materials etc. Required for construction of Over Head Tanks, CWR, SCADA room, Rising Main, Distribution Network, House connection, Boundary wall, MS gate, site development work etc.
Soil investigation, Survey, Design, Supply of all materials, Labour, required for construction, erection, completion, testing and commissioning of water supply works such as repairing of RCC OHT,Rising main, Distribution system,Tube wells etc.
Survey Soil investigation Design Supply of all materials labour TandP etc required for construction erection completion testing and commissioning of water supply works such as RCC OHT Pumping Station Rising main Feeder main Distribution
Survey Soil investigation, Design, Supply of all materialsetc. Required for construction of Tube Wells,Pump House,Over Head Tanks, SCADAroom, Rising Main, Distribution Network, House connection,Boundary wall,MS gate,site development work etc.
Survey, soil investigation, design, supply of all materials, labour, TP etc. for construction, erection, completion, testing and commissioning of water supply works such as RCC OHT, CWR cum pump house, rising main, distribution System
SOIL TESTING FOR PROVISION OF SUMP AND PUMPING STATION TO FEED POTABLE WATER INSIDE FACTORY AT OFC KANPUR under GE (I) (P) (Fy) Kanpur
Survey, Soil Investigation, Design, Supply of all materials, labour, etc required for construction, completion, testing and commissioning of water supply works such as RCC OHT, CWR, TW with PLC SCADA, Rising Main, Distribution System, etc
Surveying Soil investigation design and Supply of all materials labour TP etc complete required for completion of following works of Sewerage Scheme for Administrative Campus of Dr Ram Manohar Lohia Awadh University Ayodhyanon turnkey basis
Surveying soil investigation engineering design and supply of all materials labour TandP etc complete required for completion of following works of Nagar Panchayat Pratapgarh City Re organization Water Supply Scheme Pratapgarh on turn key basis
Soil investigation, Design, Supply of all materials, Labour, TanP etc. required for construction, completion, testing and commissioning of water supply works such as RCC OHT, UGR, Rising main, Distribution system, Tube wells, Pump house, etc.
Survey Soil investigation Design Supply of all materials labour T and P etc required for construction erection completion testing and commissioning of water supply works such as RCC OHT Rising main Distribution System HC etc
Soil Testing / Investigation at NH, Railway Power Line crossings of 132 KV Pilibhit - Pilibhit TSS Line at 132KV S/S Pilibhit under ETD-II, Bareilly
Surveying Soil investigation design and Supply of all materials labour TP etc complete required for completion of following works of Sewerage Scheme for Teachers Campus of Dr Ram Manohar Lohia Awadh University Ayodhya on turnkey basis
Surveying, soil investigation, design and supply of all materials, labour, T and P etc. complete required for Construction, Erection, Completion, Testing and Commissioning of Water Supply Works such RCC Over Head Tank, CWR, Rising Main, Distribution
Survey Soil investigation, Design, Supply of all materials etc. Required for construction of Over Head Tanks, CWR, Tube well, Pump House, SCADA room, Rising Main, Distribution Network, House connection, Boundary wall, MS gate, SCADA automation etc.
Surveying, Soil investigation, Design, Supply of all materials etc. Required for construction of Over Head Tanks, CWR cum Pump house , SCADA Automation of all CWR, Rising Main, Distribution Network, House connection, Boundary wall, MS gate etc
Surveying Soil investigation Design Supply of all materials labour T P etc Required for construction erection completion testing commissioning of water supply works such as OHT Pump House staff quarters SCADA Room Rising Main etc Complete
Supply and Installation of Plate load testing machine of Geotechnical Lab of Civil Engineering Department
Supply and Installation of Digital Consolidation Testing machine of Geotechnical Lab of Civil Engineering Department
Supply and Installation of Digital UCS Testing machine of Geotechnical Lab of Civil Engineering Department
Conducting soil investigation, Conducting standard penetration, Depth of bore hole 15 m, Collecting disturbed and undisturbed, Conducting following lab test on disturbed soil, Conducting following lab test, Analysis of liquefaction, Ground Water ... of Soil investigation Report, ...
Soil investigation, survey, Design, Supply of all materials, Labour, T and P etc. required for construction, completion, testing and commissioning of water supply works such as RCC OHT, Rising main, Distribution system, Tube wells, Pump house, etc.
Survey Soil investigation Design Supply of all materials labour TandP etc required for construction erection completion testing and commissioning of water supply works such as Intake well WTP RCC OHT ZPS CWR cum Pumping Station Rising main
Survey Soil investigation Design Supply of all materials labour TandP etc required for construction erection completion testing and commissioning of water supply works such as Intake well BPT WTP RCC OHT ZPS CWR cum Pumping Station Rising
Survey Soil investigation Design Supply of all materials, labour, T and P etc for Construction, Erection, Completion, Testing and Commissioning of Water Supply Works in Madhuban Nagar Panchayat Water Supply Scheme under Amrut 2.0 in District Mau
Survey Soil investigation, Design Supply of all materials labour TandP etc required for construction erection completion testing and commissioning of water supply works such as Intake well WTP RCC OHT ZPS CWR cum Pumping Station Rising main
Survey Soil investigation Design Supply of all materials labour TandP etc required for construction erection completion testing and commissioning of water supply works such as Intake well BPT WTP RCC OHT ZPS CWR cum Pumping Station Rising
Job works for soil testing as per plant capacity of 0.5 MW at EBS Babugarh (AMWP 19-20 List L-IV ser 16 GE (U) Meerut Cantt.
Survey soil investigation design supply of all materials labour T and P etc required for construction erection completion testing and commissioning of water supply works such as RCC over head tank CWR cum pump house rising main distribution
Surveying soil investigation engineering design and supply of all materials labour TP etc complete required for completion of following works of Water supply scheme for Naini Extended Area (Surface Water) in Nagar Nigam, Prayagraj on turn key basis
As per NIT
Survey Soil investigation Design Supply of all materials labour T and P etc. for Construction Erection Completion Testing and Commissioning of Water Supply Works such as OHT Tube well Rising Main Distribution System Pump House in Phulpur NP Azamgarh
Surveying Soil investigation design and Supply of all materials labour T and P etc. complete required for completion of following works of Package 1 of Nagar Nigam Ayodhya Sewerage Scheme District 1 Part II and District 1 Part I Zone 1 and 2
Surveying Soil investigation design and Supply of all materials labour T and P etc. complete required for completion of following works of Package 2 of Nagar Nigam Ayodhya Sewerage Scheme District 1 Part II and District 1 Part I Zone 1 and 2
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - Civil, Soil Testing and Investigation for certain wks forOPs Infra; Specific gravity, Chemical analysis, Consistency, Moisture content, Substance (GSM), Smoothness/p..
Comprehensive Consultancy Services including suggestion for upgradation scheme of existing buildings in the NTIPRIT previously known as ALTTC Center at Ghaziabad campus as well as providing preparation of digital survey plan of campus soil testing of site conceptual drawings detailed working drawings section and elevation structural design drawings civil and electrical services drawing including approval from the client and local statuary body wherever required and preparation of preliminary estimate cum detailed estimate of building suggested for renovation and preparation of master plan of whole campus including old building and proposed new buildings
Cost Estimate for work of GPS Survey and Soil Investigation for Height Raising Shifting between Tower Loc No 184 A 0 and 185 A 0 Section Loc No 182 B 0 to 191 B 0 of 220 KV PGCIL Raebareli CG City PGCIL Raebareli Bachhrawan Double Circuit Transmis
CONDUCTANCE OF ADEQUACY CHECK OF EXISTING FOUNDATION/ STRUCTURE AND GEOTECHNICAL TEST FOR RENOVATION AND RETROFITTING OF ESPs AT 3X210 MW ANPARA A TPS OF UPRVUNL.
Boreholes of soil pits, CBR test, Plate Load test, Particle size analysis of soil, Tri Axial Test, Soil Properties, Density and moisture contents, Determination of organic material, Permeability test, Determination of chlorides and sulphates, ... test, Soil investigation report
SOIL INVESTIGATION, SEISMIC ANALYSIS, LABORATORY TEST, ATTERBERGS LIMITED, NWC, BADD, SGAVR, SA, SL, CORE RECOVERY, PLT, GTI, DRILLING THROUGH ROCK, BORING, CROSSING SURVEY, CSR, PR, PNHR, PNHC, PSHA, PSHC, CANAL, RIVERS, WATER BODIES, GPR, DEVELOPMENT AUTHORITY, PAA, IDENTIFICATION, REGISTRATION, CLU, ILA, PM, PSF, RESERVED FOREST, PPCBA, OPC, RS, DS, CORROSION SURVEY, ASM, DMNOC, BASIC PESO, PESO, FL CTE, FL, BUILDING, DF, DFPI, PWD, NHAI, FOREST, MDPE, CADASTRAL